Project Plans - Road 19 Holiday Farm Fire Scaling.pdf
PDF 3 MB Posted
- Attached to
- Road 19 Holiday Farm Fire Scaling
- Solicitation number
- 1240BK22Q0039
About this file
This document package includes project plans and specifications for road scaling work on Road 19 following the Holiday Farm Fire, as well as the related federal contract opportunity on the USDA Forest Service R6-Pacific Northwest Region website. The project plans outline the scope of scaling and danger tree removal work along 2 miles of Road 19 between mileposts 54.32 and 56.32 in the Willamette National Forest. The work includes assessing and removing loose rock, downed trees, and other debris from cut slopes and above the roadway that pose imminent hazards. All scaled material must be removed from the roadway prior to reopening each day. The federal contract opportunity provides additional details on the solicitation number, opportunity type, description of assessing and removing imminent hazards to Road 19, and identifies the Department of Agriculture Forest Service R6-Pacific Northwest Region as the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment - 002 - Scaling.pdf | ||
| Amendment - 002 - Scaling.pdf | ||
| Amendment - 001 - Scaling.pdf | ||
| Solicitation - Road 19 Holiday Farm Fire Scaling.pdf | ||
| Packet to Return.pdf | ||
| WageDetermination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 1 OF 3
United States Department of Agriculture
Forest Service
DESIGNED BY:
KYLE YEE
DATE
2/9 /22
:0
9 K
YE
E C:
\U
SE
RS
\K
YE
E\
DO
CU
ME
NT
S\
AL
L
DO
CU
ME
NT
S\
EN
GI
NE
ER
IN
G\
PR
OJ
EC
TS
\H
OL
ID
AY
F
AR
M
FI
RE
\S
CA
LI
NG
\D
RA
W
IN
GS
\H
OL
ID
AY
FA
RM
SC
AL
IN
G.
DW
G;
OREGON
LANE COUNTY
R06 PACIFIC NORTHWEST REGION
WILLAMETTE NATIONAL FOREST
MCKENZIE RIVER RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE
1 TITLE SHEET
2 PROJECT AREA MAP
3 SCALING AND ROAD CLEARING LIMITS
SPECIFIED ROADS
ROAD # ROAD NAME LENGTH TYPE OF WORK
19 AUFDERHEIDE DR. 2.00
SCALING AND
DANGER TREE
REMOVAL
PROJECT LOCATION MAP
WILLAMETTE
NATIONAL
FOREST
RECOMMENDED BY
(USACE REPRESENTATIVE):
KARL AHLEN
DATE
RECOMMENDED BY (ZONE ENGINEER):
BRANDON GREEN
DATE
APPROVED BY (DISTRICT RANGER):
DARREN CROSS
DATEAPPROVED BY:
BRANDON GREEN FOR
FOREST ENGINEER
DATE
STATE MAP
ROAD 19
TRAVEL DIRECTIONS:
FROM SPRINGFIELD OREGON: TRAVEL EAST ON STATE HIGHWAY 126 TO APPROXIMATELY MILE POST
45, TURN RIGHT ONTO FOREST SERVICE ROAD 19 (AUFDERHEIDE DRIVE) AND TRAVEL FOR
APPROXIMATELY 3 MILES TO FOREST SERVICE ROAD 1900415 AND THE START OF PROJECT AREA
HOLIDAY FARM FIRE SCALING
AutoCAD SHX Text
PENDLETON
AutoCAD SHX Text
LAKEVIEW
AutoCAD SHX Text
BURNS
AutoCAD SHX Text
ONTARIO
AutoCAD SHX Text
THE DALLES
AutoCAD SHX Text
BEND
AutoCAD SHX Text
PORTLAND
AutoCAD SHX Text
NEWPORT
AutoCAD SHX Text
OREGON CITY
AutoCAD SHX Text
EUGENE
AutoCAD SHX Text P A C I F I C
AutoCAD SHX Text
ROSEBURG
AutoCAD SHX Text
GRANTS PASS
AutoCAD SHX Text
MEDFORD
AutoCAD SHX Text
GOLD BEACH
AutoCAD SHX Text
KLAMATH FALLS
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DETROIT
AutoCAD SHX Text
BEND
AutoCAD SHX Text
SPRINGFIELD
AutoCAD SHX Text
ROSEBURG
AutoCAD SHX Text
SALEM
AutoCAD SHX Text
WILLAMETTE NATIONAL FOREST
AutoCAD SHX Text
SALEM
AutoCAD SHX Text
FOREST SERVICE OFFICE
AutoCAD SHX Text
STATE HWY
AutoCAD SHX Text
U.S. HWY
AutoCAD SHX Text
INTERSTATE HWY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SWEET HOME
AutoCAD SHX Text
MCKENZIE
AutoCAD SHX Text
OAKRIDGE
AutoCAD SHX Text O C E A N
AutoCAD SHX Text
MCKENZIE RIVER R.D.
AutoCAD SHX Text
MIDDLE FORK R.D.
AutoCAD SHX Text
SWEET HOME R.D.
AutoCAD SHX Text
DETROIT R.D.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
MCKENZIE BRIDGE
AutoCAD SHX Text
EUGENE
AutoCAD SHX Text
ALBANY
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/9 /22
:0
9 K
YE
E C :\U
SE
RS
\K
YE
E\
DO
CU
ME
NT
S\
AL
L
DO
CU
ME
NT
S\
EN
GI
NE
ER
IN
G\
PR
OJ
EC
TS
\H
OL
ID
AY
F
AR
M
FI
RE
\S
CA
LI
NG
\D
RA
W
IN
GS
\H
OL
ID
AY
FA
RM
SC
AL
IN
G.
DW
G
R06
PACIFIC NORTHWEST REGION
ROAD 19
HOLIDAY FARM
FIRE
SCALING
WILLAMETTE
NATIONAL FOREST
MCKENZIE RIVER RANGER DISTRICT
PROJECT AREA MAP
02/01/2022
K. YEE
K. YEE
B. GREEN
2 3
W
STATE HWY 126 AND FS ROAD 19
INTERSECTION
APPROXIMATELY 45 MILES TO
SPRINGFIELD OREGON
WATER SOURCE
END OF PROJECT AREA
END OF DANGER TREE
REMOVAL LIMITS
ROAD 19 MP 56.32
44°8.930' N, 122°15.560' W
BEGINNING OF PROJECT AREA
BEGINNING OF DANGER
TREE REMOVAL LIMITS
ROAD 19 MP 54.32
44°7.450' N, 122°14.765' W
N
R 5 E R 5 E
T
S
T
S
T
S
T
S
R 4 E
R 4 E
DISPOSAL SITE (STRUBE FLATS)
NFSR 1900410 MP 1.10
44°8.743'N, 122°14.905'W
ROCK SCALING LOCATION
LIMITS TO BE IDENTIFIED BY CO ONSITE
ROAD 19 MP 54.70
44°7.790' N, 122°14.700' W
COUGAR RESERVOIR
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/9 /22
:0
9 K
YE
E C :\U
SE
RS
\K
YE
E\
DO
CU
ME
NT
S\
AL
L
DO
CU
ME
NT
S\
EN
GI
NE
ER
IN
G\
PR
OJ
EC
TS
\H
OL
ID
AY
F
AR
M
FI
RE
\S
CA
LI
NG
\D
RA
W
IN
GS
\H
OL
ID
AY
FA
RM
SC
AL
IN
G.
DW
G
R06
PACIFIC NORTHWEST REGION
ROAD 19
HOLIDAY FARM
FIRE
SCALING
WILLAMETTE
NATIONAL FOREST
MCKENZIE RIVER RANGER DISTRICT
SCALING AND ROAD
CLEARING LIMITS
02/01/2022
K. YEE
K. YEE
B. GREEN
3 3
Road 19
Army Corps of
Engineering
Infrastructure
Army Corps of
Engineering
Infrastructure
Cougar Reservoir
PROPOSED SCALING LOCATION
ROAD 19 M.P. 54.70
NOTES:
1. ALL LIMITS TO BE MARKED BY CO PRIOR TO START OF WORK
V
H
V
H
ROAD CLEARING LIMITS
EDGE OF FILL SLOPE TO 20' ABOVE ROADWAY
DRAIN DITCH
ROAD CLEARING AND EQUIPMENT
NOT TO SCALE
EXISTING GROUND, VARIES
LEGEND
BASE ITEMS - PROPOSED SCALING LOCATION
OPTIONAL ITEM 2A - PROPOSED SCALING LOCATION
OPTIONAL ITEM 2B - PROPOSED DANGER TREE
REMOVAL LOCATION
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
| Sheets and Views |
| HolidayFarmScaling-COVERSHEET |
| OLE1 |
| HolidayFarmScaling-PLOT |
| OLE1 |
| HolidayFarmScaling-PLOT (2) |
| OLE1 |
| HolidayFarmScaling-PLOT (3) |
| OLE1 |
| HolidayFarmScaling-PLOT (5) |
| OLE1 |
| 2022-02-09T15:13:19-0800 | |
| KYLE YEE |
| 2022-02-11T05:30:45-0800 | |
| AHLEN.KARL.T.1239624134 |
| 2022-02-09T15:17:23-0800 | |
| BRANDON GREEN |
| 2022-02-09T15:17:45-0800 | |
| BRANDON GREEN |
| 2022-02-10T13:24:34-0800 | |
| DARREN CROSS |
File details come from the government source that posted it. Updated .