Project Drawings.pdf
PDF 13 MB Posted
- Attached to
- Y1DA--Project # 596A4-19-106 - Construction to Upgrade Parking Garage Lighting/Replace Parking Garage Gates
- Solicitation number
- 36C24924R0079
About this file
The provided document is a set of Project Drawings related to Solicitation Number 36C24924R0079, which is for a construction project to upgrade parking garage lighting and replace parking garage gates for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The solicitation seeks proposals for the construction work required for this project, designated as Project # 596A4-19-106. The document does not contain additional details about the required products or services, response dates, pricing terms, set asides, or other salient information. It appears to be solely the project drawings for the construction work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in.pdf | ||
| Solicitation Questions and Answers.pdf | ||
| 36C24924R0079 0001.docx | DOCX document | |
| Project Specifications.pdf | ||
| 36C24924R0079_1.docx | DOCX document | |
| DBA Wage Determination KY20240090 7-26-2024.pdf | ||
| Final Statement of Work.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING LOCATION
SITE LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g /M
E P
P a rk in g
G a ra g e rv t
/8
/2
:1
:1
A
M
G001
COVER SHEET & SHEET INDEX UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 JB HT
VICINITY MAP SITE LOCATION MAP
OWNER
DEPARTMENT OF VETERAN AFFAIRS
HEALTHCARE SYSTEM
LEXINGTON, KY
ARCHITECT/ENGINEER OF RECORD
FFE, INC.
4445 LAKE FOREST DR # 600
BLUE ASH, OH 45242
CONTACT: CLINT WEEKLEY
PHONE: (513) 520-4001
UPGRADE PARKING GARAGE LIGHTING AND
REPLACE PARKING GARAGE GATES
LEXINGTON VA HEALTH CARE SYSTEM
1101 VETERANS DRVE
LEXINGTON, KY 40502
TROY BOWLING CAMPUS
VA PROJECT NUMBER: 596A4-19-106
SHEET INDEX
SHEET NO. SHEET NAME
GENERAL
G001 COVER SHEET & SHEET INDEX
GI002 PHASE AND LAYDOWN AREA PLAN PHASE I
GI003 PHASE AND LAYDOWN AREA PLAN PHASE II
GI004 PHASE AND LAYDOWN AREA PLAN PHASE III
GI005 ICRA CLASS III REQUIREMENTS
ARCHITECTURAL
AD100 DEMOLITION PLANS
AE101 FLOOR PLANS
AE102 ENLARGED PLANS
AE103 ENLARGED PLANS
AE201 EXTERIOR ELEVATION AND SECTIONS
AE401 GUARD BOOTH DETAILS
AE501 DETAILS
PLUMBING
PL101 PLUMBING AND FIRE PROTECTION PLANS
PL501 PLUMBING DETAILS, SCHEDULES, AND ISOMETRICS
ELECTRICAL
E001 LEGEND AND ABBREVIATIONS
E002 ELECTRICAL DETAILS
ED101 ELECTRICAL DEMOLITION PLAN - LEVEL A
EL101a ELECTRICAL LIGHTING PLAN - NEW WORK - WEST END - LEVEL A
EL101b ELECTRICAL LIGHTING PLAN - NEW WORK - EAST END - LEVEL A
EP101a ELECTRICAL POWER PLAN - NEW WORK - WEST END - LEVEL A
EP101b ELECTRICAL POWER PLAN - NEW WORK - EAST END - LEVEL A
EY101 ELECTRICAL TECHNOLOGY PLAN - NEW WORK - LEVEL A
EP200 PANEL SCHEDULES
EP201 PHASE 2 - TEMPORARY GUARD SHACK POWER PLAN - LEVEL A
NTS
NTSGENERAL NOTES
A. THE CONTRACT DRAWINGS AND PROJECT MANUAL (INDICATED BY THE SAME PROJECT NUMBER) ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR) OF ANY
DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.
B. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN.
C. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER
REPRESENTATIVE (COR).
D. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING
DEMOLITION AND CONSTRUCTION.
E. THE CONTRACTOR SHALL MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES
MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
F. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR THE SCHEDULED TIME OF CONSTRUCTION ACTIVITIES. THE CONTRACTING OFFICER REPRESENTATIVE RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE
PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.
G. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
H. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND
REGULATIONS.
I. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION AND EXPECTED QUALITY.
J. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.
K. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES EXACT SIZE AND LOCATION OF ROOF, WALL AND FLOOR OPENINGS SHALL BE VERIFIED WITH CORRESPONDING CONTRACTING TRADES PRIOR TO CONSTRUCTION.
L. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
M. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFY ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER AND CONTRACTING
OFFICER REPRESENTATIVE (COR) PRIOR TO CONSTRUCTION.
N. WHERE EXISTING SURFACES ARE TO BE RE-FINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO RECEIVE THE NEW MATERIALS FOR A LEVEL
AND SMOOTH FINISH.
O. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW CONSTRUCTION.
DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW CONSTRUCTION, TIGHTLY SEAL AND CAULK.
