This document is a project manual for the Town of Valdese - Draughn Aquatic Center Structure construction project. The project consists of modifications to the exterior wall adjacent to the pool, installation of a pre-engineered membrane structure over the pool and pool deck, and installation of mechanical, electrical, and plumbing systems in the new structure. Sealed bids will be received from invited general contractors only, and a pre-bid meeting for all interested bidders will be held. Bids must be submitted by a specific date and time, and a bid bond in the amount of 5% of the base bid will be required. The contract will be awarded to the lowest responsible bidder, and the successful bidder will be required to provide performance and payment bonds. The project must be completed within a specified number of consecutive calendar days.
The bid pricing must include all materials, labor, and equipment required to complete the work, but exclude state and local sales tax. The contract documents provide details on allowances, unit prices, and bid alternates that may be included in the base bid. The contract will be awarded based on the base bid plus any alternates the owner chooses to include. Substitutions of materials or products must be approved prior to the bid due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEALS-1
TOWN OF VALDESE
DRAUGHN AQUATIC CENTER STRUCTURE
PROJECT NO. 24-858
09.23.24
Corporate Seal Walter Robbs Architects, a Michael Graves Company
Architectural Walter Robbs Architects, a Michael Graves Company
Structural SKA Consulting Engineers
TOC-1
24-858
TABLE OF CONTENTS
BIDDING REQUIREMENTS AND INFORMATION
Advertisement for Bids Instruction to Bidders County Sales & Tax Report (NC) Bid Form Bid Bond (A310)
SAMPLE CONTRACT FORMS AND PROJECT INFORMATION:
Performance Bond (A312) Payment Bond (A312) General Guarantee Roofing Warranty Asbestos Free Warranty
CONDITIONS OF THE CONTRACT:
General Conditions of the Contract for Construction (A201) Supplementary General Conditions (To A201 General Conditions)
SPECIFICATIONS:
DIVISION1 – GENERAL REQUIREMENTS
01 11 00 Summary of the Work 01 12 00 Owner Occupancy During Construction 01 20 00 Allowances & Unit Prices 01 31 00 Project Meetings 01 33 00 Submittals 01 35 50 Product Requirements 01 42 00 Reference Standards & Layout Work 01 50 00 Temporary Facilities 01 61 00 Materials and Equipment 01 63 00 Product Substitutions 01 73 00 Cutting and Patching 01 74 00 Cleaning Up 01 75 00 Documents at Project Site 01 78 00 Contract/ Project Close-Out 01 83 00 Equipment Maintenance and Operations Program
DIVISION 2 – EXISTING CONDITIONS
02 41 19 Selective Demolition
TOC-2
DIVISION 3 - CONCRETE
03 10 00 Concrete Formwork 03 20 00 Concrete Reinforcement 03 25 00 Adhesive Anchors 03 30 00 Cast in Place Concrete
DIVISION 4 - MASONRY
04 06 00 Masonry Mortar 04 20 00 Unit Masonry
DIVISION 5 - METALS
See Drawings for Structural Engineering specifications
05 50 00 Miscellaneous Metal Fabrications
DIVISION 6 - WOOD AND PLASTICS
06 10 00 Rough Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 14 00 Fluid Applied Waterproofing (Prosoco Fastflash) 07 20 00 Rigid Insulation 07 21 16 Flexible Insulation 07 53 00 Fully Adhered Thermoplastic Polyolefin (TPO) Roofing 07 62 00 Flashing and Sheet Metal 07 90 00 Sealants
DIVISION 8 - DOORS AND WINDOWS
08 11 00 Hollow Metal Doors and Frames 08 33 60 Overhead Rolling Doors 08 51 00 Steel Windows 08 80 00 Glass and Glazing
DIVISION 9 - FINISHES
09 29 00 Gypsum Drywall 09 91 00 Field Painting
DIVISION 10 – SPECIALTIES (not used)
DIVISION 11 – EQUIPMENT (not used)
DIVISION 12 – FURNISHINGS (not used)
TOC-3
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 00 Pre-Engineered Structures
DIVISION 14 - CONVEYING SYSTEMS (not used)
DIVISION 21 – FIRE PROTECTION
See Drawings
DIVISION 22 - PLUMBING
DIVISION 23 - MECHANICAL
DIVISION 26 - ELECTRICAL
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
END OF TOC
ADV-1
ADVERTISEMENT FOR BIDS
Sealed Bids will be received by ___________________________________________ at __________ p.m., ___________, 202_; at which time the Bids will be opened and read publicly for the construction of the following:
Town of Valdese – Draughn Aquatic Center Structure
Bids will be received from invited General Contractors only and their bids will include general construction, plumbing, HVAC, electrical, plumbing, civil, audio/visual and all work indicated by the Bidding Documents.
Digital copies of the Bidding Documents will be available from the Architect’s Office to invited General Contractors. General Contractors will be required to share the Bidding Documents with their sub-contractors.
Digital copies of the Bidding Documents will not be available to sub-contractors from the Architect’s Office.
Invited General Contractors may purchase printed, full sets of the Bidding Documents from The Sharpe Company, 800-688-0629.
