This amendment modifies an existing federal contract for roadside hazard removal services. The contractor will assess and remove identified imminent hazards along Road 19 from mile markers 54.32 to 56.32 that was burned in the Holiday Farm Fire. Work includes danger tree mitigation and removal of loose debris from cut slopes and rock outcrops. The road must remain passable for administrative and emergency traffic within 30 minutes of work ending each day, and for log trucks between 12:00 AM to 9:00 AM and 12:00 PM to 12:30 PM. The amendment extends the performance period for all line items by two weeks to June 17, 2022. It also adds a clause allowing optional items to be incrementally increased and requires signed agreement for any post-award option exercises.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION
NO.
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
1 March 11, 2022 1059278
6. ISSUED BY CODE 04R4 7. ADMINISTERED BY (If other than Item 6) CODE
Willamette NF Supervisor’s Office 3106 Pierce Parkway, Suite D Springfield OR 97477-7909
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
1240BK22Q0039
9B. DATED (SEE ITEM 11)
March 9, 2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Project Name: Road 19 Holiday Farm Fire Scaling
See page 2 for continuation of Standard Form 30.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Lorenzo Montoya 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
3/11/21 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. 001 - Road 19 Holiday Farm Fire Scaling
ATTACHMENT TO STANDARD FORM 30, (BLOCK 14 CONTINUED)
This amendment makes the following changings.
Add the following option clause:
FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item (Mar 1989) (Tailored Mar.
2022)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor anytime time before expiration of the current period of performance; Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
This option clause may be used more than once to award optional items and sub-items incrementally.
If any options are exercised after award, the Contracting Officer shall ensure with the Contractor that a reasonable amount of time is available before exercising. Additional time will be negotiated, if needed.
Both parties must sign (agree to change) the final modification for any options exercised after award.
(End of Clause)
Page 11 of 57 - Add “The road will also be made passable to log truck traffic between 0000 to 0900 and from 1200-1230.” to the following section. The addition is highlighted yellow.
WARNING SIGNS AND RESTRICTIONS
Contractor shall be solely responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees. Furnish and place all signs in accordance with MUTCD requirements.
A full road closure on Forest Road 1900 is allowed. Maintain traffic control devices during entire closure period. Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated. No work will be allowed on Federal Holidays, or Holiday Weekends unless prior approved by the CO in writing. The road is to be made passable for administrative and emergency traffic within 30 minutes, and made passable at night prior to departing the worksite. The road will also be made passable to log truck traffic between 0000 to 0900 and from 1200-1230.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 14 days in advance.
Two additional weeks of performance time is added to all line items of work. The following shows the updated times in blue:
The performance times: April 4, 2022 to June 3, 2022, for all base items.
April 4, 2022 to June 17, 2022, for all optional items.
Total Period of Performance: April 4, 2022 to June 17, 2022.
The performance times: April 4, 2022 to June 3, 2022, for all base items.
April 4, 2022 to June 17, 2022, for all optional items.
Total Period of Performance: April 4, 2022 to June 17, 2022.
Contract Time Item No. District Hours Estimated Start Work Date Contract Time
1 MRRD 350 April 4, 2022 By June 3, 2022 2 MRRD 80 April 4, 2022 By June 17, 2022
(End of Amendment)
| Text1: | |
| Date2_af_date: | |
| 2022-03-11T13:31:35-0800 | |
| Lorenzo Montoya |