P. GENERAL CONTRACTOR SHALL HOST ONLINE CONSTRUCTION MANAGEMENT SOFTWARE FOR THE DURATION OF THE PROJECT. GENERAL CONTRACTOR TO PROVIDE THE VA A DIGITAL COPY OF SUBMITTAL EXCHANGE DOCUMENTS AT
PROJECT CLOSE OUT.
Q. BEFORE SUBMITTING A BID, THE BIDDER SHALL EXAMINE ALL CONTRACT DOCUMENTS, NOTING, IN PARTICULAR, ALL
REQUIREMENTS THAT MAY AFFECT THE WORK IN ANY WAY.
R. IF THE CONTRACTOR FINDS ANY PERCEIVED AMBIGUITY, CONFLICT, ERROR, OMISSION, OR DISCREPANCY ON OR BETWEEN ANY OF THE CONTRACT DOCUMENTS, OR BETWEEN ANY OF THE CONTRACT DOCUMENTS AND ANY APPLICABLE LAW, THE CONTRACTOR, BEFORE PROCEEDING WITH THE WORK, SHALL PROMPTLY SUBMIT A REQUEST FOR INTERPRETATION (“RFI”) TO THE ARCHITECT FOR AN INTERPRETATION OR CLARIFICATION.
S. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS AND/OR AREAS NOT VISIBLE PRIOR TO
DEMOLITION,
T. CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.
U. VERIFY EXISTING CONDITIONS BEFORE BID AND CONSTRUCTION.
V. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM, MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.
W. IN THE EVENT OF INCONSISTENCY OR CONFLICT WITH THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK, AND COMPLY WITH THE STRICTER REQUIREMENTS.
X. COORDINATE WITH ALL NEW WORK DRAWINGS FROM EACH DISCIPLINE.
Y. CONTRACTOR PARKING SHALL BE DISCUSSED WITH COR DURING KICK OFF MEETING.
No: Revisions: Date:
1 95% CONSTRUCTION DOCUMENTS 02/26/2024
05/08/2024
DN
GUARD HOUSE
C-1
EXIT
DOWN
A B C D E F
GATE 1
GATE 2
GATE 3
TYP.
02.30
01.08
01.10
01.10
01.11
MAINTAIN 24' DRIVE AISLE
PHASE I
01.13
PATIENT ENTRY / EXIT
DURING PHASE I
STAFF ENTRY / EXIT
NO ENTRY / EXIT DURING
PHASE I
AREA OF CONSTRUCTION
01.10
01.18
01.19
GI002
GI002
TYP.
GI002
TYP.
GI002
TYP.
AREA OF WORK
A
LEVEL A
100' - 0"
EXISTING OVERHEAD COILING
DOOR TO REMAIN
EXISTING STRUCTURE TO
REMAIN
EXISTING TRENCH DRAIN TO
REMAIN
EXISTING LINEAR METAL
CEILING TO REMAIN
EXISTING SLOPING CONCRETE
DRIVE
NOTE:
ALL CONSTRUCTION MATERIALS AND
EQUIPMENT MUST FIT THROUGH
EXISTING GARAGE OPENING.
H E
IG
H
T L
IM
IT
A T
IO
N
C L
E A
R A
N C
E
VERIFY IN FIELD
6" REINFORCED CONCRETE
SLAB ON 4" GRANULAR FILL
OVER COMPACTED SOIL WITH
6X6 W2.9XW2.9 WWF
TEMPORARY GUARD BOOTH
WALL PANEL SYSTEM BY
GUARD BOOTH
MANUFACTURER
TEMPORARY GUARD BOOTH
SUPPORT BY GUARD BOOTH
MANUFACTURER
4" X 2" X 3/6" BENT PLATE
ANCHORING BRACKET
TEMPORARY GUARD BOOTH
FLOOR PANEL SYSTEM BY
GUARD BOOTH
MANUFACTURER
GRADE
6"
"1
6"
#4 CONTINUOUS REBAR, TYP
3/4" CHAMFER
4" GRANULAR FILL
COMPACTED SOIL
6"
3/4" DIAMETER X 4" CONCRETE
SCREW ANCHOR
GI002
D
IM
E N
S
IO
N S
B Y
M A
N U
F A
C T
U R
E R
6"
DIMENSIONS BY MANUFACTURER
4' - 4" +/- 6"
TEMPORARY GUARD BOOTH
FLOOR PANEL SYSTEM BY
GUARD BOOTH
MANUFACTURER
TEMPORARY GUARD BOOTH
WALL PANEL SYSTEM BY
GUARD BOOTH
MANUFACTURER
TEMPORARY GUARD BOOTH
DOOR BY GUARD BOOTH
MANUFACTURER
TEMPORARY GUARD BOOTH
BASIS OF DESIGN:
GUARDIAN BOOTH
527 NY-RTE 303,
ORANGEBURG, NY 10962
TEL. (844) 992 6684
WWW.GUARDIANBOOTH.COM
4'-0" x 6'-0" ALUMINUM PANEL
GUARD BOOTH WITH INTERIOR
LIGHTING, EXTERIOR
LIGHTING, DATA PORT, PHONE
LINE, OUTLETS, AIR
CONDITIONING, HEATING, FIRE
EXTINGUISHER, SMOKE
DETECTOR, FIRST AID KIT, AND
WALL MOUNTED FLASHLIGHT.
