About this file

This document is a comprehensive set of project drawings for plumbing and electrical work prepared by Miller Engineering Inc. for the West Virginia Army National Guard (WVANG) at Camp Dawson. The project involves billeting and Reverse Osmosis Treatment (RTI) domestic hot water repairs. The drawings include general site plans, overall phasing plans covering ten phases across eight wings, first and second floor domestic plumbing plans with both demolition and installation details, enlarged plumbing plans for the operations building boiler room, plumbing details and schedules, isometric drawings for billeting and RTI systems, and electrical plans. The scope of work encompasses installation of complete and operable plumbing systems using Type K copper piping with soldered or mechanically pressed fittings, replacement of existing circuit setters with new circuit solvers, installation of wing isolation valves on domestic hot water and domestic hot water return lines, installation of new water softener systems and expansion tanks, and provision of shutoff valves throughout the piping systems. Work includes selective demolition of existing piping in multiple wings, coordination of isolation valves to allow phased construction while maintaining continuous operation of the dining facility, and installation of thermostatic flow control devices.

The project is organized into ten sequential phases beginning with Phase 1, which involves installation of isolation valves to each wing, with subsequent phases progressing through different wings and systems including circuit solver installations, alternate dining facility feed connections, and RTI piping connections to billeting. All work must comply with the current International Plumbing Code, International Mechanical Code, International Fuel Gas Code, and state and local requirements. Pressure testing of all domestic water piping must be performed with water only, with air testing prohibited. Final coordination of scope, dimensions, fixture placement, and routing is the responsibility of the general contractor and all sub-contractors, with verification of field conditions and measurements required prior to bidding. The drawings indicate coordination requirements with all trades involved and include specifications for flexible connections on equipment requiring vibration isolation, access panels at valve locations, and firestopping of all penetrations through fire walls and floors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PENNSYLVANIA OFFICE

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PHONE: (724) 966 - 5655

WEST VIRGINIA OFFICE

54 WEST RUN RD

MORGANTOWN, WV 26508

PHONE: (304) 291 - 2234

WVANG - DAWSON BILLETING AND RTI DOMESTIC

HOT WATER REPAIRS

MEI PROJECT #

DWG TITLE

GENERAL

G000 COVER PAGE

G001 OVERALL SITE PLAN

G002 OVERALL PHASING PLAN

PLUMBING

P000 PLUMBING ABBREVIATIONS

P001 FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO

P001A FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO

P001B FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO

P001C FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO

P001D FIRST FLOOR DOMESTIC PLUMBING PLAN - DEMO

P002 SECOND FLOOR DOMESTIC PLUMBING PLAN - DEMO

P101 FIRST FLOOR DOMESTIC PLUMBING PLAN

P101A FIRST FLOOR DOMESTIC PLUMBING PLAN

P101B FIRST FLOOR DOMESTIC PLUMBING PLAN

P101C FIRST FLOOR DOMESTIC PLUMBING PLAN

P101D FIRST FLOOR DOMESTIC PLUMBING PLAN

P102 SECOND FLOOR DOMESTIC PLUMBING PLAN

P401 ENLARGED PLUMBING DEMO PLAN - OPS

P402 ENLARGED PLUMBING PLAN - OPS

P403 ENLARGED DOMESTIC PLUMBING PLAN

P501 PLUMBING DETAILS & SCHEDULES

P502 PLUMBING DETAILS & SCHEDULES

ELECTRICAL

E401 ENLARGED ELECTRICAL PLAN - OPS

NOTE: ORIGINAL DOCUMENTS ARE IN COLOR

DNDN

WING 1

WING 2

WING 3

WING 4

WING 5

WING 6

WING 7

WING 8

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

G001

OVERALL SITE PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/32" = 1'-0"

FIRST FLOOR DOMESTIC PLAN - OVERALL

N O

D

E S

C R

IP

T

IO

N

D A

T E

WING 1, PHASE 2 FOR INSTALLATION OF NEW

CIRCUIT SOLVERS.

WING 2, PHASE 3 WILL INVOLVE THE INSTALLATION OF A 3"

ALTERNATE DFAC FEED TO BILLETING. SEE P101D.

WING 3, PHASE 10

WING 4, PHASE 9

WING 5, PHASE 7

WING 6, PHASE 8

PHASE 4 WILL CONNECT RTI PIPING WITH BILLETING. SEE P102C FOR

CONTINUATION. SEE P101.