The project consists of:
Modifications to the exterior wall adjacent to the pool, installation of pre-engineered membrane structure over pool and pool deck, installation of mechanical, electrical, and plumbing systems in new structure.
Bidders must be properly licensed Contractors in accordance with applicable North Carolina state law.
Bids must be on the standard form provided by the Architect and must be marked to identify the type of Prime Contract noted.
Bidders shall use complete sets of Bidding Documents in preparing Bids; neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
An open pre-bid meeting will be held for all interested bidders and vendors.
A Bid Bond will be required with each Bid. The Bond shall be in the sum equal to 5% of the gross Base Bid.
A Payment and Performance Bond will be required each in the sum equal to 100% of the Contract Sum.
No Bidder may withdraw his Bid within 30 days after the opening thereof.
The Owner reserves the right to accept or reject any or all Bids, and to waive informalities.
Owner:
IB-1
INSTRUCTIONS TO BIDDERS
1.0 QUALIFICATIONS OF BIDDERS:
a. Any Bidder that can show evidence that he is a responsible Bidder, that can secure the required bonds and insurance, that has a record of completing work correctly and on time, that has a qualified staff, is properly equipped, and is properly licensed as required below, may submit a Bid.
1. All Bidders must be properly licensed Contractors in accordance with state laws governing their respective trade.
2.0 BID EVALUATION:
a. The award of the Contract will be made to the lowest responsible Bidder as soon as practical. The Owner may award based on the Base Bid and any alternates the Owner chooses.
b. Before awarding a Contract, the Owner may require the apparent three (3) low Bidders to qualify themselves to be responsible Bidders by furnishing any or all the following data:
1. The latest financial statement showing assets and liabilities of the company or other information satisfactory to the Owner.
2. A listing of completed projects of similar size and complexity.
3. Permanent name and address of place of business.
4. The number of regular employees of the organization and length of time the organization has been in business under present name.
5. The name and home office address of the Surety proposed and the name and address of the responsible local claim agent.
6. The names of members of the firms who hold appropriate trade licenses, together with license numbers.
7. A list of references.
8. A detailed inventory of personnel and equipment proposed to be used on the
Project.
9. A detailed resume of the resident superintendent responsible for the Project.
10. Banking, insurance and bond company references.
11. A list of any pending claims filed against the bidder.
12. A list of all current projects under contract.
13. Other information requested by the Owner or representative and necessary to determine that the Bidder is a responsible Bidder.
c. Failure or refusal to furnish any of the above information, if requested, shall constitute a basis for disqualification of any Bidder.
IB-2
d. In determining the lowest responsible Bidder, the Owner will take into consideration the past performance of the Bidder with concern given to completion times, quality of work, cooperation with other contractors, and cooperation with the Designer and Owner.
e. Should the Owner adjudge that the apparent low Bidder is not the lowest responsible Bidder by the above information, said apparent low Bidder will be so notified and the bid security shall be returned.
3.0 SITE VISITATION AND EXISTING BUILDING:
a. Before submitting a Bid for this work, each Bidder shall examine the premises and understand the effect existing conditions may have on work under the Contract. No allowances will be made subsequently, in this connection, for any error or negligence on Bidder’s part. Because there are no existing conditions drawings, a mandatory pre-bid site walk will be conducted on October 3, 2024 at 10:00am, where the Owner will make available access to the roof and other areas within the scope of the project. It shall be the Contractor’s responsibility to conduct all work as required to protect from damage existing construction to remain in place.
4.0 OTHER BIDDERS:
a. It shall be the responsibility of each Bidder to become familiar with the Bidding Documents relevant to the other Bidders so that the relationship between other contractors and Bidder will be clear.
5.0 PREPARATION OF BID:
a. Each Bid shall be prepared on the clean copy of the Bid Form bound in the Project Manual.
The sample Bid Form bound with the Project Manual shall not be used. The Bidder shall indicate the correct name, address, and license number in the space provided at the top of the first page of the Bid Form.
b. Each Bidder shall indicate again the correct name on the last page of the Bid Form above the signature. Bids by individuals must be signed by the person bidding. Bids by a construction company with sole owner shall be signed in the name of the company by the owner of the company. Bids by partnership shall show the full name of all partners and shall be signed in the name of the partnership by one of the partners.
c. Bids by corporations shall indicate the legal name of the corporation followed by the name of the State of incorporation; and shall be signed by the president or vice president of the corporation. The signature of a person authorized as agent to bid will be acceptable provided the Bid is accompanied by a proper power-of-attorney. Bids by corporations shall have the corporate seal affixed adjacent to the signature.
d. All signatures shall be in ink, and the name of the person signing shall be typed also or printed below the signature followed by a title showing the relationship to the bidding organization such as: "Owner" in the case of a sole owner; "Partner" in case of a partnership; "President", "Vice President", "Secretary", or "Treasurer", in the case of a corporation; or "Agent" in the case of someone acting as agent or attorney-in-fact. A Bid by a person who affixes to the signature the word "President", "Secretary" or "Agent", etc., without disclosing the name of the organization may be held as an individual Bidder.
