Project Statement 19158.pdf
PDF 101 KB Posted
- Solicitation number
- RFP 171 190000003008 2
- Issued by
- Huron County, Michigan
About this file
This Project Statement is issued by the State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division, in coordination with the Michigan Department of Natural Resources (DNR) and the Michigan Department of Environment, Great Lakes and Energy (EGLE). The state seeks a Professional Services Contractor (PSC) to provide complete Phase 100 Professional Architectural and Engineering Services for a sewage disposal system study at Bewabic State Park in Crystal Falls, Michigan. The project addresses aging sewage infrastructure at the park's two toilet/shower buildings, sanitation station, and associated drain fields constructed in 1974 and 2002, which have experienced system backups and defects. The PSC shall evaluate existing conditions, investigate replacement options including separate systems or combined on-site sewage disposal facilities, assess impacts to park lands including potential wetland impacts and soil suitability, coordinate with EGLE regarding wastewater disposal requirements, and provide cost estimates at 50%, 90%, and 100% completion. The proposal due date is September 19, 2019, with a mandatory pre-bid meeting scheduled for September 5, 2019 at 10:00 CST at Bewabic State Park Headquarters Building. The contract award is anticipated for early October 2019, with Phase 100 completion required prior to June 30, 2020. RFP questions will be accepted until September 10, 2019 at 5:00 p.m. EST.
The PSC shall provide all professional services in accordance with DTMB Billable Rate Professional Services Contract standards and procedures, with travel reimbursements and billing rates consistent with the contractor's current ISID contract. The project includes defined testing and allowance budgets totaling $22,000, comprising EGLE permitting ($1,000), Phase I Archaeological Survey ($10,000), Soil Sampling and Soils Analysis ($6,000), and an additional $5,000 Owner's Directed Allowance for testing as identified by the PSC. All travel expenses, reproduction, shipping, and other reimbursables must be identified and itemized in the cost proposal. The PSC shall provide project management, maintain a detailed schedule with critical path identification, coordinate required review meetings with DNR, DTMB, SHPO, and EGLE, prepare meeting minutes, and follow DTMB naming conventions and documentation standards. The project is filed under account template 5503 with NIGP codes 90680, 92517, 92583, and 92587. Proposals must be uploaded to SIGMA VSS, with electronic submissions limited to individual files not exceeding 6 megabytes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 4/19)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division
3111 West St. Joseph Street
Lansing, Michigan 48909
FILE NUMBER
751/19158.RAA
ACCOUNTING TEMPLATE
PROPOSAL DUE DATE
September 19, 2019
CLIENT AGENCY
Natural Resources
PROJECT NAME AND LOCATION
Bewabic State Park – New Sewage Disposal System Study PROJECT ADDRESS (if applicable) U. S. Highway 2, Crystal Falls, MI
CLIENT AGENCY CONTACT
Eric Cadeau cadeau@michigan.gov
Joe Freiberg freibergj2@michigan.gov
TELEPHONE NUMBER
906.241.8318
906.875.3324
DTMB - DCD PROJECT DIRECTOR
Robert A. Adams adamsb1@michigan.gov
John C. Patrick patrickj1@michigan.gov
Jeff Barsch barschj@michigan.gov
TELEPHONE NUMBER
517.242.1088
517.242.0286
906.251.0727
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
MANDATORY Pre-Bid Meeting 11:00 EST / 10:00 CST on Thursday, September 5, 2019 at Bewabic State Park Headquarters
Building
MANDATORY (Check box if Mandatory)
PROJECT DESCRIPTION/SERVICES REQUESTED
The Professional Services Contractor (PSC) shall provide complete Phase 100 Professional Architectural and Engineering
Services to provide a Phase 100 study.
Provide a complete PSC proposal for all required professional architectural and engineering services in accordance with the State of Michigan. Department of Technology, Management and Budget (DTMB) Project Statement form (DTMB 0427), DTMB Billable
Rate Professional Services Contract and the DTMB Request for Proposal (DTMB 0430) and the DTMB State Facilities
Administration (SFA) Design and Construction (DCD) policies and procedures for the development of a Phase 100 study.
The parks modern campground is served by two (2) standalone toilet / shower buildings. Each building and associated drain field was constructed around year 1974. The park has experienced sewage system backups and defects in recent years. This project is intended to study the potential replacement of an on-site sewage for each building and / or a combined sewage disposal facility.
Additionally, the sanitation system drain field, built in 2002, has also experienced backups possibly due to saturation. The study shall investigate the existing systems performance and review the existing conditions to assure compliance with all current public health departments. The PSC is asked to assist the Department of Natural Resources (DNR) with planning for sewage disposal system(s) replacement by investigating future sewage disposal options. These options could include separate systems or combined on-site sewage disposal system that supports the toilet / shower buildings and the sanitation station.
The Phase 100 study shall include consultation with the Michigan Department of Environment, Great Lakes and Energy (EGLE) regarding wastewater disposal requirements. EGLE wastewater disposal recommendations may require pretreatment based on the concentration of effluent from the sanitation station. The study will perform a Phase 100 study evaluation of options of replacing the existing drain fields with drain fields, a lagoon, or with some other PSC recommended (or as guided by EGLE) on-site sewage disposal system.
“The Phase 100 Study shall develop a basis of design for wastewater flows and determines the scale of development necessary to consider each option. The Study will evaluate the potential impacts to park lands such as potential wetland impacts, soils suitability for sewage disposal, and any required archaeological survey efforts.
mailto:cadeau@michigan.gov mailto:freibergj2@michigan.gov mailto:adamsb1@michigan.gov mailto:patrickj1@michigan.gov mailto:barschj@michigan.gov
The study will consider the compatibility of the proposed on-site sewage disposal system options with a planning concept that proposes to replace the two (2) existing toilet / shower buildings with one (1) new toilet / shower building locate din a central location (see attached concept map). The study will discuss the necessary infrastructure transitions necessary to be compatible to such a proposal.
Additionally, the study should evaluate the drain fields associated with the park’s headquarters building, and contact station / beach house and determine if replacement is necessary and if so, how replacement should occur (standalone system or combined).
The study shall consider permitting, licensing and life cycle maintenance costs of each system. The study shall initiate all necessary permitting discussions to inform the considered options.
PSC services shall also include, but not be limited to:
1. The PSC shall be responsible for gathering and verifying accurate base information, preparing preliminary and final cost estimates, preparing all necessary pre-application permitting documents and obtaining review and guidance of the Phase
100 Study documents by the required governing agencies. Review and consultation of the study by DNR, DTMB, SHPO and EGLE is anticipated to be required.
2. Prepare cost estimates for Phase 100 options at 50%, 90% and 100% complete submittals.
3. Coordinate and facilitate the required DNR and DTMB review meetings of Phase 100. An onsite project kickoff meeting after project award is required. Additionally, formal review meetings are required of Phase 100 deliverables at 50% and
90% complete. The 100% complete submittal is not intended to have a formal review meeting only informal review and acceptance. The 50% and 90% complete review meetings are proposed to be a GoToMeeting style electronic format.
4. Coordination of any utility infrastructure impacts.
5. The PSC shall provide active project management and maintain their proposed schedule of tasks and milestones including, but not limited to, critical project tasks such as consultation, and other data collection tasks. The PSC’s schedule shall not only itemize and identify the critical project tasks, path and correlation, but the PSC shall be proactive in identifying and implementing remedial actions necessary to get back on schedule if schedule slippage is encountered.
Agency review task durations of five (5) workdays on the PSC’s schedule should not be considered to be flexible for gaining back time should schedule slippage occur.
The PSC proposal shall further specifically include:
1. All testing required for project completion shall be identified and included in the PSC Technical Proposal and the cost itemized in the PSC Cost Proposal as reimbursements.
2. All travel expenses, reproduction, shipping and all other reimbursables identified and itemized in the PSC Cost Proposal.
The PSC shall include in their proposal as reimbursable costs the following Testing and Owner’s Cash Allowance:
1. EGLE permitting - $1,000.00
2. Phase I – Archaeological Survey - $10,000
3. Soil Sampling and Soils Analysis - $6,000
4. PSC to identify any additional required testing to complete Phase 100 and itemize under a $5,000 Owners Directed
Allowance for testing.
PSC to provide schedule with the RFP response assuming Phase 100 completion prior to June 30, 2020.
Additional Requirements:
1. Travel reimbursements and billing rates shall be in accordance with the PSC’s current ISID contract
2. Timely minutes from all meetings will be required as per the PSC contract.
3. PSC to follow DTMB naming convention of DTMB file number / Project Name / Y Number and subject on all project documents
4. PSC shall provide enough backup on all invoices for reimbursable expenses
5. The final bidding schedule will require a minimum two – week advertisement period before the pre-bid addendums a minimum of one-week before the due date.
Reference Documents in PDF format that will be included with the Project Statement posting:
1. DTMB -0430 Minor State Capitol Outlay Projects Billable Rate Request for Proposals from Professional Service
Contractors
2. 751/02142.HRB – Replacement of Sewage Disposal System 06/18/02
3. A-102 Toilet / Shower Buildings
4. E-101 Campground Development
5. L-98 (Topo Index), L-99 (Topo Map)
The extent of the Owner’s As-Built records located onsite, for future access to and reference by the selected PSC, will be able to be evaluated at the Walkthrough Inspection. The As-Built records may be incomplete and, to some extent, inaccurate. The As-
Built records are required to be verified by the PSC to the extent required to insure an accurate and complete design.
Please NOTE:
• Proposal responses MUST also be uploaded to SIGMA VSS. Please enter the total cost for all phases as bid amount.
• Please remember that individual attachments can be no larger than 6mb.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help
Desk for assistance. They can be reached by telephone at 888.734.9749 or by email at sigma-procurement-helpdesk@michigan.gov or sigma-vendor@michigan.gov
•• Vendors are reminded to keep our office apprised of SIGMA VSS issues and to include your SIGMA ticket number when communicating with our office. Emailed submissions will need prior DCD approval and will be handled on a case by case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered.
NIGP CODES
90680; 92517; 92583 and 92587
DESIRED SCHEDULE OF WORK
The PSC shall provide a schedule in their proposal. PSC is to assume a PSC contract award date of early October 2019.
ACCEPTING RFP QUESTIONS UNTIL: September 10, 2019 at 5:00 p.m. EST / 4:00 p.m. CST
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)
Attachment(s) mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-vendor@michigan.gov
File details come from the government source that posted it. Updated .