WING 7, PHASE 6 WILL BEGIN ONCE PHASE 5 IS

COMPLETED. PHASE 6 WILL BE SPLIT INTO 2 PARTS

WING 8, PHASE 5 WILL BEGIN WHEN THE PHASE

4 ALTERNATE DFAC FEED IS COMPLETED.

VERIFY SHUTOFF VAVE AT THE BEGINNING OF

THE WING BRANCH (TYP)

1. PHASE 1 WILL BE THE INSTALLAITON OF ISOLATION

VALVES TO EACH WING AS SHOWN ON P001, P002, P101,

AND P102.

2. REMOVE CEILING TILES AND SUPPORT GRID AS

REQUIRED TO PERFORM WORK. REPLACE OR

REINSTALL TILE AND GRID WHERE NECESSARY.

SHEET NOTES

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

G002

OVERALL PHASING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

N O

D

E S

C R

IP

T

IO

N

D A

T E

1/32" = 1'-0"

FIRST FLOOR DOMESTIC DEMO PLAN - OVERALL

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

L

--------------------A------------------------------------------------------------------------------------

AAV AUTOMATIC AIR VENT

ABV ABOVE

AD ACCESS DOOR

ADA AMERICANS WITH DISABLITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATELY

ASSOC ASSOCIATED

ASSY ASSEMBLY

ATC AUTOMATIC TEMPERATURE CONTROL

AUTO AUTOMATIC

AUX AUXILIARY

AV AIR VENT

AVG AVERAGE

AWT AVERAGE WATER TEMPERATURE

---------------B----------------------------------------------------------------------------------------

BB BASEBOARD

BC BALANCING COCK

BD BLOW DOWN

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BFV BUTTERFLY VALVE

BHP BRAKE HORESPOWER

BLDG BUILDING

BLR BOILER

BLW BELOW

BO BLOW OFF

BTM BOTTOM

BOP BOTTOM OF PIPE

BTUH BRITISH THERMAL UNIT PER HOUR

BV BALL VALVE

---------------C---------------------------------------------------------------------------------------

CA COMPRESSED AIR

CAP CAPACITY

CCW COUNTER CLOCKWISE

CDL CONDENSATE DRAIN LINE

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CHKV CHECK VALVE

CHWR CHILLED & HOT WATER RETURN

CHWS CHILLED & HOT WATER SUPPLY

CHWS&R CHILLED & HOT WATER SUPPLY AND RETURN

CIRC CIRCULATING

CI CAST IRON

CIRC CIRCULATING

CKT CIRCUIT

CLG CEILING

CL CENTER LINE

CMU CONCRETE MASONRY UNIT

C/O CLEAN OUT

COL COLUMN

COMB COMBINATION

COMP COMPRESSOR

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

CONT CONTINUATION

CONST CONSTRUCTION

COP COEFFICIENT OF PERFORMANCE

CORR CORRIDOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

Cv COEFFICIENT, VALVE FLOW

CW COLD WATER/CLOCKWISE

CWFT CONDENSER WATER FROM TOWER

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

CWS&R CHILLED WATER SUPPLY AND RETURN

CWTT CONDENSER WATER TO TOWER

---------------D----------------------------------------------------------------------

D DEEP

Db DRY BULB TEMPERATURE(ºF)

DCO DOUBLE CLEAN OUT

DEMO DEMOLISH

DEPT DEPARTMENT

DIA DIAMETER

DIAG DIAGRAM

DISCH DISCHARGE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DN DOWN

DP DIFFERENTIAL PRESSURE

DPT DEW POINT TEMPERATURE(ºF)

DR DRAIN

DWG DRAWING

DWH DOMESTIC WATER HEATER

DX DIRECT EXPANSION

----------------E----------------------------------------------------------------------

EA EACH

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

ENCL ENCLOSURE

ENT ENTERING

EP END PANEL/EXPLOSION PROOF

EQUIP EQUIPMENT

ER ECCENTRIC REDUCER(BOTTOMS FLAT)

ESP EXTERNAL STATIC PRESSURE

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATUR(ºF)

----------------F----------------------------------------------------------------------

ºF FAHRENHEIT

FA FREE AREA

FB FREE BLOW

F&T FLOAT AND THERMOSTATIC TRAP

FC FLEXIBLE CONNECTION

FCD FLOW CONTROL DEVICE

FCO FLOOR CLEAN OUT

FCU FAN COIL UNIT

FD FIRE DAMPER/FLOOR DRAIN

FDN FOUNDATION

FF FOULING FACTOR

FIN FINISHED

FLA FULL LOAD AMPS

FLG FLANGE

FLR FLOOR

FNL FUNNEL

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOS&R FUEL OIL SUPPLY AND RETURN

