PresqueIslePhaseI_1990_Part2.pdf

PDF 4 MB Posted

Attached to
751/17301. BDW Presque Isle - Fuel Tank Replace
Solicitation number
RFP-171-180000002691-3
Issued by
Presque Isle County, Michigan

About this file

This document contains detailed engineering drawings and specifications for a breakwater construction project, appearing to be from a bid package or construction plans. The drawings show cross-sectional views and plan views of both South and Northeast breakwater sections, with detailed station sections spaced at regular intervals along the structures.

The technical drawings provide comprehensive construction details including stone placement specifications, armor stone requirements (2-ton and 3-ton sizes), underlayment requirements, and precise grading tolerances. The plans include multiple section views labeled A-A, B-B, and C-C showing the internal structure of the breakwater, with dimensions, elevations, and slope ratios clearly marked. A circulation pipe section detail is also included, showing bedding layer specifications and pipe placement requirements. The drawings use standard engineering scales (1 in. = 5 ft. and 1 in. = 10 ft.) and include both marina side and lake side elevations throughout the structure's length.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

71 Presque Isle

005692
005693
005694
005695

File details come from the government source that posted it. Updated .