About this file
Summary
This is a Project Manual for a roofing renovation project prepared by the California Department of General Services (DGS) Real Estate Services Division for the Department of State Hospitals at Patton State Hospital in San Bernardino, California. The project, designated as Contract 25-298077 and Project Number 00000000006543, involves the complete tear-off of existing clay tile roofing and damaged substrate, structural repairs as required, and installation of a new standing seam metal roof system and single-ply roofing. The work is located at Building T of Patton State Hospital. Sealed bids are due by 2:00 P.M. on March 10, 2026, submitted to the Office of Business and Acquisition Services at 707 Third Street, West Sacramento, California 95605. A Class B contractor license is required to bid the project. The project manual contains comprehensive specifications across multiple divisions including selective demolition, metal fabrications, miscellaneous rough carpentry, sheathing, roof preparation and installation, sheet metal flashing and trim, roof specialties, joint sealants, gypsum board, and interior and exterior painting.
The specifications detail material requirements, installation procedures, quality assurance standards, and performance requirements for all components of the roofing system. Key specifications include standing seam metal roof panels with a 30-year paint warranty and 20-year weathertightness warranty, polyvinyl chloride (PVC) roofing with a 20-year warranty, polyisocyanurate board insulation, and comprehensive flashing and trim systems. The project requires compliance with numerous standards including FM Global listings, ENERGY STAR requirements, and California Department of Public Health standards for volatile organic compound emissions. Contractors must provide valid Certificates of Reported Compliance for any fleet vehicles subject to California Air Resources Board regulations and must comply with all applicable health and safety mandates issued by federal, state, and local governments. The project specifications indicate that the State will occupy the building during construction, requiring coordination to minimize operational disruption, and all demolition materials and debris must be conveyed to ground level using systems independent of the building elevator and disposed of at approved facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Package.pdf | ||
| ADVERTISEMENT_FOR_BID.pdf | ||
| Project_Manual_Book_I.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/13/2025 Project # 00000000006543
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book II of II
INTRODUCTORY INFORMATION
SPECIFICATIONS
DSH BUILDING T REROOF
DEPARTMENT OF STATE HOSPITALS
PATTON STATE HOSPITAL
PATTON, SAN BERNARDINO, CALIFORNIA
Richard Kuyper, Project Director II West Sacramento, California
Consultants: Department of General Services
PROJECT TITLE PAGE
RESDMSTR: 02/03/2014v1 00 01 01 - 1 00000000006453
DOCUMENT 00 01 01
PROJECT TITLE PAGE
Title : DSH Building T Reroof
Client Agency : Department of State Hospitals
Location : Patton State Hospital Patton California 92369
Project Number : 00000000006543
Project Director : Richard Kuyper PDII State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 546-6459 Email: Richard.kuyper@dgs.ca.gov
Consultant : Department of General Services Candace Epstein Senior A&E Telephone Number: (279)946-8597 Email: Candace.epstein@dgs.ca.gov
CERTIFICATIONS PAGE
RESDMSTR: 02/03/2014v1 00 01 05 - 1 00000000006543
DOCUMENT 00 01 05
PROJECT TITLE : Patton State Hospital Building T Reroof
CLIENT AGENCY : Department of State Hospitals
LOCATION : Patton, California 92369
PROJECT NUMBER : 00000000006543
OWNER : STATE OF CALIFORNIA
PROJECT DIRECTOR : Richard Kuyper PDII Department of General Services Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 546-6459 Email : Richard.kuyper@dgs.ca.gov
CONSULTANT :Department of General Services Candace Epstein Senior Architect
ARCHITECT
RESDMSTR: 02/03/2014v1 00 01 05 - 2 00000000006543
TABLE OF CONTENTS
RESDMSTR: 6/20/2025 00 01 10 - 1 0000000006543
DOCUMENT 00 01 10
TABLE OF CONTENTS
BOOK I
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 through 2 00 01 10 Table of Contents .......................................................................... 1 through 3 00 01 15 List of Drawings ............................................................................. 1 only
BIDDING REQUIREMENTS
Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 9 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3 00 41 00 Bid Form (Sample) ........................................................................ 1 through 9 00 43 13 Bidder’s Bond ................................................................................ 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 2 00 45 46 Payee Data Record ....................................................................... 1 through 2
CONTRACTING REQUIREMENTS
Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 14
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 Summary ....................................................................................... 1 through 4 01 21 00 Allowances .................................................................................... 1 through 2
01 25 00 Substitution Procedures ................................................................. 1 through 2 01 29 00 Payment Procedures ..................................................................... 1 through 4 01 31 00 Project Management and Coordination .......................................... 1 through 8 01 31 25 Web-based Project Management System ...................................... 1 through 4
RESDMSTR: 6/20/2025 00 01 10 - 2 0000000006543
01 32 00 Construction Progress Documentation .......................................... 1 through 7 01 32 33 Photographic Documentation ........................................................ 1 through 2 01 33 00 Submittal Procedures .................................................................... 1 through 7 01 35 53 Security Procedures ...................................................................... 1 through 4 01 40 00 Quality Requirements .................................................................... 1 through 6 01 60 00 Product Requirements ................................................................... 1 through 5 01 73 00 Execution ...................................................................................... 1 through 6 01 74 19 Construction Waste Management and Disposal ............................ 1 through 3 Form 01 74 19.01 Construction Waste Estimate......................................................... 1 only 01 74 19.02 Waste Management Report ........................................................... 1 through 2 Section 01 74 20 Recycled Content Certification ....................................................... 1 through 4 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 2 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) ...................................................................................................... 1 through 2 01 77 00 Closeout Procedures ..................................................................... 1 through 9 STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only
BOOK II
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 19 Selective Demolition ...................................................................... 1 through 6
DIVISION 03 – CONCRETE
NOT USED
DIVISION 04 – MASONRY
NOT USED
DIVISION 05 – METALS
Section 05 50 00 Metal Fabrication ........................................................................... 1 through 5
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Section 06 10 53 Miscellaneous Rough Carpentry .................................................... 1 through 5 06 16 00 Sheathing ...................................................................................... 1 through 7
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 01 50.19 Preparation for Reroofing .............................................................. 1 through 4 07 41 00 Standing -Seam Metal Roof Panels ............................................... 1 through 14 07 54 19 Polyvinyl – Chloride (PVC) Roofing ............................................... 1 through 10 07 62 00 Sheet Metal Flashing and Trim ...................................................... 1 through 8 07 71 00 Roof Specialties............................................................................. 1 through 8 07 92 00 Joint Sealants ................................................................................ 1 Through 3
RESDMSTR: 6/20/2025 00 01 10 - 3 0000000006543
DIVISION 08 – NOT USED
DIVISION 09 – FINISHES
Section 09 29 00 Gypsum Board .............................................................................. 1 through 5 09 91 00 Exterior Painting ............................................................................ 1 through 3 09 91 23 Interior Painting ............................................................................. 1 through 5
DIVISION 10 – 32 NOT USED
END OF DOCUMENT
LIST OF DRAWINGS
RESDMSTR: 02/03/2014 00 01 15 - 1 00000000006543
DOCUMENT 00 01 15
LIST OF DRAWINGS
Sheet Number Description
GENERAL
G 001 Cover Sheet G 002 Patton State Hospitals Campus Plan G 024 Building T Original Reference Roof Plan G 025 Building T Original Reference Walls G 026 Building T Addition Reference Roof Plan G 027 Building T Addition Reference Details
ARCHITECTURAL
A 160 Building T Demo Roof Plan A 161 Building T Roof Plan A 162 Bldg. T Enlarged Roof Plan and Skylight DTLS A 532 Roof Details A 534 Roof Details A 535 Roof Details
END OF DOCUMENT
SELECTIVE DEMOLITION
10/7/25:CE 02 41 19 - 1 000000000006543
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to the State ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.4 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure the State's building manager's and other tenants’ on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
10/7/25:CE 02 41 19 - 2 000000000006543
4. Use of elevator and stairs.
5. Coordination of the State's continuing occupancy of portions of existing building and of the State's partial occupancy of completed Work.