6.0 STATEMENT OF BIDDERS QUALIFICATIONS:
a. The statement of Bidder's Qualifications which is included as a part of the Bid Form must be completed and submitted with the Bid Form.
b. Failure to comply with this requirement may result in disqualification of the Bidder.
IB-3
7.0 BASE BID AND ALTERNATES:
a. The amount of the Base Bid shall be typed or printed in both words and figures, and shall be the total charge for the Project, including all Cash Allowances but not including any Bid Alternates. Under this shall be shown the type of Contract, such as "General" "Plumbing", "HVAC", "Electrical", or "Food Service Equipment".
b. If an alternate called for does not, in the Bidder's judgement, require a change in the Base
Bid price, the Bidder shall so indicate by writing the words "No Change" in the space provided on the Bid Form for the amount to be added. Each Bidder shall consider how the various alternates will affect the Alternate Bid Price.
c. A detailed description of each Cash Allowance and Bid Alternate may be found in Section
01200 - Alternates, Allowances and Unit Prices, of these Specifications.
8.0 UNIT PRICES:
a. Bidders shall submit unit prices required by the Bid Form.
9.0 TAXES:
a. Bidders are cautioned that the General Assembly has amended the Sales and Use Tax Law to require that the State of North Carolina and its political subdivisions pay all applicable State sales and use taxes on their purchases of taxable tangible personal property.
b. Pursuant to carrying out the provisions of G.S. 105-164, each Bidder shall be registered with the Sales and Use Tax Division of the North Carolina Department of Revenue.
c. All applicable taxes shall be included in the Base Bid submitted by the Bidder.
d. It shall be the duty of the Contractor to give the Owner the advantage of all exemptions or credits in the matter of Federal taxes to which governmental agencies are entitled.
10.0 TIME OF COMPLETION:
a. The number of consecutive calendar days allowed for completion of the Project is stated on in the Supplementary Conditions and on the Bid Form.
11.0 ADDENDA:
a. If any person contemplating submitting a Bid for the proposed Contract is in doubt as to the true meaning of any part of these proposed Contract Documents, he may submit to the Architect a written request for an interpretation thereof in time to be received by the Architect not later than seven (7) days prior to the date established for the opening of Bids. The person submitting the request shall be responsible for its delivery.
b. Any interpretation of such documents will be made only by Addendum duly issued, and a copy of such Addendum will be mailed or delivered to each Prime Bidder receiving a set of documents.
c. The Owner will not be responsible for any other explanations or interpretations of such documents which anyone presumes to make on behalf of the Owner before Bid Opening.
d. It is the responsibility of each Prime Bidder to verify for himself that he has received all
Addenda; and that material suppliers and subcontractors are familiar with and include in their price all Addenda issued up to the time for Bid Opening.
e. The Bidder shall state the number and date of each Addenda received in the appropriate space on the Bid Form.
IB-4
12.0 SUBSTITUTIONS:
a. Where any material or equipment is specified by name, or by identification of one or more specific manufacturers, and there are words such as "or approved equal" following the manufacturer(s) listed, then the Bidder may submit equivalent products for consideration for approval for use on the Project. Product must be equivalent in general appearance, construction, quality, and performance to that specified.
b. Any request for approval shall be submitted in writing only by a Prime Bidder and shall be accompanied by sufficient data for use in consideration by the Architect. Request shall be received by the Architect at least 10 days prior to date set for receipt of Bids.
c. Include a copy of the project specification section with a detailed comparison of the proposed substitution versus the specified product entered thereon. Annotate any differences between the specified product and the proposed product.
d. All manufacturer's and other literature submitted must be reviewed and marked-up by the submitter differentiating between applicable and inapplicable information and annotating any differences between the specified product and the proposed product.
e. Submittal must indicate any changes or modifications needed to other parts of the work that will be necessary to accommodate the proposed substitution.
f. If the material or equipment submitted for consideration is approved by the Architect for use on the Project, the Architect will include approval of such item of material or equipment in an Addendum.
g. No substitutes will be allowed without written approval of the Architect. Verbal conversations are unofficial and do not change the requirements of the bidding documents in any way.
h. No substitution will be considered after Contracts are signed except as permitted by the
General and Supplementary General Conditions.
i. In the event that the Contractor proposes and receives approval to use a substitute product upon which the Drawings and Specifications are not based it will be Contractor’s responsibility to provide the required coordination and to take whatever actions necessary to insure that the adjacent construction is properly installed to receive the product; to insure that the product is properly installed including all supplementary and accessory components required for the product to work with the construction shown on the Drawings; to make any modifications necessary in order for the product and contiguous or adjacent construction to fit together and work properly; and to do these at no additional cost to the Owner.
j. By making a request for substitution, the Contractor:
1. Represents that the Contractor has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified.
2. Represents that the Contractor will provide the same warranty for the substitution as for the product specified.
3. Certifies that the cost data presented is complete and includes all related costs under this contract except the Architect's redesign costs and waives all claims for additional costs related to the substitution which subsequently become apparent.
