Project Statement 17289.doc
DOC document 115 KB Posted
- Attached to
- Clinton River Cut Off - BAS Study
- Solicitation number
- RFP 171 180000000140 1
- Issued by
- Macomb County, Michigan
About this file
This is a Project Statement for a professional services contract between the State of Michigan Department of Technology, Management and Budget (DTMB) in partnership with the Department of Natural Resources (DNR). The Clinton River Cut-Off Boat Access Site (BAS) Study seeks proposals for phases 100-300 to investigate heavy sedimentation accumulation and ramp blocking at an existing active boat launch facility located at 36110 Jefferson Ave, Harrison Township, Michigan. The scope of work includes studying causes of sedimentation, developing solutions to mitigate accumulation, exploring relocation of boat access to a neighboring inactive launch area utilizing existing parking infrastructure, evaluating breakwall solutions with consideration of impacts on adjacent properties, and delivering conceptual layouts with cost estimates for all proposed solutions. A mandatory walk-through inspection is scheduled for October 17th at 1:30 PM at the project site. Proposals are due November 9th, 2017 at 2:00 PM EST. The consultant must complete all deliverables within 150 calendar days and conduct a minimum of five meetings, with two meetings potentially held virtually. All questions regarding the project must be submitted by the walk-through date.
The contract will comply with applicable federal regulations administered by the EPA, OSHA, and DOT, as well as state regulations from DCH, DEQ, DNR, and MIOSHA. The project is categorized under NIGP codes 90607, 90629, 90642, 90656, and 92548, indicating professional engineering and design services. No specific pricing terms, set-asides, incumbent information, or funding amounts are provided in this project statement document. The deliverables include depth soundings analysis and aerial survey documentation as supporting attachments to the final report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17289 CRCO_transect_1.png | PNG image | |
| Specification 17289.doc | DOC document | |
| 17289 Clinton River Sed Transport.pdf | ||
| 17289 CRCO_transect_2.png | PNG image | |
| 17289 CRCO_transect_2.csv | CSV file | |
| 17289 CRCO_transect_1.csv | CSV file | |
| 17289 CRCO_transect_3.png | PNG image | |
| 17289 Dredge area cross section map.docx | DOCX document | |
| 17289 CRCO_transect_3.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-427 (R 6/16)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division P.O. Box 30026
Lansing, Michigan 48909
FILE NUMBER
751_17289.MNB
INDEX NUMBER(S)
59010
PROPOSAL DUE DATE
November 9th , 2017 at 2:00 pm EST
CLIENT AGENCY
Dept. Of Natural Resources
PROJECT NAME AND LOCATION
Clinton River Cut-Off BAS Study
PROJECT ADDRESS (if applicable) 36110 Jefferson Ave Harrison Twp MI 48045
CLIENT AGENCY CONTACT
John Terpstra, Regional Field Planner
TELEPHONE NUMBER
(248) 672-7584
DTMB - DCD PROJECT DIRECTOR
Mustafa N. Bahjet
TELEPHONE NUMBER
517.749.7519
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
36110 Jefferson Ave Harrison Twp MI 48045at site October 17th at 1:30 PM
FORMCHECKBOX
MANDATORY (Check box if Mandatory)
FORMCHECKBOX
LEIN CHECK (Dept. of Corrections ONLY) Submit request to: name of contact at name of facility, phone number no later than 12:00 p.m. on the 3rd day prior to the scheduled Walk-Through. Please include in your request, the project name and date, time and place of the Pre-Proposal Walk-Through.
PROJECT DESCRIPTION/SERVICES REQUESTED
DTMB in partnering with DNR is seeking proposals including phase 100-300 to :
a. Study the causes of heavy sedimentation accumulation and occasional ramp blocking at the existing active boat access site launch area. Expand this study into the neighboring DNR in-active boat access launch area to the south west of this property.
b. Device possible solutions to eradicate those sedimentations.
c. Explore the possibility of moving the boat access launch to the property at the south west utilizing the existing parking facility.
d. If a break wall solution is one of the options, consideration on impact on neighboring properties should be considered.
e. A conceptual layout(s) with cost estimate is expected for all solutions.
Duration to produce final deliverables is 150 calendar days. A minimum of fi meetings is expected to be convened during the course of the study. Two can be held through the web.
Attachment. Depth Soundings
NIGP CODES
90607,90629, 90642, 90656, & 92548
DESIRED SCHEDULE OF WORK
Complete the study and submit final report in 150 calendar days.
ACCEPTING RFP QUESTIONS UNTIL: All questions are due by the time/date of the walk
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)
Attachment(s)
CoE Study Depth Soundings
Aerial of the BAS
File details come from the government source that posted it. Updated .