FOV FUEL OIL VENT

FPB FAN POWERED BOX

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FIN-TUBE/FEET

FTG FITTING

FURN FURNISH

FV FACE VELOCITY

FW FEED WATER

----------------G----------------------------------------------------------------------

G GAS

GALV GALVANIZED

GA GAUGE, GAGE

GC GENERAL CONTRACTOR

GCWR GLYCOL CHILLED WATER RETURN

GCWS GLYCOL CHILLED WATER SUPPLY

GHWR GLYCOL HOT WATER RETURN

GHWS GLYCOL HOT WATER SUPPLY

GLV GLOBE VALVE

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GRAV GRAVITY

GRV GRAVITY ROOF VENTILATOR

GV GATE VALVE

----------------H----------------------------------------------------------------------

H HEIGHT

HB HOSE BIBB

HC HEATING CONTRACTOR;

HANICAPPED

HD HEAD/HUB DRAIN

HG MERCURY

HGR HANGER

HP HORSEPOWER/HEAT PUMP

HORIZ HORIZONTAL

HPD HIGH PRESSURE DRIP

HPR HIGH PRESSURE RETURN

HPS HIGH PRESSURE STEAM

HR HOUR

HTG HEATING

HTR HEATER

HUH HORIZONTAL UNIT HEATER

HV HIGH VELOCITY

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HW HOT WATER

HWBG HOT WATER BELOW GRADE

HWOH HOT WATER OVER HEAD

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HWS&R HOT WATER SUPPLY AND

RETURN

----------------I----------------------------------------------------------------------

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCHES

INV INVERT

IN-WG INCHES-WATER GAGE

INSUL INSULATION

IPS IRON PIPE SIZE

IVS ISOLATION VALVE STATION

IW INDIRECT WASTE

----------------J----------------------------------------------------------------------

JT JOINT

----------------K ---------------------------------------------------------------------

KS KITCHEN SINK

----------------L----------------------------------------------------------------------

L LENGTH

LAV LAVATORY

LBS POUNDS

LBS/HR POUNDS PER HOUR

LF LINEAR FEET

LP LOW PRESSURE

LPD LOW PRESSURE DRIP

LPR LOW PRESSURE RETURN

LPG LOW PETROLEUM GAS

LPS LOW PRESSURE STEAM

LV LOW VELOCITY

LVG LEAVING

LWCO LOW WATER CUTOFF

LWT LEAVING WATER

TEMPERATURE(ºF)

----------------M----------------------------------------------------------------------

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH THOUSAND BTUH

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MFG MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MPD MEDIUM PRESSURE DRIP

MPR MEDIUM PRESSURE RETURN

MPS MEDIUM PRESSURE STEAM

MS MINI-SPLIT SYSTEM

MTD MOUNTED

MTG MOUNTING

MTL METAL

MTR MOTOR

MWT MEAN WATER TEMPERATURE(ºF)

----------------N----------------------------------------------------------------------

N NORTH

N/A NOT APPLICABLE

NC NORMALLY CLOSED; NOISE CRITERIA

NEG NEGATIVE

NIC NOT IN CONTRACT

NM NONMETALLIC

NMAG NONMAGNETIC

NO NORMALLY OPEN

No NUMBER

NOM NOMINAL

NORM NORMAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

NWL NORMAL WATER LEVEL

----------------O----------------------------------------------------------------------

OA OVERALL; OUTSIDE AIR

OC ON CENTER

OCC OCCUPANCY

OCPD OVERCURRENT PROTECTION DEVICE

OD OUTSIDE DIAMETER; OUTSIDE DIMENSION

ODS OXYGEN DEPRIVATION SENSOR

OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED / OWNER INSTALLED

OFD OVER FLOW DRAIN

OH OVERHEAD

OPER OPERATED

OPP OPPOSITE

OPT OPTIONAL; OPTIMUM

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

OSV OIL SAFETY VALVE

OUT OUTLET

OVC OVERCURRENT

OVF OVERFLOW

OZ OUNCE

----------------P----------------------------------------------------------------------

P PUMP

PC PLUMBING CONTRACTOR

PD PRESSURE DROP/PUMP

PE PNEUMATIC - ELECTRIC

PG PRESSURE DROP/PUMP DISCHARGE

PH PHASE

PLBG PLUMBING

PNL PANEL

PR PANEL RADIATOR

PRESS PRESSURE

PRV POWER ROOF VENTILATOR/PRESSURE REDUCING

VALVE

PS PIPE SUPPORT

PSI POUND PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAGE

PT PRESSURE/TEMPERATURE TAP

PTAC PACKAGED TERMINAL AIR CONDITIONER

PVC POLYVINYL CHLORIDE

----------------Q----------------------------------------------------------------------

QTY QUANTITY

----------------R----------------------------------------------------------------------

RA RELIEF/RETURN AIR

RAD RADIATOR

RAF RETURN AIR FIXTURES

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED/RECEIVED

REFRIG REFRIGERANT

REG REGISTER

REINF REINFORCED

REQD REQUIRED

RET RETURN

REV REVISION

RF RETURN/RELIEF FAN

RH REHEAT COIL

RHG REFRIGERANT HOT

RL REFRIGERANT LIQUID

RM ROOM

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RV RELIEF VALVE

RWC RAIN WATER CONDUCTOR

----------------S----------------------------------------------------------------------

SA SUPPLY AIR

SCH SCHEDULE

SDPR SMOKE DAMPER

SENS SENSIBLE

SEP SEPARATOR

SF SUPPLY FAN

SHT SHEET

SK SINK

SP STATIC PRESSURE (INCHES OF WATER)

SPEC SPECIFICATION

SPGR SPECIFIC GRAVITY

SQ SQUARE

SQFT SQUARE FOOT

SS STAINLESS STEEL UNIT

STAT STATIC

STD STANDARD

STL STEEL

STR STRAINER

SUP SUPPLY

SV SAFETY VALVE

SW SWITCH

----------------T----------------------------------------------------------------------

TA THROW AWAY

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TDV TRIPLE DUTY VALVE

TEMP TEMPERATURE

TH THERMOMETER

THK THICK

TK TANK

TMV THRTMOSTATIC MIXING VALVE

TOT TOTAL

TP TRAP PRIMER/TRAP PRIMER SUPPLY

TRANS TRANSITION

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

----------------U----------------------------------------------------------------------

UC UNDERCUT

UF UNDER FLOOR

UG UNDERGROUND

UH UNIT HEATER

UR URINAL

----------------V----------------------------------------------------------------------

V VOLTAGE/VALVE/VENT

VAC VACUUM

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VFS VENTURI FLOW STATION

VOL VOLUME

VRF VARIABLE REFRIGERANT FLOW

VTR VENT THROUGH ROOF

----------------W----------------------------------------------------------------------

W WIDTH

W/ WITH

W/O WITHOUT

WA WATER HAMMER ARRESTER

Wb WET BULB TEMPERATURE(ºF)

WC WATER COLUMN/WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WALL HEATER

WL WATER LEVEL

WP WEATHERPROOF

WT WEIGHT

----------------Y----------------------------------------------------------------------

YCO YARD CLEANOUT

----------------Z----------------------------------------------------------------------

Z ZONE

ZCV ZONE CONTROL VALVE

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P000

PLUMBING

ABBREVIATIONS

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

PLUMBING ABBREVIATIONS

Plumbing Piping System Legend

ABBREVIATION SYSTEM TYPE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DTW DOMESTIC TEMPERED WATER

DTWR DOMESTIC TEMPERED WATER RETURN

N O

D

E S

C R

IP

T

IO

N

D A

T

WING 1

WING 2

WING 3

WING 4

WING 5

WING 6

WING 7

WING 8

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. PHASE 1: SELECTIVELY DEMO PIPING IN WINGS FOR THE

INSTALLATION OF NEW WING ISOLATION VALVES ON THE DHWR.

REFER TO P501 FOR MORE INFORMATION.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P001

FIRST FLOOR

DOMESTIC PLUMBING

PLAN - DEMO

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/32" = 1'-0"

FIRST FLOOR DOMESTIC DEMO PLAN - OVERALL

N O

D

E S

C R

IP

T

IO

N

D A

T

P101A

1 1

1 1

WING 8

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. DEMOLISH EXISTING CIRCUIT SETTER FOR

REPLACEMENT WITH NEW CIRCUIT SOLVER.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P001A

FIRST FLOOR

DOMESTIC PLUMBING

PLAN - DEMO

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/16" = 1'-0"

FIRST FLOOR DOMESTIC DEMO PLAN - AREA A

N O

D

E S

C R

IP

T

IO

N

D A

T

WING 5

WING 6

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. DEMOLISH EXISTING CIRCUIT SETTER FOR

REPLACEMENT WITH NEW CIRCUIT SOLVER.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P001B

FIRST FLOOR

DOMESTIC PLUMBING

PLAN - DEMO

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/16" = 1'-0"

FIRST FLOOR DOMESTIC DEMO PLAN - AREA B

N O

D

E S

C R

IP

T

IO

N

D A

T

4 TAPS THIS SMALL SEGMENT. DEMOLISH EXISTING CIRCUIT

SETTING DEVICES. REPEAT FOR ALL TAPS IN BRANCH. FOR

BILLETING, 1 TAP SERVES 3 ROOMS. SEE ISO ON SHEET P501

(TYP)

WING 4

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. DEMOLISH EXISTING CIRCUIT SETTER FOR

REPLACEMENT WITH NEW CIRCUIT SOLVER.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P001C

FIRST FLOOR

DOMESTIC PLUMBING

PLAN - DEMO

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/16" = 1'-0"

FIRST FLOOR DOMESTIC DEMO PLAN - AREA C

N O

D

E S

C R

IP

T

IO

N

D A

T

NEW TAP LOCATION FOR NEW 3"

DHW DFAC ALT FEED AND FOR

PHASE 2. SEE P101D FOR MORE

DETAIL.

P101D

WING 1

WING 2

1 1

1 1

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P001D

FIRST FLOOR

DOMESTIC PLUMBING

PLAN - DEMO

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

N O

D

E S

C R

IP

T

IO

N

D A

T E

1/16" = 1'-0"

FIRST FLOOR DOMESTIC DEMO PLAN - AREA D

WING 2

WING 3

WING 4

WING 5

WING 6

DINING FACILITY REGION

USE ISOLATION VALVES IN MAIN LOOP

TO CREATE BACKFEEDS TO ONLY

REMOVE ONE SECTION AT A TIME

FROM SERVICE. (TYP)

1 1

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. PHASE 1: SELECTIVELY DEMO PIPING IN WINGS FOR

THE INSTALLATION OF NEW WING ISOLATION

VALVES ON THE DHW+DHWR.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P002

SECOND FLOOR

DOMESTIC PLUMBING

PLAN - DEMO

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/32" = 1'-0"

SECOND FLOOR DOMESTIC DEMO PLAN - OVERALL

N O

D

E S

C R

IP

T

IO

N

D A

T E

WING 8

WING 7

WING 2

WING 3

WING 4

WING 5

WING 6WING 8

WING 7

"ø

D T

W

1"ø DTWR

3"ø DTW

/4

"ø D

T W

R

3" DTW UP

3" DTW UP

"ø

D T

W

1 1

P403

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. NEW WING ISOLATION VALVE. REFER TO P501 DETAIL 4

FOR MORE INFORMATION ON LAYOUT.

2. INSTALL NEW THERMOMETER WITH CIRCUIT SOLVER

ASSEMBLY IN THIS LOCATION. REFER TO P501

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101

FIRST FLOOR

DOMESTIC PLUMBING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1" = 30'-0"

FIRST FLOOR DOMESTIC PLAN - OVERALL

N O

D

E S

C R

IP

T

IO

N

D A

T

P101A

1 1

1 1

1 1

1 1

1 1

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1/2"ø DTW

/2

"ø D

T W

/4

"ø D

T W

/2

"ø D

T W

1/2"ø DTW 1/2"ø DTW

1/2"ø DTW

/2

"ø D

T W

R

/2

"ø D

T W

R

/2

"ø D

T W

R

LOCATE WHERE DHWR CIRCUIT SETTER EXISTS

AND REPLACE WITH CIRCUIT SOLVER (TYP).

DHWR OCCURS IN THE CEILING SPACE ON THE

FIRST FLOOR. SEE P501. (TYP)

1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW

CIRCUT SOLVER. VERIFY LOCATION IN FIELD. (TYP)

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101A

FIRST FLOOR

DOMESTIC PLUMBING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/16" = 1'-0"

FIRST FLOOR DOMESTIC PLAN - AREA A

N O

D

E S

C R

IP

T

IO

N

D A

T E

3/8" = 1'-0"

BILLETING GENERAL PIPING SECTION

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

WING 5

WING 6

EXTEND ALTERNATE

DFAC PIPING UP TO

SECOND FLOOR

/4

"ø D

T W

R

NEW DTWR CONNECT. VALVE OFF WHEN ALT FEED NOT IN USE

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .