Project_Site_Photos.pdf

PDF 2 MB Posted

Attached to
Mary Fire Temp Fence Construction
Solicitation number
140L2625Q0020
Issued by

About this file

These are site photographs documenting terrain and fence construction preparation for the Mary Fire Temporary Fence Construction project in Idaho. The images show various locations in the Buckhorn West and Buckhorn East areas, featuring rocky, snowy terrain with red flagging markers indicating potential fence structure locations. Specific images document brush removal areas, terrain and soil conditions, terminal fence ends, and sites adjacent to existing fencing. The photographs appear intended to provide bidders visual context of the project site conditions for the upcoming BLM fence construction solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BDO BLM FY25 Fence Construction

Mary Temporary Fence (Terrain, Soil Features, & Flagging)

Image 1: Buckhorn West Terrain and soils. Fence structure flagging

Image 2: Buckhorn West Terrain and soils. Fence structure flagging

Image 3: Buckhorn East terrain and soil conditions. Fence structure flagging

Image 4: Buckhorn East adjacent to existing permenent fencing. General terrain, soil/rock conditions, and structure flagging.

Image 5: Buckhorn East. Brush removal area

Image 6: Buckhorn East adjacent to Mary Cr looking West. End Panel Flag

Image 7: Buckhorn East. Terminal end (Rock Jack) of fence at Mary Cr.

File details come from the government source that posted it. Updated .