4. Certifies that the Contractor will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects.
IB-5
13.0 BID BOND:
a. No Bid will be considered or accepted unless accompanied by a Bid Guarantee in the form of a deposit equal to 5% of the gross Base Bid. This deposit may be cash; or a cashier's check issued by, or a certified check drawn on a Bank or Trust Company authorized to do business in North Carolina or on a Bank insured by the Federal Deposit Insurance Corp.; or a U. S. Money Order, each payable to the Owner. The deposit will be retained by the Owner if the Bidder fails to execute the Contract within 10 days after notice of the award is given, or if the Bidder fails to give satisfactory surety as required and called for in the Conditions of the Contract.
b. In lieu of making the cash deposit as above provided, any Bidder may submit with the Bid a
Bid Bond in the sum of 5% of the gross Base Bid executed by a corporate surety licensed under the laws of North Carolina to execute such bonds, conditioned that the surety will (upon demand) forthwith make payment to the obligee upon said bond if the Bidder fails to execute the Contract within 10 days after notice of the award is given or to give satisfactory surety as required and called for in the Conditions of the Contract.
c. Bid Guarantees will be returned to those Bidders who request it in writing. Bid Guarantees for the 3 lowest Bidders will be held until after Contracts have been signed; all others will be available 3 days or more after time set for receipt of Bids.
14.0 PERFORMANCE AND PAYMENT BONDS:
a. These bonds will be required as specified in the General and Supplementary General
Conditions. Sample forms are included in the "Sample Contract Forms" part of the Project Manual.
15.0 SUBMISSION OF BIDS:
a. Each Bid shall be submitted in a sealed envelope indicating the Bidder's name, and shall be marked in the lower left-hand corner as follows:
Bid for "Town of Valdese – Draughn Aquatic Center Structure."
Type of Work " Contract."
Bidder's Name " ."
License No. " ."
b. Bids shall not be mailed in prior to Bid Opening.
c. Sealed Bids shall be brought to the place of bidding by the Bidder and shall be handed directly to the Owner or the Architect prior to the opening time. Place of receipt of Bids and Bid Opening date are stated in the Advertisement for Bids.
d. One representative from each company bidding is required to be present.
e. Bids received after the time set for opening of Bids will not be considered.
16.0 WITHDRAWAL OF BID:
a. Negligence or error on the part of the Bidder in preparing the Bid confers no right for withdrawal of the Bid after it has been opened. No Bid may be withdrawn for 30 days after opening time.
IB-6
17.0 REJECTION OF BIDS:
a. Bids may be rejected if they show any unexplained erasures, omissions, alterations of form, additions not called for, added restricting or qualifying conditions or other irregularities of any kind.
b. The Owner reserves the right to reject any and all Bids and/or to waive any and all technical defects in the execution of, and informalities in the submission of any Bid, if he considers it to be in the best interest of the Owner.
18.0 AWARDING OF CONTRACT:
a. In accordance with North Carolina General Statutes 143-129, the award will be made to the lowest responsible Bidder, taking into consideration quality, performance, and time specified in the proposal for the performance of the Contract. The Owner will determine to whom the Contract is to be awarded in the case of a tie low bid.
b. The successful Bidder shall sign a Contract with the Owner like the sample copy bound within this Project Manual.
c. See Paragraph "Bid Evaluation" in these Instructions to Bidders for other information and requirements.
19.0 POST-BID INFORMATION:
a. Submissions:
1. Unless waived by the Architect, the Bidder shall, within 7 days of notification of selection for the award of a Contract for the work, submit the following information to the Architect:
(a) A designation of the work to be performed by the Bidder with own forces.
(b) The proprietary names and the suppliers of principal items or systems of materials and equipment proposed for the work.
(c) A list of names of the subcontractors or other persons or organizations
(including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the work.
(d) The list of subcontractors shall be submitted on AIA Document G805 - List of Subcontractors, copy of which is included under the Contract Forms part of this Project Manual. All information required by the document shall be included.
(e) The Bidder will be required to establish to the satisfaction of the Architect and the Owner the reliability and responsibility of the proposed subcontractors to furnish and perform the work described in the Sections of the Specifications pertaining to such proposed subcontractors' respective trades.
(f) Prior to the award of the Contract, the Architect will notify the Bidder in writing if either the Owner or the Architect, after due investigation, has reasonable and substantial objection to any person or organization on such list. If the Owner or Architect has a reasonable and substantial objection to any person or organization on such list and refuses in writing to accept such person or organization, the Bidder may, choose to (1) withdraw the Bid, or (2) submit an acceptable substitute subcontractor with an increase in the Bid price (if applicable) to cover the difference in cost occasioned by
IB-7
such substitution. The Owner may, accept the increased Bid price or may disqualify the Bidder. In the event of either withdrawal or disqualification under this subparagraph, Bid Security will not be forfeited.
(g) Subcontractors and other persons and organizations proposed by the
Bidder and accepted by the Owner and the Architect must be used on the work for which they were proposed and accepted and shall not be changed except with the written approval of the Owner and the Architect.
(h) Plumbing, HVAC and electrical subcontractors and all other subcontractors required by law shall have current and proper contractor's license for the scope of their work on this Project.
20.0 MAJOR SUBCONTRACTORS:
a. Each Bidder shall state on the blank spaces provided on the Bid Form, the names of the plumbing, HVAC and electrical subcontractors that he will use if awarded the Contract.
