Proposal and Eval Criteria for SMP Power Transfer Kits and Installs.pdf
PDF 131 KB Posted
- Attached to
- Special Mission Processor (SMP) Power Transfer Kits and Installs Federal contract opportunity
- Solicitation number
- FA850922R0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FOPR_FA850922R0023_Amend 1.pdf | ||
| Pwr Trans BOM_rev 1_20220125 Updated 2-18-22.zip | ZIP file | |
| Performance Work Statement_SMP Power Transfer.pdf | ||
| FORM 158.pdf | ||
| FORM 1653.pdf | ||
| FOPR_FA850922R0023.pdf | ||
| PR-22-31178-CDRLs-Final-23-Jun-2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal and Eval Criteria for SMP Power Transfer Kits and Installs
M - EVALUATION BASIS FOR AWARD
Lowest Price Technically Acceptable (LPTA) - Selection process where the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
Technical Factors to be rated as Acceptable/Not-acceptable:
Factor 1: Technical Approach
Technical Approach: narrative must describe your manufacturing process, kit subcomponent labeling, planned OEM interaction, and or previously used sources
This element is acceptable when the detailed narrative adequately describes, within your technical approach, your manufacturing processes, kit component labeling, and OEM sub-contract plan.
Factor 2: Kit Production Plan
Technical approach must provide a detailed production plan as referenced in the Performance Work Statement. This plan must include, but not limited to:
a. Parts Procurement and delivery Plan
b. Manufacturing Startup Timeline
c. Production Quality Process
d. Production Risk Management Plan
This element is met acceptable when the detailed narrative adequately describes, within your technical approach, the following elements: Parts Procurement and delivery plan, manufacturing startup plan, Production Quality process, and production risk management plan.
Factor 3: Kit Installation Plan
Technical approach must provide a detailed kit installation plan.
This plan must include, but not limited to:
a. Install Plan
b. Quality Assurance
c. Maintenance Concept
d. Tool Plan
e. HAZMAT
f. Base Access
g. Safety
h. Aircraft Signoff
This element is acceptable when the detailed narrative adequately describes, within your technical approach, your Install Plan, Quality Assurance, Maintenance Concept, Tool Plan, HAZMAT, Base Access, Safety, and Aircraft Signoff.
Factor 4: ICS
Technical approach must provide a detailed plan to support any issues with kit manufacturing or kit installation.
This element is acceptable when the detailed narrative adequately describes, within your technical approach, your plan to address, and correct any issues with kit manufacturing and kit installation.