Project Manual (28).pdf

PDF 16 MB Posted

Attached to
E994 CID02 Water System Improvements Rebid
Solicitation number
24-065-136-E994
Issued by
Foard County, Texas

About this file

Summary of Project Manual for Water System Improvements

This is a construction advertisement and invitation for bids issued by the City of Fayetteville, Texas for water system improvements funded through the General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Development Block Grant - Mitigation (CDBG-MIT) program. The project encompasses distribution piping installation, water plant modifications, a new booster station, and yard piping work. Bids were originally due June 15, 2026 at 7 pm, with the project being rebid with a new deadline of August 12, 2026 at 1 pm at 202 West Main Street, Fayetteville, Texas. A non-mandatory prebid meeting was scheduled for July 21, 2026 at 10 am at the same location. The bid schedule includes 55 line items with specified quantities, ranging from mobilization and safety plans to piping installation of various diameters (1-inch through 8-inch), gate valves, fire hydrants, and concrete work totaling approximately 14,400 square feet of asphalt replacement. The contractor must complete all work within 210 calendar days from the notice to proceed, with substantial completion required within 180 days.

Bids must be submitted on the provided forms with a bid bond of 5 percent of the total bid amount for contracts exceeding $100,000, or an acceptable alternative such as certified check or U.S. Government Bonds. The City of Fayetteville reserves the right to reject any or all bids. Bid and contract documents are available at the City offices or through www.civcastusa.com at no cost for download, or for a $200 deposit per hard copy set (refundable upon return within 10 days). All work is subject to Davis-Bacon prevailing wage requirements, federal nondiscrimination provisions, Section 3 compliance, and debarment/suspension verification through the System for Award Management (SAM). The contractor must obtain performance and payment bonds, Worker's Compensation Insurance with minimum public liability coverage of $1,000,000, and comply with all federal, state, and local laws. Liquidated damages are set at $500 per calendar day for completion delays, with the contractor responsible for maintaining traffic safety, dust control, waste removal, and site restoration. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, Section 3 Businesses, and labor surplus area firms are encouraged to submit bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Advertisement and Invitation for Bids

The City of Fayetteville will receive bids for Water System Improvements, CID 02 GLO CDBG-MIT 24-065-136-E994 until 1 pm August 12, 2026 at 202 West Main Street. Bids must be addressed to:

Mayor Mike Stroup, City of Fayetteville. The bids will be publicly opened and read aloud at 1 pm on Wednesday August 12, 2026 at 202 West Main Street, Fayetteville, Texas 78940.

This project is being rebid. Bids are invited for several items and quantities of work as follows:

1. Distribution Piping Installation.

2. Water Plant modifications.

3. New Booster station.

4. Yard Piping.

Bid/Contract Documents, including Drawings and Technical Specifications are on file at the City of Fayetteville, 202 West Main Street, Fayetteville, Texas or www.civcastusa.com.

Copies of the Bid/Contract Documents may be obtained by depositing $200.00 with Weishuhn Engineering, Inc. for each set of documents obtained or you may download at no cost from civcastusa.com. The deposit will be refunded if the documents and drawings are returned in good condition within 10 days following the bid opening.

A non-mandatory prebid meeting will be held on Tuesday July 21, 2026 at 10 am at 202 West Main St. Fayetteville, TX.

A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Fayetteville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

The project to be constructed will be financed with assistance from the General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Development Block Grant - Mitigation (CDBG-MIT) program and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing Davis- Bacon and Related Acts wage rate, as issued by the Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin. Adherence to the City of Fayetteville Section 3 Policy is required for all contracts.

All contractors and subcontractors must be cleared (not suspended or debarred) prior to any formal action authorizing the award of a contract to the contractor. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, Section 3 Businesses, and labor surplus area firms are encouraged to submit bids.

The City of Fayetteville reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by City of Fayetteville for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.