21.0 PREBID CONFERENCE:
a. Approximately 2 weeks prior to the receipt of Bids, the Owner will schedule a prebid conference for clarifying any questions which the Bidders and/or their subcontractors may have. The exact time and place will be included in the first addendum.
b. The Architect and Consultants will be present at this meeting, along with the Owner's representative.
c. An Addendum will be issued, if required, to clarify any items brought out relative to the
Contract Documents.
END OF IB
STATE OF NORTH CAROLINA
COUNTY SALES AND USE TAX REPORT
SUMMARY TOTALS AND CERTIFICATION
CONTRACTOR: Page ______ of ______
PROJECT: FOR PERIOD:
TOTAL FOR
COUNTY
OF:
TOTAL FOR
COUNTY OF:
TOTAL FOR
COUNTY OF:
TOTAL FOR
COUNTY OF:
TOTAL FOR
COUNTY OF:
TOTAL FOR
COUNTY OF:
TOTAL
ALL
COUNTIES
CONTRACTOR
SUBCONTRACTOR(S)*
COUNTY TOTAL
* Attach subcontractor(s) report(s)
** Must balance with Detail Sheet(s)
I certify that the above figures do not include any tax paid on supplies, tools and equipment which were used to perform this contract and only includes those building materials, supplies, fixtures and equipment which actually became a part of or annexed to the building or structure. I certify that, to the best of my knowledge, the information provided here is true, correct, and complete.
Sworn to and subscribed before me, This the _______ day of _________________, 20____
Signed
Notary Public
My Commission Expires: Print or Type Name of Above
Seal NOTE:
This certified statement may be subject to audit
STATE OF NORTH CAROLINA
SALES AND USE TAX REPORT DETAIL
CONTRACTOR: Page ______ of ______
SUBCONTRACTOR FOR PERIOD:
PROJECT:
PURCHASE
DATE
VENDOR
NAME
INVOICE
NUMBER
TYPE OF
PROPERTY
INVOICE
TOTAL
COUNTY
TAX PAID
COUNTY
OF SALE *
TOTAL: $
* If this is an out-of-state vendor, the County of Sale should be the county to which the merchandise was shipped.
BF-1
BID FORM
Name of Bidder
Business Address
N.C. License No.
Telephone Number
Email Address
PROJECT: Town of Valdese – Draughn Aquatic Center Structure
TO: _______________________________________________________
Gentlemen:
The undersigned, having carefully examined the Bidding Documents, Drawings and Specifications, and all subsequent Addenda as prepared by Walter Robbs Architects, a Michael Graves Company, has visited the site and being familiar with all conditions and requirements of the work, hereby agrees to furnish all labor, materials, equipment, services, and other requirements to complete the following construction:
All to be in accordance with the bidding documents for the following amounts:
BASE BID: Dollars ($ )
Base Bid does not include state or local sales tax; see Paragraph "Taxes" of Instructions To Bidders. Base Bid does include all Cash Allowances and Quantity Allowances described in Section 01200. Base Bid does NOT include Bid Alternates described in Section 01200.
BID ALTERNATES:
The undersigned agrees to perform all alternate work as described in Section 01200 of the Specifications for the following sums. He further agrees to perform said work without change to the required time of completion of the Project.
Enter price for Bid Alternates involving work included under the Contract bid upon on Page 1 of this Bid Form.
Alternate #1: Dollars ($ )
Alternate #2: Dollars ($ )
Alternate #3: Dollars ($ )
Alternate #4: Dollars ($ )
BF-2
UNIT PRICES:
Should the undersigned be required to perform work over and above that required by the Contract Documents, or should he be ordered to omit work required by the Contract Documents, he will be paid an extra or shall credit the Owner, as the case may be, on the basis of unit prices stated herein, prices quoted being sum total compensation payable or creditable for such items installed and in place, including overhead and profit, general conditions and duration related expenses and all other expenses associated with the work.
Work Unit Price
Excavation and off-site removal of unsuitable soil and replacement of off-site backfill (57 stone) compacted. Cu. Yd. $
LINE ITEM:
Work Price
Cost of Field Verification during Mandatory Site Visit (included in Base Bid). $_____________
Addenda have been received as follows:
Addendum No. Date
The undersigned further agrees to sign a Contract for all work in the above amounts, if offered within thirty
(30) days after receipt of Bids, and to furnish surety as specified, and upon failure to do so, agrees to forfeit to the Owner, attached cashier's check, certified check or Bid Bond in the amount of:
$ of Base Bid).
The undersigned further agrees to begin work promptly after a Notice to Proceed with an adequate force, carry the work forward as rapidly as possible and complete the entire Project no later than ____________ consecutive calendar days after the date to begin as specified in the Notice to Proceed.
BF-3
The undersigned hereby states that he will use the following major subcontractors if awarded the Contract:
Plumbing:
HVAC:
Electrical:
The undersigned agrees that he has executed and submitted with his bid the Statement of Bidder's Qualification which is attached as the last page of this Bid Form.
It is distinctly understood that the Owner reserves the right to reject any and all Bids and to waive informalities and technicalities if considered to be in the best interest of the Owner.
Bidder hereby verifies that he is properly licensed in accordance with North Carolina state laws governing his respective trade and has entered his NC license number on the first page of this Bid Form.
Name of Bidder
By Signature
Title
Date Proposal Executed: , 202___ .
Note: Execute and include "Statement of Bidder's Qualifications" as the last page of this Bid Form.
BF-4
STATEMENT OF BIDDER'S QUALIFICATIONS
1. When was firm organized?
2. When and where was firm incorporated?
3. How many years has firm been engaged in contracting business under its present firm name?
4. Undersigned ( ) is willing ( ) is not willing to furnish a recent Financial Statement if requested to do so by Owner. (Note failure to provide financial information could result in disqualification.)
5. Three projects completed within last five (5) years approximating this project in size and scope.
Owner Type Building: Approx. Cost: Architect
A.
B.
C.
6. Have you ever refused a contract at your original bid?
7. Have you ever defaulted on a contract?
If answer to either 6 or 7 above is yes, explain circumstances on attached sheet.
(This statement must be subscribed and sworn to before a Notary Public.)
Sworn to and subscribed Firm Name:
before me this ____ day By:
of ______________, 202___ Title:
Notary Public
Document A310™ – 2010 Bid Bond
Init.
AIA Document A310™ – 2010 (rev. 10/2010). Copyright © 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved.
WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects’ legal counsel, copyright@aia.org. ACD43070810
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR:
(Name, legal status and address)
SURETY:
(Name, legal status and principal place of business)
OWNER:
(Name, legal status and address)
BOND AMOUNT:
PROJECT:
(Name, location or address, and Project number, if any)
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety’s consent for an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor’s bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this day of
(Contractor as Principal) (Seal) (Witness) (Title)
(Surety) (Seal) (Witness) (Title)
CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured.
PFB-1
FORM OF PERFORMANCE BOND
Date of Contract:
Date of Execution:
Name of Principal:
(Contractor)
Name of Surety:
Name of Contracting Body:
Amount of Bond:
Project: Town of Valdese – Draughn Aquatic Center Structure
KNOW ALL MEN BY THESE PRESENTS, that we, the PRINCIPAL and SURETY above named, are held and firmly bound unto the above named Contracting Body, hereinafter called the Contracting Body, in the penal sum of the amount stated above for the payment of which sum well and truly to be made, we bind, ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principal entered into a certain contract with the Contracting Body, identified as shown above and hereto attached:
NOW THEREFORE, if the principal shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term of said contract and any extensions thereof that may be granted by the Contracting Body, with or without notice to the Surety, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to the surety being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue.
IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under their several seals on the date indicated above, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
PFB-2
Executed in counterparts.
Witness:
Contractor: (Trade or Corporate Name)
By:
(Proprietorship or Partnership)
Attest: (Corporation) Title:
(Owner, Partner, or Corp. Pres.
or Vice Pres. only)
By:
Title:
(Corp. Sec. or Ass't. Sec. only)
(Corporate Seal)
(Surety Company)
Witness: By:
Title:
(Attorney in Fact) Countersigned:
(Surety Corporate Seal) (N. C. Licensed Resident Agent)
Name and Address - Surety Agency
Surety Company Name and N. C.
Regional or Branch Office Address
PYB-1
FORM OF PAYMENT BOND
Date of Contract:
Date of Execution:
Name of Principal:
Name of Surety:
Name of Contracting Body:
Amount of Bond:
Project: Town of Valdese – Draughn Aquatic Center Structure
KNOW ALL MEN BY THESE PRESENTS, that we, the PRINCIPAL and SURETY above named, are held and firmly bound unto the above named contracting body, hereinafter called the contracting body, in the penal sum of the amount stated above for the payment of which sum well and truly to be made, we bind, ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principal entered into a certain contract with the contracting body, identified as shown above and hereto attached:
NOW THEREFORE, if the principal shall promptly make payment to all persons supplying labor/material in the prosecution of the work provided for in said contract, and any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to the surety being hereby waived, then this obligation to be void; otherwise to remain in full force and virtue.
IN WITNESS WHEREOF, the above-bounded parties have executed this instrument under their several seals on the date indicated above, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representatives, pursuant to authority of its governing body.
PYB-2
Executed in counterparts.
Witness:
Contractor: (Trade or Corporate Name)
By:
(Proprietorship or Partnership)
Attest: (Corporation) Title:
(Owner, Partner, or Corp.
Pres. or Vice Pres. only)
By:
Title:
(Corp. Sec. or Ass't. Sec. only)
(Corporate Seal)
(Surety Company)
Witness: By:
Title:
(Attorney in Fact)
Countersigned:
(Surety Corporate Seal) (N. C. Licensed Resident Agent)
Name and Address - Surety Agency
Surety Company Name and N. C.
Regional or Branch Office Address
GG-1
GENERAL GUARANTEE
guarantees all materials and workmanship incorporated (Name of Contractor) in the Town of Valdese – Draughn Aquatic Center Structure, Massell Ave SW, Valdese, NC 28690, against defect due to faulty materials or faulty workmanship or negligence for a period of 12 months from completion of the Project for the General Guarantee and for such longer periods as may be designated by specific Sections of the Project Manual or by manufacturer's warranty on equipment, parts or materials.