EXISTING CONCRETE CURB
EXISTING CONCRETE
DRIVEWAY
EXISTING GRASS. SEED AND
STRAW ALL DISTURBED LAWN
AT THE CONCLUSION OF THE
CONSTRUCTION PROJECT
5' - 4" +/-
6" REINFORCED CONCRETE
SLAB ON 4" GRANULAR FILL
OVER COMPACTED SOIL WITH
6X6 W2.9XW2.9 WWF
TEMPORARY GUARD BOOTH
DESK WITH DRAWER BY
GUARD BOOTH
MANUFACTURER
TEMPORARY GUARD BOOTH
SLIDING WINDOW BY GUARD
BOOTH MANUFACTURER
INDICATES CONTAINED AREA
OF WORK DURING EACH
PHASE OF CONSTRUCTION
INDICATES CONTAINED AREA OF
WORK DURING ENTIRE DURATION
OF CONSTRUCTION
P H A S I N G P L A N L E G E N D :
G E N E R A L N O T E S :
A. PHASE I MUST BE COMPLETED BEFORE THE START OF PHASE II.
B. PHASE III CAN BE CONSTRUCTED CONCURRENT WITH OTHER PHASE WORK. SEE SHEET GI004 FOR PHASING AND
LAYDOWN FOR PHASE III.
C. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE
TO THE OVERALL PROJECT.
D. REFER TO DEMOLITION SHEETS FOR ADDITIONAL INFORMATION ON DEMOLITION SCOPE.
E. THE INTENT OF THE PHASING SYSTEM FOR THIS PROJECT IS TO MINIMIZE DISRUPTIONS TO THE TRAFFIC FLOW DURING CONSTRUCTION WHILE MAINTAINING CONTINUOUS PHYSICAL SECURITY AGAINST POTENTIAL THREATS, ILLEGAL OR UNAPPROVED PARKING VIOLATORS, ETC.
F. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE COMPLETED ON WEEKENDS AND PROHIBITED AFTER 9:00PM. COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
G. COORDINATE AND INSTALL TEMPORARY EXITING SIGNAGE. COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR) PRIOR TO ANY AND ALL EXITING ROUTE MODIFICATIONS.
H. SUBMIT A DETAILED PROPOSED PHASING PLAN FOR THE ENTIRE PROJECT FOR VA REVIEW AND ACCEPTANCE. PLAN SHALL INCLUDE A SCHEDULE WITH TIMELINES FOR ALL PHASED OPERATIONS AND SHALL BE SUBMITTED WITHIN 15
CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).
I. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
J. ALL INSTALLED ICRA BARRIERS MUST MAINTAIN AN EGRESS PATH AT ALL TIMES.
K. TEMPORARY WALL REMOVAL SHALL TAKE PLACE AFTER STANDARD OPERATING HOURS.
L. SANDING, DRILLING, CUTTING, PAINTING AND PATCHING WORK MUST BE COMPLETED WITHIN AN ICRA BARRIER.
M. MAINTAIN A 24' DRIVE AISLE AT ALL TIMES DURING ALL PHASES.
N. ALL DUMPSTER/WASTE CONTAINERS MUST BE WITHIN THE AREA OF CONSTRUCTION. SEE PROPOSED DUMPSTER
LOCATION.
O. NOTIFY COR TWO WEEKS PRIOR TO START OF EACH PHASE. COR MUST GIVE WRITTEN APPROVAL BEFORE THE
START OF EACH PHASE.
P. PHASES INCLUDE ALL DEMOLITION AND NEW WORK WITHIN THE EXTENTS OF EACH LOCATION.
Q. PROTECT LANDSCAPING THROUGHOUT ENTIRE DURATION OF CONSTRUCTION. RESTORE ANY LANDSCAPING
DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:4
A
M
GI002
PHASE AND LAYDOWN AREA PLAN
PHASE I
UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
3/32" = 1'-0"
LEVEL A - PHASE I
K E Y P L A N :
NORTH NORTH
1/2" = 1'-0"
TYPICAL EXISTING CONDITION SECTION
AT GARAGE OPENING
LEVEL A
1 1/2" = 1'-0"
SECTION DETAIL AT TEMPORARY
BOOTH FOUNDATION
1/2" = 1'-0"
ENLARGED PLAN AT TEMPORARY
GUARD BOOTH
P H A S E I N O T E S :
a. INSTALL TEMPORARY GUARD BOOTH BEFORE THE END OF PHASE I.
b. INSTALL REMOVEABLE BOLLARDS AT ENTRANCE OF GATE 2. TEMPORARILY REMOVE REMOVABLE BOLLARDS
FROM SLEAVE AT THE END OF PHASE I FOR TRAFFIC ACCESS DURING PHASE II.
c. TEMPORARY CONSTRUCTION FENCE TO BE REMOVED ONCE GATE 2 IS FULLY OPERATIONAL.
D R A W I N G N O T E S :
01.08 HATCHED AREA INDICATES PROPOSED CONTRACTOR'S CONSTRUCTION FENCE EXTENTS WITH GATE AND DUMPSTER STAGING AREA TO REMAIN THROUGH ALL PHASES. PHASING PLAN AND PROJECT EXTENTS ARE PROPOSED BY THE CONTRACTOR. COORDINATE EXTENT OF PHASING AND PROJECT AREA WITH VA COR. CONSTRUCTION ENTRANCE
LOCATION SHALL BE COORDINATED WITH COR BEFORE EACH PHASE.
01.10 MAINTAIN EXISTING PEDESTRIAN SITE ACCESS THROUGHOUT DURATION OF CONSTRUCTION
01.11 SUGGESTED LOCATION OF CONTRACTOR CONSTRUCTION DUMPSTER - COORDINATE LOCATION WITH VA COR
01.13 EXISTING GUARD BOOTH - BOOTH SHALL REMAIN OPEN DURING PHASE I
01.18 TEMPORARY GUARD BOOTH - FOUNDATIONS AND INSTALLATION OF TEMPORARY GUARD BOOTH SHALL BE COMPLETED
DURING PHASE I
01.19 EXISTING LANDSCAPING - PROTECT DURING CONSTRUCTION - MAINTAIN ALL EROSION CONTROL
02.17 EXISTING TRENCH DRAIN TO REMAIN
02.30 EXISTING PLASTIC WATER-FILLED JERSEY BARRIERS TO REMAIN
No: Revisions: Date:
100% BID DOCUMENTS 05/08/2024
C-1
EXIT
DOWN
A B C D E F
MAINTAIN 24' DRIVE AISLE
GATE 1
GATE 2
GATE 3
PATIENT ENTRY / EXIT
DURING PHASE II
STAFF ENTRY / EXIT
NO ENTRY / EXIT
DURING PHASE II
01.11
01.10
01.08
PHASE II
01.14
TYP.
02.30
01.15
AREA OF CONSTRUCTION
01.10
01.10
32.06
02.29
01.19
02.46
02.47
02.46
02.46
01.08
01.08
AREA OF WORK
INDICATES CONTAINED AREA
OF WORK DURING EACH
PHASE OF CONSTRUCTION
INDICATES CONTAINED AREA OF
WORK DURING ENTIRE DURATION
OF CONSTRUCTION
P H A S I N G P L A N L E G E N D :
G E N E R A L N O T E S :
A. PHASE I MUST BE COMPLETED BEFORE THE START OF PHASE II.
B. PHASE III CAN BE CONSTRUCTED CONCURRENT WITH OTHER PHASE WORK. SEE SHEET GI004 FOR PHASING AND
LAYDOWN FOR PHASE III.
C. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE
TO THE OVERALL PROJECT.
D. REFER TO DEMOLITION SHEETS FOR ADDITIONAL INFORMATION ON DEMOLITION SCOPE.
E. THE INTENT OF THE PHASING SYSTEM FOR THIS PROJECT IS TO MINIMIZE DISRUPTIONS TO THE TRAFFIC FLOW DURING CONSTRUCTION WHILE MAINTAINING CONTINUOUS PHYSICAL SECURITY AGAINST POTENTIAL THREATS, ILLEGAL OR UNAPPROVED PARKING VIOLATORS, ETC.
F. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE COMPLETED ON WEEKENDS AND PROHIBITED AFTER 9:00PM. COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
G. COORDINATE AND INSTALL TEMPORARY EXITING SIGNAGE. COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR) PRIOR TO ANY AND ALL EXITING ROUTE MODIFICATIONS.
H. SUBMIT A DETAILED PROPOSED PHASING PLAN FOR THE ENTIRE PROJECT FOR VA REVIEW AND ACCEPTANCE. PLAN SHALL INCLUDE A SCHEDULE WITH TIMELINES FOR ALL PHASED OPERATIONS AND SHALL BE SUBMITTED WITHIN 15
CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).
I. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
J. ALL INSTALLED ICRA BARRIERS MUST MAINTAIN AN EGRESS PATH AT ALL TIMES.
K. TEMPORARY WALL REMOVAL SHALL TAKE PLACE AFTER STANDARD OPERATING HOURS.
L. SANDING, DRILLING, CUTTING, PAINTING AND PATCHING WORK MUST BE COMPLETED WITHIN AN ICRA BARRIER.
M. MAINTAIN A 24' DRIVE AISLE AT ALL TIMES DURING ALL PHASES.
N. ALL DUMPSTER/WASTE CONTAINERS MUST BE WITHIN THE AREA OF CONSTRUCTION. SEE PROPOSED DUMPSTER
LOCATION.
O. NOTIFY COR TWO WEEKS PRIOR TO START OF EACH PHASE. COR MUST GIVE WRITTEN APPROVAL BEFORE THE
START OF EACH PHASE.
P. PHASES INCLUDE ALL DEMOLITION AND NEW WORK WITHIN THE EXTENTS OF EACH LOCATION.
Q. PROTECT LANDSCAPING THROUGHOUT ENTIRE DURATION OF CONSTRUCTION. RESTORE ANY LANDSCAPING
DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITION.
2 3 4 5 6 7 8 9
AE201
LEVEL B
112' - 6"
7 - 0 CLEARANCE
PARKING
ENTRANCE
LEVEL A
100' - 0"
01.01 01.02
02.1802.18
TYP. TYP.
01.04
VA
PARKING
ENTRANCEVA
02.3202.3202.32
DO NOT ENTER7 - 0 CLEARANCEDO NOT ENTER DO NOT ENTER
10.0202.38
13.01
02.3902.39
02.4001.16
TYP.
32.0132.0132.0332.0332.02
TYP.
32.01
E X
IS
T
IN
G
O P
E N
IN
G
1/8" = 1'-0"
PHASING EXTERIOR ELEVATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:5
A
M
GI003
PHASE AND LAYDOWN AREA PLAN
PHASE II
UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
3/32" = 1'-0"
LEVEL A - PHASE II
K E Y P L A N :
D R A W I N G N O T E S :
01.01 TEMPORARY SIGNAGE DURING PHASE II
01.02 EXISTING ENTRANCE SIGN - COVER DURING PHASE II
01.04 PROVIDE TEMPORARY HEIGHT CLEARANCE SIGNAGE DURING PHASES WHEN THIS GATE IS USED AS AN ENTRANCE AND
HIDE EXISTING "DO NOT ENTER" SIGN.
01.08 HATCHED AREA INDICATES PROPOSED CONTRACTOR'S CONSTRUCTION FENCE EXTENTS WITH GATE AND DUMPSTER STAGING AREA TO REMAIN THROUGH ALL PHASES. PHASING PLAN AND PROJECT EXTENTS ARE PROPOSED BY THE CONTRACTOR. COORDINATE EXTENT OF PHASING AND PROJECT AREA WITH VA COR. CONSTRUCTION ENTRANCE
LOCATION SHALL BE COORDINATED WITH COR BEFORE EACH PHASE.
01.10 MAINTAIN EXISTING PEDESTRIAN SITE ACCESS THROUGHOUT DURATION OF CONSTRUCTION
01.11 SUGGESTED LOCATION OF CONTRACTOR CONSTRUCTION DUMPSTER - COORDINATE LOCATION WITH VA COR
01.14 TEMPORARY/RENTED GUARD BOOTH WITH POWER, DATA, AC, AND HEAT, LIGHTING FOR DURATION OF GATE 1 WORK (PHASE II). NEW GUARD BOOTH AT GATE 1 MUST BE REOPENED BEFORE TEMPORARY BOOTH IS REMOVED. CONCRETE FOUNDATIONS MUST BE REMOVED AND HOLES FILLED BEFORE END OF CONSTRUCTION. MAXIMUM SIZE OF
TEMPORARY/RENTED GUARD SHACK TO BE 5' WIDE, 7' IN LENGTH AND 8' IN HEIGHT
01.15 REMOVE REMOVABLE BOLLARDS THIS PHASE
01.16 REMOVABLE BOLLARDS TO BE IN PLACE AFTER THE END OF PHASE II
01.19 EXISTING LANDSCAPING - PROTECT DURING CONSTRUCTION - MAINTAIN ALL EROSION CONTROL
02.18 EXISTING BRICK TO REMAIN
02.29 EXISTING STRIPED PEDESTRIAN WALKWAY
02.30 EXISTING PLASTIC WATER-FILLED JERSEY BARRIERS TO REMAIN
02.32 EXISTING OVERHEAD COILING DOOR TO REMAIN
02.38 EXISTING HEIGHT BAR TO REMAIN
02.39 EXISTING DO NOT ENTER SIGN BAR TO REMAIN
02.40 REMOVE EXISTING DO NOT ENTER BAR SIGN
02.46 EXISTING GRASS AREA
02.47 EXISTING GRAVEL AREA
10.02 MOVE EXISTING HEIGHT BAR TO NEW LOCATION
13.01 NEW PRE-FABRICATED GUARD BOOTH - SEE DETAIL ON AE401
32.01 PERMANENT BOLLARD - SEE DETAIL ON SHEET AE501
32.02 AUTOMATIC FOLDING ARM TRAFFIC BARRIER - SEE ELECTRIC DRAWINGS
32.03 NEW VEHICLE GATE ARM - LOOP TO EXIT - SEE ELECTRICAL DRAWINGS
32.06 NEW YELLOW PEDESTRIAN WALKWAY STRIPING TO BE PERFORMED AFTER HOURS OR ON WEEKENDS DURING PHASE II -
MATCH EXISTING MARKING THICKNESS, COLOR AND STRIPING WIDTH
NORTH
NORTH
LEVEL A
P H A S E 2 N O T E S :
a. REMOVE TEMPORARY GUARD BOOTH AND ASSOCIATED FOUNDATIONS AT THE END OF PHASE II. NEW GUARD BOOTH AT GATE 1 MUST BE FULLY OPERATIONAL BEFORE TEMPORARY GUARD BOOTH AND FOUNDATIONS ARE REMOVED.
b. REMOVABLE BOLLARDS AT ENTRANCE OF GATE 2 TO BE INSTALLED AT THE END OF PHASE II. GATE 1 MUST BE FULLY
OPERATIONAL BEFORE REMOVABLE BOLLARDS ARE REINSTALLED.
c. LANDSCAPING MUST BE RESTORED TO ORIGINAL CONDITION AT LOCATION OF TEMPORARY GUARD BOOTH AT THE END OF
PHASE II, INCLUDING BUT NOT LIMITED TO HOLES AT REMOVED FOUNDATIONS.
d. TEMPORARY CONSTRUCTION FENCE TO BE REMOVED ONCE GATE 1 IS FULLY OPERATIONAL.
e. WORK ON LEVEL 1 MUST BE COMPLETED AFTER HOURS DURING PHASE II.
f. TEMPORARILY COVER THE "DO NOT ENTER" SIGN AT GATE 2 DURING PHASE II. UNCOVER SIGN ONCE PHASE II IS
COMPLETE.
g. PROVIDE TEMPORARY "ENTRANCE" SIGN AT GATE 2 DURING PHASE II. REMOVE TEMPORARY SIGN ONCE PHASE II IS
COMPLETE.
EXIT
DOWN
A B C D E F
EXIT ONLY
GATE 1
GATE 2
GATE 3
PHASE III
PATIENT ENTRY ONLY
NO STAFF ENTRY / EXIT
DURING PHASE III
PATIENT EXIT ONLY
AREA OF CONSTRUCTION
01.16
01.10
01.10
01.10
01.11
01.08
TYP.
02.30
02.29
13.01
02.46
02.47
AREA OF WORK
INDICATES CONTAINED AREA
OF WORK DURING EACH
PHASE OF CONSTRUCTION
INDICATES CONTAINED AREA OF
WORK DURING ENTIRE DURATION
OF CONSTRUCTION
P H A S I N G P L A N L E G E N D :
G E N E R A L N O T E S :
A. PHASE I MUST BE COMPLETED BEFORE THE START OF PHASE II.
B. PHASE III CAN BE CONSTRUCTED CONCURRENT WITH OTHER PHASE WORK. SEE SHEET GI004 FOR PHASING AND
LAYDOWN FOR PHASE III.
C. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE
TO THE OVERALL PROJECT.
D. REFER TO DEMOLITION SHEETS FOR ADDITIONAL INFORMATION ON DEMOLITION SCOPE.
E. THE INTENT OF THE PHASING SYSTEM FOR THIS PROJECT IS TO MINIMIZE DISRUPTIONS TO THE TRAFFIC FLOW DURING CONSTRUCTION WHILE MAINTAINING CONTINUOUS PHYSICAL SECURITY AGAINST POTENTIAL THREATS, ILLEGAL OR UNAPPROVED PARKING VIOLATORS, ETC.
F. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE COMPLETED ON WEEKENDS AND PROHIBITED AFTER 9:00PM. COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
G. COORDINATE AND INSTALL TEMPORARY EXITING SIGNAGE. COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR) PRIOR TO ANY AND ALL EXITING ROUTE MODIFICATIONS.
H. SUBMIT A DETAILED PROPOSED PHASING PLAN FOR THE ENTIRE PROJECT FOR VA REVIEW AND ACCEPTANCE. PLAN SHALL INCLUDE A SCHEDULE WITH TIMELINES FOR ALL PHASED OPERATIONS AND SHALL BE SUBMITTED WITHIN 15
CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).
I. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
J. ALL INSTALLED ICRA BARRIERS MUST MAINTAIN AN EGRESS PATH AT ALL TIMES.
K. TEMPORARY WALL REMOVAL SHALL TAKE PLACE AFTER STANDARD OPERATING HOURS.
L. SANDING, DRILLING, CUTTING, PAINTING AND PATCHING WORK MUST BE COMPLETED WITHIN AN ICRA BARRIER.
M. MAINTAIN A 24' DRIVE AISLE AT ALL TIMES DURING ALL PHASES.
N. ALL DUMPSTER/WASTE CONTAINERS MUST BE WITHIN THE AREA OF CONSTRUCTION. SEE PROPOSED DUMPSTER
LOCATION.
O. NOTIFY COR TWO WEEKS PRIOR TO START OF EACH PHASE. COR MUST GIVE WRITTEN APPROVAL BEFORE THE
START OF EACH PHASE.
P. PHASES INCLUDE ALL DEMOLITION AND NEW WORK WITHIN THE EXTENTS OF EACH LOCATION.
Q. PROTECT LANDSCAPING THROUGHOUT ENTIRE DURATION OF CONSTRUCTION. RESTORE ANY LANDSCAPING
DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:5
A
M
GI004
PHASE AND LAYDOWN AREA PLAN
PHASE III
UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
3/32" = 1'-0"
LEVEL A - PHASE 3
K E Y P L A N :
D R A W I N G N O T E S :
01.08 HATCHED AREA INDICATES PROPOSED CONTRACTOR'S CONSTRUCTION FENCE EXTENTS WITH GATE AND DUMPSTER STAGING AREA TO REMAIN THROUGH ALL PHASES. PHASING PLAN AND PROJECT EXTENTS ARE PROPOSED BY THE CONTRACTOR. COORDINATE EXTENT OF PHASING AND PROJECT AREA WITH VA COR. CONSTRUCTION ENTRANCE
LOCATION SHALL BE COORDINATED WITH COR BEFORE EACH PHASE.
01.10 MAINTAIN EXISTING PEDESTRIAN SITE ACCESS THROUGHOUT DURATION OF CONSTRUCTION
01.11 SUGGESTED LOCATION OF CONTRACTOR CONSTRUCTION DUMPSTER - COORDINATE LOCATION WITH VA COR
01.16 REMOVABLE BOLLARDS TO BE IN PLACE AFTER THE END OF PHASE II
02.29 EXISTING STRIPED PEDESTRIAN WALKWAY
02.30 EXISTING PLASTIC WATER-FILLED JERSEY BARRIERS TO REMAIN
02.46 EXISTING GRASS AREA
02.47 EXISTING GRAVEL AREA
13.01 NEW PRE-FABRICATED GUARD BOOTH - SEE DETAIL ON AE401
NORTH NORTH
LEVEL A
P H A S E III N O T E S :
a. TEMPORARY CONSTRUCTION FENCE TO BE REMOVED ONCE GATE 3 IS FULLY OPERATIONAL.
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
A P
P R
O X
. 4 8"
A .F
.F
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY
DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,
ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER.
INDICATOR (REFER TO PLAN
& ELEVATION)
C.O.R. CONTACT INFO
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CONTACT PHONE NUMBER FIRE
EMERGENCY DIAL 911
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES
AND PROPER I.D.
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PAPER CADDY
ICRA, ILSM, FIRE WATCH,
MISC. FORMS
FRAMED COPY OF C.O.R.
CERTIFICATION
C L A
S S
I
II
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING EXISTING EXHAUST.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
4. WET MOP AREA WITH DISINFECTANT.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
7. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.
3. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.
8. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.
CLASS III WORK ITEMS NOTES:
ALL APPLICABLE FORMS SHALL BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, UTILITY SHUT-DOWN, FIRE / SMOKE WALL, FIRE ALARM
SYSTEM.
CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
DURING CONSTRUCTION BE CERTAIN THAT:
BARRIERS ARE INTACT AND MAINTAINED.
PARTICLE COUNT METER IS AVAILABLE.
NEGATIVE INDICATOR IS AVAILABLE.
INSPECTED / DATED FIRE EXTINGUISHER(S) ARE AVAILABLE AND MOUNTED PROPERLY.
ICRA REQUIREMENTS ARE INTACT AND VERIFY THAT THEY ARE BEING MAINTAINED.
WALK-OFF MATS AND STICKY MATS ARE MAINTAINED PROPERLY.
CONTRACTOR SHALL MAINTAIN BARRIERS, CONFIRM NEGATIVE CONSTRUCTION SPACES, AND DOCUMENT ICRA
REQUIREMENTS DAILY.
SEE SPECIFICATIONS FOR MORE INFECTION CONTROL INFORMATION.
A
B
C
D
E
F
G E N E R A L N O T E S
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III
II
II IV
IV
III
III
IV
IV
IV
I
I
II
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:5
A
M
GI005
ICRA CLASS III REQUIREMENTS UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
NTS
ICRA III - ROOM ELEVATION
C-1
EXIT
DOWN
A B C D
AD100
GATE 1
GATE 2
GATE 3
02.09
02.09
02.09
02.09
02.09
02.09
02.11
02.11
02.13
02.10
02.11
AD100
02.21
02.10
02.10
02.31
02.31
02.31
02.31
02.17
EXISTING
SLOPE DOWN
TO DRAIN
EXISTING
SLOPE DOWN
TO DRAIN
02.17
02.16
02.16
02.31
02.31
TYP.
02.33
02.45
A B C
02.22 02.24
02.25
TYP.