City of Fayetteville Mike Stroup, (Mayor) June 26. 2026 http://www.civcastusa.com/

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION

The project to be constructed will be financed with assistance from the General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Development Block Grant - Mitigation (CDBG-MIT) program and is subject to all applicable Federal and State laws and regulations. The City of Fayetteville is the subrecipient of the grant funding and is hereby referred to as “City”.

1. Use of Separate Bid Forms

These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.

2. Interpretations or Addenda

No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the City or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.

If an addendum to the bid package is necessary, it must be distributed to each potential bidder. The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file. The addendum shall allow adequate time for consideration in bid preparation (usually at least one week). If adequate time is not available, the bid opening date must be extended and the City must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date.

3. Inspection of Site

Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The City will be justified in rejecting any claim based on lack of inspection of the site prior to the bid. A prebid meeting will be held on Thursday May 21, 2026 at 11 am at the City office 202 West Main Street Fayetteville, TX.

4. Alternate bid items

No alternate bids or bid items will be considered unless they are specifically requested by the technical specifications.

5. Bids

a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.

b. All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.

c. Bid documents, including but not limited to the bid, the bid bond(s), the contractor’s certifications, Certification of Bidder Regarding Civil Rights Laws and Regulations, Certification of Efforts to comply with Section 3, Local Opportunity Plan, Conflict of Interest Questionnaire, Non-collusion Affidavit of Prime Bidder, Certification Regarding Lobbying and Disclosure of Lobbying Activities, Proposed Contract Breakdown, Certificate of Recovered Materials, and the Statement of the Bidder’s Qualifications, shall be sealed in an envelope and clearly labeled with the words "Bid Documents”, the project’s contract number, name of bidder and the date and time of bid opening.

d. The City may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.

e. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.

6. Bid Modifications Prior to Bid Opening

a. Any bidder may modify its bid by submitting a modification or supplemental bid at any time prior to the scheduled closing time for receipt of bids, provided such modification or supplemental bid is received by the City prior to the closing time. The modification or supplemental bid should not reveal the original bid price but should provide only the addition, subtractions or other modifications to the original bid so that the final prices or terms will not be known by the City of Fayetteville until the sealed bid is open.

7. Bid Bond

a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid [for contracts greater than $100,000]. A certified check or bank draft payable to the City of Fayetteville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

b. The bid bond or its comparable, will be returned to the bidder as soon as practical after the opening of the bids.

8. Statement of Bidders Qualifications

Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications. The City shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform its obligations under the contract, and the bidder shall furnish the City all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available data does not satisfy the City that the bidder is qualified to carry out properly the terms of the contract.

9. Unit Price

The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.

10. Corrections:

Erasures or other corrections in the bid must be noted over the signature of the bidder.

11. Time for Receiving Bids

Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the City that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.

12. Opening of Bids

The City shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.

13. Withdrawal of Bids

Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating its purpose in writing to the City. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.

14. Award of Contract/Rejection of Bids

a. The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid. The bidder selected will be notified at the earliest possible date. The City reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.

b. The City reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.

15. Execution of Agreement/Performance and Payment Bonds

a. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work

b. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to furnish to the governmental entity a payment bond in the amount of the contract. The payment bond must be filed within 30 days from the date of the Notice of Award:

▪ Municipalities: If the contract is in excess of $50,000, a payment bond is required.

▪ Counties: If the contract is in excess of $25,000, a payment bond is required.

c. The failure of the successful bidder to execute the agreement and supply the required bonds within thirty (30) days from the date of the notice of award-or within such extended period as the City may grant, shall constitute a default and the City may, at its option either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the City may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the City for a refund.

16. Wages and Salaries

Attention is particularly called to the requirement of paying not less than the prevailing Davis Bacon Related Acts (DBRA) wage rates specified in the Contract Documents. These rates are minimums to be paid during the life of the contract. It is therefore the responsibility of the Bidder to inform themselves as to local labor conditions.

17. Equal Employment Opportunity

Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin, and other civil rights requirements.

18. Certification Regarding Lobbying

Contractors who apply or bid for an award of $100,000 or more shall provide the required certification that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer of employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 USC § 1352.