This Guarantee is binding where defects occur due to normal usage conditions and does not cover willful or malicious damage, damage caused by acts of God or other casualty.
Sworn to and subscribed before me this day of , 202 .
By
Title
(Notary Public)
My Commission expires .
RW-1
ROOFING WARRANTY
Know all men by these presents, that we, ____________________________(Contractor), having installed insulation, roofing, flashing, and sheet metal work, and having accomplished certain other work on Town of Valdese – Draughn Aquatic Center Structure, under a Contract between
_______________(Owner) and (Contractor), warrant to the Owner with respect to said work that for a period of 2 years from date of final acceptance of said work by the Owner, the roofing system including insulation, roofing membrane, flashings and sheet metal work related to roofing system shall be absolutely watertight and free from all leaks provided, however, that the following are excluded from this warranty:
1. Defects or failures resulting from abuse by the Owner.
2. Defects in design involving failure of (a) structural frame, (b) loadbearing walls, (c) foundations.
3. Damage caused by fire, tornado, hail, hurricane, acts of God, wars, riots, or civil commotion.
We, ___________________________(Contractor), agree that should any leaks occur in the roofing system, we will promptly remedy said leaks in a manner to restore the roofing system to a watertight condition by methods compatible to the system and acceptable under industry standards and general practice.
We, ___________________________(Contractor), further agree that for a period of 2 years from date of final acceptance referred to above we will make repairs, at no expense to the Owner, to any defects which may develop in the work, in a manner compatible to the system and acceptable under industry standards and general practice. Damage to the interior of the building resulting from failure of the roofing system described herein shall be repaired and/or replaced by the Contractor at no expense to the Owner.
IN WITNESS WHEREOF, we have caused this instrument to be duly executed, this day of , 202___.
WITNESS: By:
President
(Notary Public)
ASBESTOS FREE WARRANTY
Owner: Town of Valdese
Location of Building: Massel Ave SE, Valdese, NC 28690
Name of Building: Draughn Aquatic Center Structure
Date of Substantial Completion:
Know all men by these presents that we, (Contractor, Subcontractor, Material Supplier, Equipment Manufacturer) having furnished labor, materials, equipment and/or supplies; from, to and/or on as shown on the plans and specifications (Buildings, etc.)
below under contract between and (Owner) and (Contractor, Subcontractor, Material Supplier, Equipment Manufacturer) dated :
warrant to Owner with respect to said work that no materials containing asbestos fibers were incorporated into the work, and that, to our knowledge and belief, no materials containing asbestos remain in or are covered by the work.
Exceptions:
(If there are no exceptions, state “No Exceptions” here)
IN WITNESS WHEREOF, we have caused this instrument to be duly executed, this the day of , 20____.
SWORN to and subscribed before me, On this the day of , 20_____.
Company Notary Public
By: My Commission Expires:
Title:
Document A201™ – 2017 General Conditions of the Contract for Construction
Init.
AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects’ legal counsel, copyright@aia.org.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
For guidance in modifying this document to include supplementary conditions, see AIA Document A503™, Guide for Supplementary Conditions.
for the following PROJECT:
(Name and location or address)
THE OWNER:
(Name, legal status and address)
THE ARCHITECT:
(Name, legal status and address)
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 OWNER
3 CONTRACTOR
4 ARCHITECT
5 SUBCONTRACTORS
6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7 CHANGES IN THE WORK
8 TIME
9 PAYMENTS AND COMPLETION
10 PROTECTION OF PERSONS AND PROPERTY
11 INSURANCE AND BONDS
12 UNCOVERING AND CORRECTION OF WORK
13 MISCELLANEOUS PROVISIONS
14 TERMINATION OR SUSPENSION OF THE CONTRACT
15 CLAIMS AND DISPUTES
Init.
AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects’ legal counsel, copyright@aia.org.
INDEX
(Topics and numbers in bold are Section headings.)
Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.3.2, 14.1, 15.1.2, 15.2 Addenda 1.1.1 Additional Costs, Claims for 3.7.4, 3.7.5, 10.3.2, 15.1.5 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.6 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13 Allowances 3.8 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.5.4, 9.6.3, 9.7, 9.10 Approvals 2.1.1, 2.3.1, 2.5, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10.1, 4.2.7, 9.3.2, 13.4.1 Arbitration 8.3.1, 15.3.2, 15.4
ARCHITECT
Architect, Definition of 4.1.1 Architect, Extent of Authority 2.5, 3.12.7, 4.1.2, 4.2, 5.2, 6.3, 7.1.2, 7.3.4, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.4.1, 13.4.2, 14.2.2, 14.2.4, 15.1.4, 15.2.1 Architect, Limitations of Authority and Responsibility 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4, 9.4.2, 9.5.4, 9.6.4, 15.1.4, 15.2 Architect’s Additional Services and Expenses 2.5, 12.2.1, 13.4.2, 13.4.3, 14.2.4 Architect’s Administration of the Contract 3.1.3, 3.7.4, 15.2, 9.4.1, 9.5 Architect’s Approvals 2.5, 3.1.3, 3.5, 3.10.2, 4.2.7 Architect’s Authority to Reject Work 3.5, 4.2.6, 12.1.2, 12.2.1
Architect’s Copyright 1.1.7, 1.5 Architect’s Decisions 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.4.2, 15.2 Architect’s Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.4 Architect’s Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.4.2 Architect’s Interpretations 4.2.11, 4.2.12 Architect’s Project Representative 4.2.10 Architect’s Relationship with Contractor 1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.3.2, 13.4, 15.2 Architect’s Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3 Architect’s Representations 9.4.2, 9.5.1, 9.10.1 Architect’s Site Visits 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4 Asbestos 10.3.1 Attorneys’ Fees 3.18.1, 9.6.8, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1 Binding Dispute Resolution 8.3.1, 9.7, 11.5, 13.1, 15.1.2, 15.1.3, 15.2.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.3.3, 15.4.1 Bonds, Lien 7.3.4.4, 9.6.8, 9.10.2, 9.10.3 Bonds, Performance, and Payment 7.3.4.4, 9.6.7, 9.10.3, 11.1.2, 11.1.3, 11.5 Building Information Models Use and Reliance 1.8 Building Permit 3.7.1 Capitalization 1.3 Certificate of Substantial Completion 9.8.3, 9.8.4, 9.8.5 Certificates for Payment 4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.4 Certificates of Inspection, Testing or Approval 13.4.4
AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects’ legal counsel, copyright@aia.org.
Certificates of Insurance 9.10.2 Change Orders 1.1.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.7, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.2, 11.5, 12.1.2 Change Orders, Definition of 7.2.1
CHANGES IN THE WORK
2.2.2, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 8.3.1, 9.3.1.1, 11.5 Claims, Definition of 15.1.1 Claims, Notice of 1.6.2, 15.1.3
CLAIMS AND DISPUTES
3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims 15.4.1 Claims for Additional Cost 3.2.4, 3.3.1, 3.7.4, 7.3.9, 9.5.2, 10.2.5, 10.3.2, 15.1.5 Claims for Additional Time 3.2.4, 3.3.1, 3.7.4, 6.1.1, 8.3.2, 9.5.2, 10.3.2, 15.1.6 Concealed or Unknown Conditions, Claims for 3.7.4 Claims for Damages 3.2.4, 3.18, 8.3.3, 9.5.1, 9.6.7, 10.2.5, 10.3.3, 11.3, 11.3.2, 14.2.4, 15.1.7 Claims Subject to Arbitration 15.4.1 Cleaning Up 3.15, 6.3 Commencement of the Work, Conditions Relating to 2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.2, 15.1.5 Commencement of the Work, Definition of 8.1.2 Communications 3.9.1, 4.2.4 Completion, Conditions Relating to 3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 14.1.2, 15.1.2
COMPLETION, PAYMENTS AND
Completion, Substantial 3.10.1, 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 15.1.2 Compliance with Laws 2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3 Concealed or Unknown Conditions 3.7.4, 4.2.8, 8.3.1, 10.3 Conditions of the Contract 1.1.1, 6.1.1, 6.1.4 Consent, Written 3.4.2, 3.14.2, 4.1.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 13.2, 15.4.4.2
Consolidation or Joinder 15.4.4
CONSTRUCTION BY OWNER OR BY
SEPARATE CONTRACTORS
1.1.4, 6 Construction Change Directive, Definition of 7.3.1 Construction Change Directives 1.1.1, 3.4.2, 3.11, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1 Construction Schedules, Contractor’s 3.10, 3.11, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2 Contingent Assignment of Subcontracts 5.4, 14.2.2.2 Continuing Contract Performance 15.1.4 Contract, Definition of 1.1.2
CONTRACT, TERMINATION OR SUSPENSION
OF THE
5.4.1.1, 5.4.2, 11.5, 14 Contract Administration 3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to 3.7.1, 3.10, 5.2, 6.1 Contract Documents, Copies Furnished and Use of 1.5.2, 2.3.6, 5.3 Contract Documents, Definition of 1.1.1 Contract Sum 2.2.2, 2.2.4, 3.7.4, 3.7.5, 3.8, 3.10.2, 5.2.3, 7.3, 7.4, 9.1, 9.2, 9.4.2, 9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.5, 12.1.2, 12.3, 14.2.4, 14.3.2, 15.1.4.2, 15.1.5, 15.2.5 Contract Sum, Definition of 9.1 Contract Time 1.1.4, 2.2.1, 2.2.2, 3.7.4, 3.7.5, 3.10.2, 5.2.3, 6.1.5, 7.2.1.3, 7.3.1, 7.3.5, 7.3.6, 7, 7, 7.3.10, 7.4, 8.1.1, 8.2.1, 8.2.3, 8.3.1, 9.5.1, 9.7, 10.3.2, 12.1.1, 12.1.2, 14.3.2, 15.1.4.2, 15.1.6.1, 15.2.5 Contract Time, Definition of 8.1.1
CONTRACTOR
Contractor, Definition of 3.1, 6.1.2 Contractor’s…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .