This document contains a federal contract opportunity for construction services. The solicitation is for Project P-381 MULTI-MISSION DRY DOCK #1 at the Portsmouth Naval Shipyard in Kittery, Maine. The project scope involves constructing two additional bays, labeled Drydock #1 North and Drydock #1 West, within the existing superflood basin area at Dry Dock #1. New construction will include precast and cast-in-place concrete floors, walls and center wall separating the new bays, new pump well systems, a pump station building, crane rails, mooring hardware, mechanical and electrical utilities, utility tunnels and all other appurtenances required to ensure operational dry docks. Modifications will also be made to the existing basin closure wall and Berths 1 and 11. The solicitation is being conducted by the Naval Facilities Engineering Command of the Department of the Navy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Information Form.docx | DOCX document | |
| Project Information Form.docx | DOCX document | |
| Sources Sought Notice.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Example
| Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | ||||||||
| (year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | Project $ Value ($100M or >) | New Construction or Renovation | Large Waterfront Facilities such as Piers, Bulkheads, Wharfs, Quaywalls, Dry Docks, Bridges, water retaining structures (locks or dams), off shore fixed facilities, etc. | Experience with installation of marine deep foundation systems such as drilled shafts or rock socketed structural supports | Experience with marine pile driving such as sheets piles, steel piles, concrete piles, or pre-cast concrete piles | Experience with complex, tightly controlled scheduling, sequencing and/or phasing requirements | Projects completed in highly congested, urban, or industrial areas with limited construction laydown space |
| 1 | ||||||||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 |
General Information: Bonding Capacity DUNS Cage Address SB Status POC POC Contact Information Annual Revenue #Offices #employees