19. System for Award Management (SAM)

All contractors and subcontractors must be searched on www.sam.gov and cleared (not suspended or debarred) prior to any formal action authorizing the award of a contract to the contractor.

http://www.sam.gov/

BID SCHEDULE AND FORM

ARTICLE 1. BID RECIPIENT

1.01 This Bid is submitted to:

City of Fayetteville, Texas

202 West Main Street

Fayetteville, TX 78940

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2. BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instruction to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to writing upon request of Owner.

ARTICLE 3. BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:

Addendum No. Addendum Date

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress and performance of the Work.

C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. <Reserved>

E. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site, information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.

F. Based on the information and observations referred to in Paragraph 3.01. E. above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the time required, and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.

ARTICLE 4. BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01. D.:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

Construction Advertisement and Invitation for Bids

The City of Fayetteville will receive bids for Water System Improvements, CID 02 GLO CDBG-MIT 24-065- 136-E994 until 7 pm June 15, 2026 at 202 West Main Street. Bids must be addressed to: Mayor Mike Stroup, City of Fayetteville. The bids will be publicly opened and read aloud at 7 pm on Monday June 15, 2026 at 202 West Main Street, Fayetteville, Texas 78940.

Bids are invited for several items and quantities of work as follows:

1. Distribution Piping Installation.

2. Water Plant modifications.

3. New Booster station.

4. Yard Piping.

Bid/Contract Documents, including Drawings and Technical Specifications are on file at the City of Fayetteville, 202 West Main Street, Fayetteville, Texas or www.civcastusa.com.

Copies of the Bid/Contract Documents may be obtained by depositing $200.00 with Weishuhn Engineering, Inc. for each set of documents obtained or you may download at no cost from civcastusa.com. The deposit will be refunded if the documents and drawings are returned in good condition within 10 days following the bid opening.

A non-mandatory prebid meeting will be held on Thursday May 21, 2026 at 11 am at 202 West Main St.

Fayetteville, TX.

A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Fayetteville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

The project to be constructed will be financed with assistance from the General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Development Block Grant - Mitigation (CDBG-MIT) program and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing Davis-Bacon and Related Acts wage rate, as issued by the Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin.

Adherence to the City of Fayetteville Section 3 Policy is required for all contracts.

All contractors and subcontractors must be cleared (not suspended or debarred) prior to any formal action authorizing the award of a contract to the contractor. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, Section 3 Businesses, and labor surplus area firms are encouraged to submit bids.

The City of Fayetteville reserves the right to reject any or all bids or to waive any informalities in the bidding.

Bids may be held by City of Fayetteville for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.

City of Fayetteville Mike Stroup, (Mayor) May 1, 2026 http://www.civcastusa.com/

ARTICLE 5. BASIS OF BID – CONTRACT 2

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

Item Description Qty Unit Unit Price Total Amount

Mobilization including Performance and Payment Bonds

1 LS

2 Stormwater Pollution Prevention Plan 1 EA

Trench Safety Plan Implementation to 8’ of depth

1,000 LF

4 Traffic Safety Plan 1 EA

Booster Pump Building, including concrete foundation, complete in place

1 LS

Booster Pumps including valves, fittings and appurtenances, complete in place

2 EA

Relocate 60-gallon Air Compressor with appurtenances, complete in place

1 EA

Whitewater Air Compressor with Sight Glass and Level Controls and piping to existing pressure tank, complete in place

1 LS

9 Chlorination Shelter, complete in place 1 LS

Superior Gas Chlorination System, complete in place

1 LS

Chlorinator Ejector Pumps with Piping, isolation, and check valves in Building/Shelter, complete in place

2 EA

12 2” Yard Piping, complete in place 100 LF

13 2” Gate Valves with Valve Box, complete in place

2 EA

14 8” Yard Piping, complete in place 220 LF

15 8” Gate Valves with Valve Box, complete in place

4 EA

Electrical Including Conduit and Wire, New Control Panel, Pressure Switch, Generator Automatic Transfer Switch Relocate, complete in place

1 LS

17 Sidewalk at Water Plant 650 SF

18 Pot Hole/Test Pits for piping locates 50 EA

19 Tapping Sleeves and Valves (6” or 8”), including excavation for work, complete in place

8 EA

20 1” dia. Sch 40 PVC installed by open cut or thru casing, complete in place

610 LF

21 1” dia. Sch 40 PVC installed by boring techniques (no casing), complete in place

40 LF

22 2” dia. Sch 40 PVC installed by open cut or thru casing, complete in place

945 LF

23 2” dia. Sch 40 PVC installed by boring techniques (no casing), complete in place

1,278 LF

24 2” dia. Gate Valve with Valve Box, complete in place

13 EA

25 4” dia Sch 40 PVC casing, installed by open cut techniques (for 2” dia. Lines), complete in place

20 LF

26 4” dia Sch 40 PVC casing, installed by boring techniques (for 2” dia. Lines), complete in place

20 LF

27 4” dia Sch 40 steel casing, installed by boring techniques (for 2” dia. lines), complete in place

350 LF

28 4” dia. C900 PVC installed by open cut or thru casing, complete in place

2,066 LF

29 4” dia C900 PVC installed by boring techniques (no casing), complete in place

100 LF

30 4” dia. Gate Valve with Valve Box, complete in place

16 EA

31 8” dia Sch 40 PVC casing, installed by open cut techniques (for 4” dia. Lines), complete in place

120 LF

32 8” dia Sch 40 PVC casing, installed by boring techniques (for 4” dia. Lines), complete in place

50 LF

33 8” dia Sch 40 steel casing, installed by boring techniques (for 4” dia. lines), complete in place

100 LF

34 6” dia. C900 PVC installed by open cut or thru casing, complete in place

2,285 LF

35 6” dia C900 PVC installed by boring techniques (no casing), complete in place

2,422 LF

36 6” dia. Gate Valve with Valve Box, complete in place

30 EA

37 12” dia Sch 40 PVC casing, installed by open cut techniques (for 6” dia. Lines), complete in place

40 LF

38 12” dia Sch 40 PVC casing, installed by boring techniques (for 6” dia. Lines), complete in place

20 LF

39 12” dia Sch 40 steel casing, installed by boring techniques (for 6” dia. lines), complete in place

120 LF

40 8” dia. C900 PVC installed by open cut or thru casing, complete in place

1,936 LF

41 8” dia C900 PVC installed by boring techniques (no casing), complete in place

4,064 LF

42 8” dia. Gate Valve with Valve Box, complete in place

16 EA

43 16” dia Sch 40 PVC casing, installed by open cut techniques (for 8” dia. Lines), complete in place

140 LF

44 16” dia Sch 40 PVC casing, installed by boring techniques (for 8” dia. Lines), complete in place

40 LF

45 16” dia Sch 40 steel casing, installed by boring techniques (for 8” dia. lines), complete in place

250 LF

46 Line Reconnect 1 EA

47 Tapping Sleeve and Valve Line Reconnects, complete in place

7 EA

48 Customer Reconnects, complete in place 150 EA

49 Existing Fire Hydrant reconnects, complete in place

6 EA

50 New Fire Hydrants, complete in place 11 EA

51 Air Relief Valves, complete in place 3 EA

52 8” Line Stop, complete in place with removal

1 EA

53 Concrete Sidewalk/Driveway Removal and Replacement

300 SF

54 Asphalt Roadway Removal and Replacement

14,400 SF

55 Aggregate Driveway Removal and Replacement

500 SF

TOTAL OF ALL BID PRICES ________________

The Owner may exclude items as a function of grant funds available.

Project will be awarded based on the lowest qualified bid for the base scope total.

Contractor’s acknowledgement of receipt of addenda:

Time of Completion

5.02 Bidder agrees that the Work will be substantially complete within 180 days after the notice to proceed is issued and will be completed and ready for final payment in 210 calendar days in accordance with Paragraph 47 of the General Conditions.

5.03 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 6. ATTACHMENTS TO THIS BID

6.01 The following documents are submitted in order presented with tab sheets labelled as seen below and made a condition in attachments of this Bid:

A. Required Bid security in the form of Bid Bond;

B. List of Proposed Subcontractors;

C. List of Proposed Suppliers;

D. List of Project References;

E. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;

F. Required Bidder Qualification Statement with Supporting Data;

G. List of Liabilities;

H. Financial Statement;

I. Equipment Schedule;

J. Present commitments;

K. Certificate of Insurance;

L. Non-Collusion Affidavit of Prime Bidder;

M. Anti-Lobbying Certification & Disclosure;

N. Construction Contractor’s Local Opportunity Plan;

O. Proposed Contract’s Breakdown;

P. Contractor’s Certification Regarding Civil Rights (Section 504);

Q. Contractor’s Certification Concerning Labor Standards and Prevailing Wage Requirements;

R. Contractor’s Certification Regarding Texas Senate Bill 252;

S. Contractor’s Verification Regarding Texas House Bill 89;

T. Davis-Bacon Wage Rates Fayette County;

U. Form 1295;

V. Conflict of Interest Form CIQ;

W. Certification for Business concerns seeking section 3 (GLO Form);

X. Compliance with the Davis-Bacon and Related Acts- DBRA; and Y. Proof of active SAM Registration for Contractor and valid UEID registration for all

Subcontractors. (Additionally, prime contractors, if awarded, must provide documentation of their agreements with subcontractors to the grant administrator, which must be submitted to the GLO).

ARTICLE 7. DEFINED TERMS

7.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instruction to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 8.

8.01 This Bid is submitted by:

If Bidder is:

An Individual

Name (typed or printed):

By:

Doing business as: (Individual’s signature)

A Partnership

Partnership Name:

By:

(Signature of general partner – attach evidence of authority to sign)

Name (typed or printed):

A Corporation

Corporation Name: (SEAL)

State of Incorporation:

Type (General Business, Professional, Service, Limited Liability):

By:

(signature – attached evidence of authority to sign)

Name (typed or printed):

Title:

(CORPORATE SEAL)

Attest:

Date of Qualification to do business in (State where Project is located) is __/___/___

A Joint Venture

Name of Joint Venture:

First Joint Venturer Name: (SEAL)

(Signature of first joint venture partner – attach evidence of authority to sign)

Second Joint Venturer Name: (SEAL)

(Signature of first joint venture partner – attach evidence of authority to sign)

(Each joint venturer must sign. The manner of signing for each individual, partnership, an corporation that is a party to the joint venture should be in the maner indicated above.)

Bidder’s Business Address

Phone No. Fax No.

Email

SUBMITTED on , 20

State Contractor License No. . (if applicable)

CONSTRUCTION CONTRACT

THIS AGREEMENT made this the __________ day of ___________________, ______, by and between ____________________________ (a corporation organized and existing under the laws of the State of _____________) (a partnership consisting of _______________) (an individual trading as _______________________) [Note 1] hereinafter called the “Contractor”, and The City of Fayetteville hereinafter called the “City”

WITNESSETH, that the Contractor and the City of Fayetteville for the considerations stated herein mutually agree as follows:

ARTICLE 1. Statement of Work. The Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment and services, including utility and transportation services, and perform and complete all work required for the construction of the Improvements embraced in the Project; namely, Water System Improvements, CID 02 including Distribution Piping Installation, Water Plant Modifications, New Booster Station and Yard Piping for the Community Development Block Grant – Mitigation GLO CDBG- MIT 24-065-136-E994 project, all in strict accordance with the contract documents including all addenda thereto, numbered __________________, dated ___________ and _________, all as prepared by ____________________ acting and in these contract documents preparation, referred to as the “Engineer”.

ARTICLE 2. The Contract Price. The City will pay the Contractor for the performance of the Contract in current funds, for the total quantities of work performed at the unit prices stipulated in the Bid for the several respective items of work completed subject to additions and deductions as provided in______________________________ hereof.

ARTICLE 3. The Contract. The executed contract documents shall consist of the following components:

a. This Agreement (pgs. 1-3) f. General Conditions, Part I

b. Addenda g. Special Conditions

c. Invitation for Bids h. Technical Specifications

d. Instructions to Bidders i. Drawings (as listed in the Schedule of Drawings)

e. Signed Copy of Bid j. [Add any applicable documents]

ARTICLE 4. Performance. Work, in accordance with the Contract dated _________________, ________, shall commence on or before ___________________, _______, and Contractor shall complete the WORK within 210 consecutive calendar days thereafter. The date of completion of all WORK is therefore

This Agreement, together with other documents enumerated in this ARTICLE 3, which said other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms the Contract between the parties hereto. In the event that any provision in any component part of this Contract conflicts with any provision of any other component part, the provision of the component part first enumerated in this ARTICLE 3 shall govern, except as otherwise specifically stated.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in triplicate original copies on the day and year first above written.

(The Contractor)

By______________________ (proprietorship, partnership, corporation)

Title___________________________

City of Fayetteville

By____________________________ Title___________________________

Corporate Certifications

I, ______________________________, certify that I am the _________________ of the corporation named as Contractor herein; that ___________________________ who signed this Agreement on behalf of the

Contractor, was then ___________________________ of said corporation; that said Agreement was duly signed for and in behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.

Corporate ________________________________ Seal (Corporate Secretary)

GENERAL CONDITIONS - PART I

FOR CONSTRUCTION

1. Contract and Contract Documents

a. The project to be constructed pursuant to this contract will be financed with assistance from the General

Land Office (GLO) through the Community Development Block Grant – Mitigation (CDBG-MIT) fund and is subject to all applicable Federal and State laws and regulations.

b. The Plans, Specifications and Addenda shall form part of this contract and the provisions thereof shall be binding upon the parties as if they were herein fully set forth.

2. Definitions

Whenever used in any of the Contract Documents, the following meanings shall be given to the terms here in defined:

(a) The term "Contract" means the Contract executed between the City of Fayetteville, hereinafter called the

“City” and ______________________________, hereinafter called “Contractor”, of which these GENERAL CONDITIONS, form a part.

(b) The term "Project Area" means the area within the specified Contract limits of the Improvements contemplated to be constructed in whole or in part under this contract.

(c) The term "Engineer" means Weishuhn Engineering, Inc, Engineer in charge, serving the City with architectural or engineering services, his successor, or any other person or persons, employed by the City for the purpose of directing or having in charge the work embraced in this Contract.

(d) The term "Contract Documents" means and shall include the following: Executed Contract, Addenda (if any), Invitation for Bids, Instructions to Bidders, Signed Copy of Bid, General Conditions, Special Conditions, Technical Specifications, and Drawings (as listed in the Schedule of Drawings).

3. Supervision By Contractor

(a) Except where the Contractor is an individual and personally supervises the work, the Contractor shall provide a competent superintendent, satisfactory to the Engineer, on the work at all times during working hours with full authority to act as Contractor’s agent. The Contractor shall also provide adequate staff for the proper coordination and expediting of his work.

(b) The Contractor shall be responsible for all work executed under the Contract. Contractor shall verify all figures and elevations before proceeding with the work and will be held responsible for any error resulting from his failure to do so.

4. Subcontracts

(a) The Contractor shall not execute an agreement with any subcontractor or permit any subcontractor to perform any work included in this contract until Contractor has verified the subcontractor has been cleared (not suspended or debarred) to participate in federally funded contracts.

(b) No proposed subcontractor shall be disapproved by the City except for cause.

(c) The Contractor shall be as fully responsible to the City for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them.

(d) The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work and required compliance by each subcontractor with the applicable provisions of the Contract.

(e) Nothing contained in the Contract shall create any contractual relation between any subcontractor and the

City.

(f) Contractors are encouraged to subcontract with Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and labor surplus area firms.

5. Fitting and Coordination of Work

The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors, or material suppliers engaged upon this Contract.

6. Payments to Contractor

(a) Partial Payments

1) The Contractor shall prepare the requisition for partial payment as of the last day of the month and submit it, with the required number of copies, to the Engineer for approval. The amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) five percent (5%) of the total amount, to be retained until final payment, and (2) the amount of all previous payments. The total value of work completed to date shall be based on the estimated quantities of work completed and on the unit prices contained in the agreement. The value of materials properly stored on the site shall be based upon the estimated quantities of such materials and the invoice prices. Copies of all invoices shall be available for inspection of the Engineer.

2) Monthly or partial payments made by the City to the Contractor are advanced for the purpose of assisting the contractor to expedite the work of construction. The Contractor shall be responsible for the care and protection of all materials and work upon which payments have been made until final acceptance of such work and materials by the City. Such payments shall not constitute a waiver of the right of the City to require the fulfillment of all terms of the Contract and the delivery of all improvements embraced in this Contract complete and satisfactory to the City in all details.

(b) Final Payment

1) After final inspection and the acceptance by the City of all work under the Contract, the Contractor shall prepare the requisition for final payment which shall be based upon the careful inspection of each item of work at the applicable unit prices stipulated in the Contract. The total amount of the final payment due the Contractor under this Contract shall be the amount computed as described above less all previous payments.

2) Before paying the final estimate, City shall require the Contractor to furnish releases or receipts from all subcontractors having performed any work and all persons having supplied materials, equipment (installed on the Project) and services to the Contractor. The City may make payment in part or in full to the Contractor without requiring the furnishing of such releases or receipts and any payments made shall in no way impair the obligations of any surety or sureties furnished under this Contract.

3) Any amount due the City under Liquidated Damages, shall be deducted from the final payment due the contractor.

(c) Payments Subject to Submission of Certificates

Each payment to the Contractor by the City shall be made subject to submission by the Contractor of all written certifications required of it and its subcontractors.

(d) Withholding Payments

The City may withhold any payment due the Contractor as deemed necessary to protect the City, and if so elects, may also withhold any amounts due from the Contractor to any subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed solely for the benefit of the City and will not require the City to determine or adjust any claims or disputes between the Contractor and its subcontractors or material dealers, or to withhold any moneys for their protection unless the City elects to do so. The failure or refusal of the City to withhold any moneys from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract.

7. Changes in the Work

(a) The City may make changes in the scope of work required to be performed by the Contractor under the

Contract without relieving or releasing the Contractor from any obligations under the Contract or any guarantee given pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise. Additionally, all such change orders must be approved by CDBG-MIT prior to execution of same.

(b) Except for the purpose of affording protection against any emergency endangering health, life, limb or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the City authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract Price will be valid unless so ordered.

(c) If applicable unit prices are contained in the Contract, the City may order the Contractor to proceed with desired unit prices specified in the Contract; provided that in case of a unit price contract the net value of all changes does not increase the original total amount of the agreement by more than twenty-five percent (25%) or decrease the original total amount by more than twenty-five percent (25%) for municipalities and eighteen percent (18%) for counties without the written consent of the contractor. [Texas Local Government Code Section 252.048(d) and Section 262.031(b)]

(d) Each change order shall include in its final form:

1) A detailed description of the change in the work.

2) The Contractor's proposal (if any) or a confirmed copy thereof.

3) A definite statement as to the resulting change in the contract price and/or time.

4) The statement that all work involved in the change shall be performed in accordance with contract requirements except as modified by the change order.

5) The procedures as outlined in this Section for a unit price contract also apply in any lump sum contract.

8. Claims for Extra Cost

(a) If the Contractor claims that any instructions by Drawings or otherwise involve extra cost or extension of time, he shall, within ten days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the City of Fayetteville, stating clearly and in detail the basis of his objections. No such claim will be considered unless so made.

(b) Claims for additional compensation for extra work, due to alleged errors in ground elevations, contour lines, or bench marks, will not be recognized unless accompanied by certified survey data, made prior to the time the original ground was disturbed, clearly showing that errors exist which resulted, or would result, in handling more material, or performing more work, than would be reasonably estimated from the Drawings and maps issued.

(c) Any discrepancies which may be discovered between actual conditions and those represented by the

Drawings and maps shall be reported at once to the City and work shall not proceed except at the Contractor's risk, until written instructions have been received from the City.

(d) If, on the basis of the available evidence, the City determines that an adjustment of the Contract Price and/or time is justifiable, a change order shall be executed.

9. Termination, Delays, and Liquidated Damages

Right of the City to Terminate Contract for Convenience

City may at any time and for any reason terminate Contractor’s services and work at the City's convenience upon providing written notice to the Contractor specifying the extent of termination and the effective date.

Upon receipt of such notice, Contractor shall, unless the notice directs otherwise, immediately discontinue the work and placing of orders for materials, facilities and supplies in connection with the performance of this Agreement.

Upon such termination, Contractor shall be entitled to payment only as follows: (1) the actual cost of the work completed in conformity with this Agreement plus (2) such other costs actually incurred by Contractor as are permitted by the prime contract and approved by City. There shall be deducted from such sums as provided in this subparagraph the amount of any payments made to Contractor prior to the date of the termination of this Agreement. Contractor shall not be entitled to any claim or claim of lien against the City for any additional compensation or damages in the event of such termination and payment.

Right of the City to Terminate Contract for Cause

If the Contractor fails to fulfill in a timely and proper manner its obligations under this Agreement, or if the Contractor violates any of the covenants, conditions, agreements, or stipulations of this Agreement, the City shall have the right to terminate this Agreement by giving written notice to the Contractor of such termination and specifying the effective date thereof, which shall be at least five days before the effective date of such termination. In the event of termination for cause, all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs and reports prepared by the Contractor pursuant to this Agreement shall, at the option of the City, be turned over to the City and become the property of the City. In the event of termination for cause, the Contractor shall be entitled to receive reasonable compensation for any necessary services actually and satisfactorily performed prior to the date of termination.

Notwithstanding the above, the Contractor shall not be relieved of liability to the City for damages sustained by the City of Fayetteville by virtue of any breach of contract by the Contractor, and the City may set-off the damages it incurred as a result of the Contractor’s breach of contract from any amounts it might otherwise owe the Contractor. 2 CFR 200 APPENDIX II(B)

(a) Liquidated Damages for Delays.

If the work is not completed within the time stipulated in the applicable bid for Lump Sum or Unit Price Contract provided, the Contractor shall pay to the City as fixed, agreed, and liquidated damages (it being impossible to determine the actual damages occasioned by the delay) the amount of $500 for each calendar day of delay, until the work is completed. The Contractor and Contractor’s sureties shall be liable to the City for the amount thereof.

(b) Excusable Delays.

1) The right of the Contractor to proceed shall not be terminated nor shall the Contractor be charged with liquidated damages for any delays in the completion of the work due to:

2) Any acts of the Government, including controls or restrictions upon or requisitioning of materials, equipment, tools, or labor by reason of war, national defense, or any other national emergency;

3) Any acts of the City;

4) Causes not reasonably foreseeable by the parties to this Contract at the time of execution which are beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God, terrorism, war, acts of another Contractor in the performance of some other contract with the City, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions.

5) Provided, however, that the Contractor promptly notifies the City within ten (10) days in writing of the cause of the delay. Upon receipt of such notification, the City shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this contract, the delay is properly excusable, the City shall extend the time for completing the work for a period of time commensurate with the period of excusable delay.

10. Assignment or Novation

The Contractor shall not assign nor transfer, whether by assignment or novation, any of its rights, duties, benefits, obligations, liabilities, or responsibilities under this Contract without the written consent of the City. No assignment or novation of this Contract shall be valid unless the assignment or novation expressly provides that the assignment of any of the Contractor's rights or benefits under the Contract is subject to a prior lien for labor performed, services rendered, and materials, tools, and equipment supplied for the performance of the work under this Contract in favor of all persons, Contractors, or corporations rendering such labor or…