Project Statement 17301.pdf

PDF 76 KB Posted

Attached to
751/17301. BDW Presque Isle - Fuel Tank Replace
Solicitation number
RFP-171-180000002691-3
Issued by
Presque Isle County, Michigan

About this file

This is a Project Statement from the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration for the Natural Resources - Parks & Recreation Division. The project involves professional design services for replacing two underground fuel storage tanks at the Presque Isle Harbor of Refuge, located at 5462 E Grand Lake Road, Presque Isle, MI. The scope includes reviewing the existing delivery and dispensing system for potential upgrades, providing recommendations for tank relocation, and switching tank sizes between a 10,000-gallon diesel tank and a 15,000-gallon gasoline tank to better meet demand. A mandatory walk-through inspection is scheduled for May 25, 2018, at 10:00 am at the MDNR Gaylord Customer Service Center. Proposals are due June 7, 2018, at 2:00 pm EST, with RFP questions accepted until May 30, 2018, at 5:00 pm.

The project timeline indicates design work through July 2018 with construction planned for Fall 2018. The project must comply with all federal (EPA, OSHA, DOT), state (DCH, DEQ, DNR, MIOSHA), and local regulations and standards. Reference materials provided include the DNR Project Statement and various construction drawings from 1990-2005, including fuel system upgrades and ice suppression installation documents. The project is identified under NIGP codes 90629, 90638, 92533, and 92576.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-427 (R 10/17)

PROJECT STATEMENT

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design and Construction Division

P.O. Box 30026

Lansing, Michigan 48909

FILE NUMBER

751/17301.BDW

INDEX NUMBER(S) PROPOSAL DUE DATE

June 7, 2018, 2:00 pm EST

CLIENT AGENCY

Natural Resources - Parks & Recreation Division

PROJECT NAME AND LOCATION

Fuel System Fuel Tank Replacement - Presque Isle Harbor of Refuge PROJECT ADDRESS (if applicable)

5462 E Grand Lake Road, Presque Isle, MI 49777

CLIENT AGENCY CONTACT

Keith Cheli

TELEPHONE NUMBER

231-627-9578

DTMB - DCD PROJECT DIRECTOR

Bruce Watkins

TELEPHONE NUMBER

517-242-7882

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:

Friday, May 25, 2018, 10:00am @ MDNR - GAYLORD CUSTOMER SERVICE CENTER

Gaylord Customer Service Center, 1732 West M-32, Gaylord, MI 49735, 989-732-3541

MANDATORY (Check box if Mandatory)

PROJECT DESCRIPTION/SERVICES REQUESTED

Presque Isle Harbor - Provide professional design services for the replacement of two underground fuel storage tanks. Also, provide review of existing delivery and dispening system for potential upgrades and provide recommendations to the Owner.

Also, provide recommendations for potential relocation of the tanks. Additionally, the current configuration is a 10,000 gallon diesel tank and a 15,000 gallon gasoline tank, these tank sizes should be switched, as diesel fuel is in greater quantity demand.

Professional should include review of records of use. The DNR project statement is attached for reference and greater detail.

Additionally, original construction drawings and fuel system upgrad drawings are provided for reference.

NIGP CODES

90629, 90638, 92533, 92576, DESIRED SCHEDULE OF WORK

Design through July, 2018, for Fall 2018 Construction

ACCEPTING RFP QUESTIONS UNTIL: May 30, 2018, 5:00pm

REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.

This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)

Attachment(s)

DNR Project Statement

Drawings:

Fuel System Upgrades - 1997

Ice Suppression Installation - 1997 & 1998

Phase I Construction Drawings - 1990

Phase II Construction Drawings - 2005

File details come from the government source that posted it. Updated .