C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by demolition operations. Submit before Work begins.
D. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.5 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.6 FIELD CONDITIONS
A. The State will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so the State's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by the State as far as practical.
C. Notify State of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify the State. Hazardous materials will be removed by the State under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.7 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with the State’s operations.
10/7/25:CE 02 41 19 - 3 000000000006543
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
C. Sustainable Design Requirements for Building Reuse:
1. Maintain the existing building structure, envelope, and interior nonstructural elements of a historic building or contributing building in a historic district. Do not demolish such existing construction beyond indicated limits.
2. Maintain the existing building structure, envelope, and interior nonstructural elements of an abandoned or blighted building. Do not demolish such existing construction beyond indicated limits.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by the State. The state does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Engage a professional engineer to perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
D. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.
E. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
F. Survey of Existing Conditions: Record existing conditions by use of measured drawings, preconstruction photographs or video, and templates.
http://www.arcomnet.com/sustainable_design.aspx?topic=120
10/7/25:CE 02 41 19 - 4 000000000006543
1. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. The State will arrange to shut off indicated services/systems when requested by
Contractor.
2. Arrange to shut off utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to the State.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
10/7/25:CE 02 41 19 - 5 000000000006543
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
B. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level.
Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 2 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
9. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to the State.
10/7/25:CE 02 41 19 - 6 000000000006543
4. Transport items to the State's designated storage area.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the State, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions required.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
METAL FABRICATIONS
7/11/2025:CE 05 50 00 - 1 000000000006543
SECTION 05 50 00
METAL FABRICATIONS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Miscellaneous steel framing and supports.
2. Miscellaneous steel trim.
3. Downspout guards.
B. Products furnished, but not installed, under this Section include the following:
1. Anchor bolts, steel pipe sleeves, slotted-channel inserts, and wedge-type inserts indicated to be cast into concrete or built into unit masonry.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1. Fasteners.
2. Shop primers.
3. Downspout guards.
B. Shop Drawings: Show fabrication and installation details. Include plans, elevations, sections, and details of metal fabrications and their connections. Show anchorage and accessory items.
PART 2 - PRODUCTS
2.1 METALS
A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes.
B. Steel Plates, Shapes, and Bars: ASTM A36/A36M.
C. Stainless Steel Bars and Shapes: ASTM A276/A276M, Type 304.
D. Steel Tubing: ASTM A500/A500M, cold-formed steel tubing.
7/11/2025:CE 05 50 00 - 2 000000000006543
2.2 FASTENERS
A. General: Unless otherwise indicated, provide Type 304 stainless steel fasteners for exterior use and zinc-plated fasteners with coating complying with ASTM B633 or ASTM F1941/F1941M, Class Fe/Zn 5, at exterior walls. Select fasteners for type, grade, and class required.
1. Provide stainless steel fasteners for fastening stainless steel.
2.3 MISCELLANEOUS MATERIALS
A. Shop Primers: Provide primers that comply with Section 09 91 13 Exterior Painting and Section 09 91 23 Interior Painting.
B. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79 and compatible with topcoat.
1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer.
C. Water-Based Primer: Emulsion type, anticorrosive primer for mildly corrosive environments that is resistant to flash rusting when applied to cleaned steel, complying with MPI#107 and compatible with topcoat.
D. Epoxy Zinc-Rich Primer: Complying with MPI#20 and compatible with topcoat.
E. Shop Primer for Galvanized Steel: Primer formulated for exterior use over zinc-coated metal and compatible with finish paint systems indicated.
F. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it.
2.4 FABRICATION, GENERAL
A. Shop Assembly: Preassemble items in the shop to greatest extent possible.
Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.
B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.
C. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work.
D. Form exposed work with accurate angles and surfaces and straight edges.
E. Weld corners and seams continuously to comply with the following:
7/11/2025:CE 05 50 00 - 3 000000000006543
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.
F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners or welds where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) fasteners unless otherwise indicated. Locate joints where least conspicuous.
G. Fabricate seams and other connections that are exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.
H. Where units are indicated to be cast into concrete or built into masonry, equip with integrally welded steel strap anchors, not less than 8 inches from ends and corners of units and 24 inches o.c.
2.5 MISCELLANEOUS FRAMING AND SUPPORTS
A. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction.
B. Fabricate steel girders for wood frame construction from continuous steel shapes of sizes indicated.
1. Where wood nailers are attached to girders with bolts or lag screws, drill or punch holes at 24 inches o.c.
2.6 MISCELLANEOUS STEEL TRIM
A. Unless otherwise indicated, fabricate units from steel shapes, plates, and bars of profiles shown with continuously welded joints and smooth exposed edges. Miter corners and use concealed field splices where possible.
B. Provide cutouts, fittings, and anchorages as needed to coordinate assembly and installation with other work.
1. Provide with integrally welded steel strap anchors for embedding in concrete or masonry construction.
C. Galvanize exterior miscellaneous steel trim.
D. Prime exterior miscellaneous steel trim with zinc-rich primer.
7/11/2025:CE 05 50 00 - 4 000000000006543
2.7 DOWNSPOUT GUARDS
A. Fabricate downspout guards from 3/8-inch-thick by 12-inch-wide, steel plate, bent to fit flat against the wall or column at both ends and to fit around pipe with 2-inch clearance between pipe and pipe guard. Drill each end for two 3/4-inch anchor bolts.
B. Galvanize and prime steel downspout guards.
C. Prime steel downspout guards with zinc-rich primer.
2.8 STEEL WELD PLATES AND ANGLES
A. Provide steel weld plates and angles not specified in other Sections, for items supported from concrete construction as needed to complete the Work. Provide each unit with no fewer than two integrally welded steel strap anchors for embedding in concrete.
2.9 GENERAL FINISH REQUIREMENTS
A. Finish metal fabrications after assembly.
2.10 STEEL AND IRON FINISHES
A. Galvanizing: Hot-dip galvanize items as indicated to comply with ASTM A153/A153M for steel and iron hardware and with ASTM A123/A123M for other steel and iron products.
1. Do not quench or apply post galvanizing treatments that might interfere with paint adhesion.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels.
B. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after fabrication and are for bolted or screwed field connections.
C. Field Welding: Comply with the following requirements:
7/11/2025:CE 05 50 00 - 5 000000000006543
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.
D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag screws, wood screws, and other connectors.
E. Provide temporary bracing or anchors in formwork for items that are to be built into concrete, masonry, or similar construction.
3.2 INSTALLATION OF MISCELLANEOUS FRAMING AND SUPPORTS
A. Install framing and supports to comply with requirements of items being supported, including manufacturers' written instructions and requirements indicated on Shop Drawings.
B. Support steel girders on solid grouted masonry, concrete, or steel pipe columns.
Secure girders with anchor bolts embedded in grouted masonry or concrete or with bolts through top plates of pipe columns.
3.3 REPAIRS
A. Touchup Painting:
1. Immediately after erection, clean field welds, bolted connections, and abraded areas. Paint uncoated and abraded areas with same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.
B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A780/A780M.
END OF SECTION 05 50 00
MISCELLANEOUS ROUGH CARPENTRY
7/11/2025:CE 06 10 53 - 1 000000000006543
SECTION 06 10 53
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Framing with dimensional lumber.
2. Wood blocking and nailers.
1.2 DEFINITIONS
A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.
B. Lumber grading agencies, and the abbreviations used to reference them, include the following:
1. NeLMA: Northeastern Lumber Manufacturers' Association.
2. NHLA: National Hardwood Lumber Association.
3. NLGA: National Lumber Grades Authority.
4. SPIB: The Southern Pine Inspection Bureau.
5. WCLIB: West Coast Lumber Inspection Bureau.
6. WWPA: Western Wood Products Association.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.
1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Indicate type of preservative used and net amount of preservative retained.
2. Include copies of warranties from chemical treatment manufacturers for each type of treatment.
1.4 INFORMATIONAL SUBMITTALS
A. Evaluation Reports: For the following, from ICC-ES:
1. Preservative-treated wood.
2. Power-driven fasteners.
3. Powder-actuated fasteners.
4. Expansion anchors.
5. Metal framing anchors.
1.5 DELIVERY, STORAGE AND HANDLING
A. Stack lumber flat with spacers beneath and between each bundle to provide air circulation.
Protect lumber from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.
7/11/2025:CE 06 10 53 - 2 000000000006543
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, provide lumber that complies with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry lumber.
3. Provide dressed lumber, S4S, unless otherwise indicated.
B. Maximum Moisture Content of Lumber: 19 percent for 2-inch nominal thickness or less unless otherwise indicated.
2.2 WOOD-PRESERVATIVE-TREATED MATERIALS
A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with the ground, Use Category UC3b for exterior construction not in contact with the ground, and Use Category UC4a for items in contact with the ground.
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.
2. For exposed items indicated to receive a stained or natural finish, use chemical formulations that do not require incising, contain colorants, bleed through, or otherwise adversely affect finishes.
B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or does not comply with requirements for untreated material.
C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.
D. Application: Treat the following:
1. Wood nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.
2. Wood sills, sleepers, blocking, and similar concealed members in contact with masonry or concrete.
E. Fire-retardant lumber: Chemically treated and pressure impregnated as defined in Section
2303.2 CBC. Lumber shall be stamped by an approved agency at the factory and shall bear identification indicating the fire performance rating thereof.
2.3 DIMENSION LUMBER FRAMING
A. No. 2 grade Douglas fir-larch; WCLIB or WWPA.
7/11/2025:CE 06 10 53 - 3 000000000006543
2.4 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:
1. Blocking.
2. Nailers: All nailers shall match thickness of required insulation.
3. Rooftop equipment bases and support curbs.
B. For items of dimension lumber size, provide Construction, Stud or No. 2 grade lumber of any species.
C. For blocking not used for attachment of other construction, Utility, Stud, or No. 3 grade lumber of any species may be used provided that it is cut and selected to eliminate defects that will interfere with its attachment and purpose.
D. For blocking and nailers used for attachment of other construction, select and cut lumber to eliminate knots and other defects that will interfere with attachment of other work.
2.5 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.
1. Where carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.
B. Nails, Brads, and Staples: ASTM F 1667.
C. Power-Driven Fasteners: NES NER-272.
D. Wood Screws: ASME B18.6.1.
E. Lag Bolts: ASME B18.2.1.
F. Bolts: Steel bolts complying with ASTM A 307, Grade; with ASTM A 563 hex nuts and, where indicated, flat washers.
G. Screws for Fastening to Metal Framing: length as recommended by screw manufacturer for material being fastened.
H. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as determined by testing per ASTM E 488 conducted by a qualified independent testing and inspecting agency.
1. Material: Carbon-steel components, zinc plated to comply with ASTM B 633, Class Fe/Zn 5.
2. Material: Stainless steel with bolts and nuts complying with ASTM F 593 and ASTM F 594, Alloy Group 1 or 2.
7/11/2025:CE 06 10 53 - 4 000000000006543
I. Epoxy Anchors: Stainless steel anchor bolts, Alloy Group 1, ASTM F 593 and nuts, ASTM F 594. Injectable epoxy to be Hilti HIT-RE 500, or equal.
2.6 METAL FRAMING ANCHORS
A. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following:
1. Cleveland Steel Specialty Co.
2. KC Metals Products, Inc.
3. Phoenix Metal Products, Inc.
4. Simpson Strong-Tie Co., Inc.
5. USP Structural Connectors.
6. Or equal.
B. Galvanized-Steel Sheet: Hot-dip, zinc-coated steel sheet complying with ASTM A 653/A 653M, G60 coating designation.
1. Use for interior locations unless otherwise indicated.
C. Hot-Dip Heavy-Galvanized Steel Sheet: ASTM A 653/A 653M; Structural Steel (SS), high-strength low-alloy steel Type A (HSLAS Type A), or high-strength low-alloy steel Type B (HSLAS Type B); G185 coating designation; and not less than 0.036 inch thick.
1. Use for wood-preservative-treated lumber and where indicated.
D. Stainless-Steel Sheet: ASTM A 666.
1. Use for exterior locations and where indicated.
2.7 MISCELLANEOUS MATERIALS
A. Adhesives for Gluing Furring and Sleepers to Concrete or Masonry: Formulation complying with ASTM D 3498 that is approved for use indicated by adhesive manufacturer.
1. Adhesives shall have a VOC content of 70 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
2. Adhesives shall comply with the testing and product requirements of the California Department of Public Health’s "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."
B. Flexible Flashing: Composite, self-adhesive, flashing product consisting of a pliable, butyl rubber or rubberized-asphalt compound, bonded to a high-density polyethylene film, aluminum foil, or spun-bonded polyolefin to produce an overall thickness of not less than 0.025 inch.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit carpentry to other construction; scribe and cope as needed for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.
http://www.specagent.com/LookUp/?ulid=6272&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801862&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801863&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801864&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801865&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801866&mf=04&src=wd
7/11/2025:CE 06 10 53 - 5 000000000006543
B. Where wood-preservative-treated lumber is installed adjacent to metal decking, install continuous flexible flashing separator between wood and metal decking.
C. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.
D. Metal Framing Anchors: Install metal framing anchors to comply with manufacturer's written instructions. Install fasteners through each fastener hole.
E. Do not splice structural members between supports unless otherwise indicated.
F. Securely attach carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. CABO NES NER-272 for power-driven fasteners.
2. CBC Table 2304.9.1, "Fastening Schedule".
G. Use steel common nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials.
Make tight connections between members. Install fasteners without splitting wood. Drive nails snug but do not countersink nail heads unless otherwise indicated.
3.2 WOOD BLOCKING AND NAILER INSTALLATION
A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.
B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces unless otherwise indicated.
END OF SECTION 06 10 53
SHEATHING
7/11/2025:CE 06 16 00 - 1 000000000006543
SECTION 06 16 00
SHEATHING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Roof sheathing.
2. Parapet sheathing.
3. Composite nail base insulated roof sheathing.
4. Underlayment.
5. Sheathing joint and penetration treatment.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.
1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated plywood complies with requirements. Indicate type of preservative used and net amount of preservative retained.
2. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated plywood complies with requirements. Include physical properties of treated materials.
3. For fire-retardant treatments, include physical properties of treated plywood both before and after exposure to elevated temperatures, based on testing by a qualified independent testing agency according to ASTM D5516.
4. For products receiving waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.
5. For air-barrier and water-resistant glass-mat gypsum sheathing, include manufacturer's technical data and tested physical and performance properties of products.
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer. including list of ABAA-certified installers and supervisors employed by Installer, who work on Project and testing and inspecting agency.
7/11/2025:CE 06 16 00 - 2 000000000006543
B. Evaluation Reports: For the following, from ICC-ES:
1. Wood-preservative-treated plywood.
2. Fire-retardant-treated plywood.
3. Foam-plastic sheathing.
4. Air-barrier and water-resistant glass-mat gypsum sheathing.
C. Field quality-control reports.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer of air-barrier and water-resistant glass-mat gypsum sheathing.
1. Installer shall be licensed by ABAA according to ABAA's Quality Assurance
Program and shall employ ABAA-certified installers and supervisors on Project.
B. Testing Agency Qualifications:
1. For testing agency providing classification marking for fire-retardant-treated material, an inspection agency acceptable to authorities having jurisdiction that periodically performs inspections to verify that the material bearing the classification marking is representative of the material tested.
2. For testing and inspecting agency providing tests and inspections related to air-barrier and water-resistant glass-mat gypsum sheathing: an independent agency, qualified according to ASTM E329 for testing indicated, and certified by Air Barrier Association of America, Inc.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Stack panels flat with spacers beneath and between each bundle to provide air circulation. Protect sheathing from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Resistance Ratings: As tested according to ASTM E119; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Fire-Resistance Ratings: Indicated by design designations from UL's "Fire
Resistance Directory" or from the listings of another qualified testing agency.
2.2 WOOD PANEL PRODUCTS
A. Emissions: Products shall meet the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of
7/11/2025:CE 06 16 00 - 3 000000000006543
Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
B. Thickness: As needed to comply with requirements specified, but not less than thickness indicated.
C. Factory mark panels to indicate compliance with applicable standard.
2.3 PRESERVATIVE-TREATED PLYWOOD
A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with ground, Use Category UC3b for exterior construction not in contact with ground, and Use Category UC4a for items in contact with ground.
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.
B. Mark plywood with appropriate classification marking of an inspection agency acceptable to authorities having jurisdiction.
C. Application: Treat all plywood unless otherwise indicated and plywood in contact with masonry or concrete or used with roofing, flashing, vapor barriers, and waterproofing.
2.4 FIRE-RETARDANT-TREATED PLYWOOD
A. General: Where fire-retardant-treated materials are indicated, use materials complying with requirements in this article that are acceptable to authorities having jurisdiction and with fire-test-response characteristics specified as determined by testing identical products per test method indicated by a qualified testing agency.
B. Fire-Retardant-Treated Plywood by Pressure Process: Products with a flame-spread index of 25 or less when tested according to ASTM E84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet beyond the centerline of the burners at any time during the test.
1. Use treatment that does not promote corrosion of metal fasteners.
2. Exterior Type: Treated materials shall comply with requirements specified above for fire-retardant-treated plywood by pressure process after being subjected to accelerated weathering according to ASTM D2898. Use for exterior locations and where indicated.
3. Interior Type A: Treated materials shall have a moisture content of 28 percent or less when tested according to ASTM D3201/D3201M at 92 percent relative humidity. Use where exterior type is not indicated.
4. Design Value Adjustment Factors: Treated lumber plywood shall be tested according to ASTM D5516 and design value adjustment factors shall be calculated according to ASTM D6305. Span ratings after treatment shall be not less than span ratings specified.
7/11/2025:CE 06 16 00 - 4 000000000006543
C. Kiln-dry material after treatment to a maximum moisture content of 15 percent. Do not use material that is warped or does not comply with requirements for untreated material.
D. Identify fire-retardant-treated plywood with appropriate classification marking of qualified testing agency.
E. Application: Treat all plywood unless otherwise indicated.
1. Roof and wall sheathing within 48 inches of fire walls.
2. Roof sheathing.
3. Subflooring and underlayment for raised platforms.
2.5 ROOF SHEATHING
A. Plywood Sheathing: , Exterior, Structural I sheathing.
1. Span Rating: Not less than 16/0.
2. Nominal Thickness: Not less than 1/2 inch.
B. Oriented-Strand-Board Sheathing: DOC PS 2, Exposure 1, Structural I sheathing.
1. Span Rating: Not less than 16/0.
2. Nominal Thickness: Not less than 5/8 inch .
2.6 PARAPET SHEATHING
A. Plywood Sheathing: Either DOC PS 1 or DOC PS 2, Exterior, Structural I sheathing.
1. Span Rating: Not less than 16/0.
2. Nominal Thickness: Not less than 1/2 inch.
B. Oriented-Strand-Board Sheathing: DOC PS 2, Exposure 1, Structural I sheathing.
1. Span Rating: Not less than 16/0.
2. Nominal Thickness: Not less than 5/8 inch.
C. Glass-Mat Gypsum Sheathing: ASTM C1177/C1177M.
1. Basis-of-Design Product: Subject to compliance with requirements, provide USG
Corporation; USG Securock® Brand Glass-Mat Sheathing or a comparable product by one of the following:
a. CertainTeed Corporation.
b. GP Gypsum.
c. National Gypsum Company.
d. Temple-Inland Building Products by Georgia-Pacific.
e. Or Equal
2. Type and Thickness: Type X, 5/8 inch thick.
3. Size: 48 by 96 inches for vertical installation.
D. Cementitious Backer Units: ASTM C1325, Type A.
1. Basis-of-Design Product: Subject to compliance with requirements, provide USG
Corporation; USG Durock Cement Board or a comparable product by one of the following:
a. C-Cure.