Addendum No. 1 - On Site Sewage System Study.pdf
PDF 3 MB Posted
- Solicitation number
- RFP 171 190000003008 2
- Issued by
- Huron County, Michigan
About this file
This is an Addendum No. 1 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Bewabic State Park New Sewage Disposal System Study. The addendum, issued on September 9, 2019, with a proposal due date of September 19, 2019, modifies the original RFP scope and requirements. Key modifications include a mandatory PSC (Professional Services Contractor) walkthrough with an attached attendee list, incorporation of a 45-day archeological exploration permit application process into the proposed schedule, and revision of the Phase 100 completion date to November 30, 2020. Additional scope changes include elimination of Contact Station and Beach House drain field evaluation, addition of converting campsites 119-128 (10 total campsites) to full hookup sites in the basis of design, and inclusion of a concept to demolish two existing toilet shower buildings and construct one new facility to accommodate 130 campsites in compliance with DEQ campground rules.
The addendum specifies technical requirements for effluent concentration testing under a $5,000 Owner's Directed allowance, with itemized costs to be included in proposals. Testing shall occur within the existing system and at the discharge point, including analysis of BOD levels, phosphorus, ammonia, and formaldehyde across a minimum of four sample sets (four peak and two non-peak) scheduled following the Memorial Day and Fourth of July holidays. Travel reimbursements and billing rates must comply with the attached DTMB-430 Minor State Capital Outlay Projects Billable Rate Request for Proposals from Professional Service Contractors. A concept map of the combined toilet shower building development is attached, along with applicable DEQ Public Act governing campgrounds regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 6/16)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL ADDENDUM NO. Enter No.
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
9/9/2019
PROJECT NAME
Bewabic S.P. New Sewage Disposal System Study
FILE NUMBER
751/19158.RAA
PROJECT DIRECTOR
Jeff Barsch
PROPOSAL DUE DATE:
9/19/2019
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Item 1-Mandatory PSC Walkthrough attendance list is attached.
Item 2-proposed PSC Schedules for implementation of the study shall take into account the 45 day archeological exploration permit application process.
Item 3-The Phase 100 Completion Date has been revised and shall now be November 30, 2020. Proposed Schedules included with proposals shall reflect this new completion date.
Item 4-Include an itemized cost for effluent concentration testing under the Owners Directed $5,000 allowance. This testing shall take place within the existing system and at the last point prior to discharge as recommended by the PSC. Sampling shall include but may not be limited to:
BOD levels, phosphorus, ammonia, and formaldehyde. Anticipate a minimum of 4 sample sets (4 peak and 2 non-peak), the proposed schedule shall reflect this testing to occur following the Memorial Day & Forth of July Holidays.
Item 5-Evaluation of the Contact Station/Beach House drain fields shall be eliminated from the scope of work for this study.
Item 6-Inclusion of converting campsites 119-128 (10 total) to full hookup sites shall be added to the on-site sewage disposal basis of design for this study.
Item 7-On the project statement under additional requirements revise item 1 to state: Travel reimbursements and billing rates shall be in accordance with the attached DTMB-430 Minor State Capital Outlay Projects Billable Rate Request for Proposals from Professional Service Contractors.
Item 8 – Concept map of combining 2 toilet shower buildings into one is now attached.
Item 9 -DEQ Public Act Governing Campgrounds are attached.
APPROVED BY:
DATE: 9/9/2019
http://www.michigan.gov/SIGMAVSS cadeaue Polygon cadeaue Callout Potential development concept (Demolish two existing toilet shower buildings (shown in black) construct one new toilet shower building with sufficient fixtures to meet DEQ campground rules for 130 campsites.
cadeaue Callout Potential development concept (Demolish two existing toilet shower buildings) cadeaue Line