02.26
02.27GATE 1
02.32
REMOVE EXISTING CONCRETE ISLAND
SLAB AND ASSOCIATED REINFORCING
EXISTING STRUCTURAL SLAB TO REMAIN
LEVEL 1
DEMO ABOVE
THIS AREA
AREA OF WORK
A B C
PATIENT RM
D102A
TOILET
D102B
EC
C107
EMS
C106
WOMENS
TOILET
C110A
TOILET
C110
MENS TOILET
C109
02.19
02.20
02.43
02.44
01.07
02.48
L E G E N D:
REMOVE EXISTING WALL
EXISTING WALL TO REMAIN
AREA OUT OF ARCHITECTURE SCOPE
REMOVE ACOUSTICAL CEILING TILE
EXISTING ACOUSTICAL CEILING TILE TO
REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:2
A
M
AD100
DEMOLITION PLANS UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
1/8" = 1'-0"
LEVEL A - PARTIAL DEMOLITION PLAN
1/8" = 1'-0"
LEVEL A - PARTIAL CEILING
DEMOLITION PLAN
1/2" = 1'-0"
ISLAND SLAB DEMOLITION SECTION
D R A W I N G N O T E S :
01.07 PLASTIC ZIP-UP ICRA BARRIER - DO NOT BLOCK HALLWAY ACCESS. SEE SHEET GI005 AND DIVISION 1 SPECIFICATIONS
FOR ICRA AND SAFETY REQUIREMENTS
02.09 REMOVE EXISTING GATES AND CONTROL DEVICES
02.10 EXISTING CONCRETE ISLAND TO REMAIN
02.11 REMOVE EXISTING CONCRETE ISLAND - PATCH EXISTING CONCRETE SLAB FLUSH WITH EXISTING - PREPARE TO
RECEIVE NEW FINISH
02.13 REMOVE EXISTING GUARD SHACK
02.16 REMOVE BOLLARDS, SIGNS, CONDUIT CHASES AND INTERCOM SYSTEMS.
02.17 EXISTING TRENCH DRAIN TO REMAIN
02.19 REMOVE WALL TILE AND SUBSTRATE TO METAL STUD FRAMING - FULL EXTENT OF ALL WALLS WITHIN TOILET ROOM #C110 - SHOWN AS DASHED. REMOVE ALL OTHER WALL MOUNTED ITEMS - SALVAGE FOR REINSTALLATION IN EXISTING
LOCATION
02.20 TEMPORARILY REMOVE EXISTING LAVATORY. SALVAGE FOR REINSTALLATION. ASSOCIATED PIPING TO REMAIN
02.21 SEE ENLARGED DEMOLITION PLAN 4/AD100 FOR WORK ON LEVEL 1 ABOVE
02.22 EXISTING LINEAR METAL CEILING TO REMAIN - REMOVE AND REPLACE AS NEEDED TO INSTALL GUARD BOOTH. RETURN
TO EXISTING CONDITION OR BETTER
02.24 REMOVE PORTION OF EXISTING ACOUSTICAL TILE CEILING SHOWN AS DASHED. ALIGN REMOVAL WITH SUSPENDED
EDGE OF SUSPENDED GRID. SALVAGE TILES IN GOOD SHAPE FOR REINSTALLATION
02.25 REMOVE EXISTING GUARD BOOTH INCLUDING ASSOCIATED CEILING, LIGHTING FIXTURES, ELECTRICAL FIXTURES, MECHANICAL FIXTURES, AND CONTROLS. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS
02.26 REMOVE EXISTING LIGHT FIXTURES - SEE ELECTRICAL DRAWINGS
02.27 EXISTING ACOUSTICAL CEILING TILE AND GRID TO REMAIN
02.31 EXISTING EMBEDDED TRAFFIC DETECTOR LOOP TO REMAIN INACTIVE - SEE ELECTRICAL DRAWINGS
02.32 EXISTING OVERHEAD COILING DOOR TO REMAIN
02.33 LINE OF EXISTING BRICK OPENING AND OVERHEAD DOOR ABOVE
02.43 REMOVE EXISTING WATER CLOSET. SALVAGE FOR REINSTALLATION. ASSOCIATED PIPING TO REMAIN
02.44 REMOVE FLOOR TILE DOWN TO CONCRETE SLAB. PREPARE SLAB FOR NEW FINISH
02.45 REMOVE EXISTING SIGNAGE, SUPPORT POLE AND PEDESTAL
02.48 REMOVE EXISTING CEILING. EXISTING CEILING LIGHTS AND HVAC FIXTURES TO REMAIN.
A. REMOVE ALL FIXTURES AND PROJECTS ASSOCIATED WITH DEMOLISHED CONCRETE ISLANDS.
B. NOISE CONTROL: LOUD-NOISE ACTIVITIES SHALL BE PRE-PLANNED AND SHALL BE SCHEDULED ONLY ON
WEEKENDS OR BETWEEN 5:00 PM AND 9:00 PM MONDAY THRU FRIDAY.
C. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
D. SEE ELECTRICAL DRAWINGS FOR ALL ELECTRICAL FIXTURES TO BE REMOVED.
E. DEMOLITION AT EACH GATE MUST BE PERFORMED IN THE CORRESPONDING PHASE. SEE PHASING PLANS FOR
LOCATION SPECIFIC PHASING INFORMATION.
F. MODIFY AND PROTECT SPRINKLER HEADS TO PROVIDE COVERAGE DURING CONSTRUCTION AS REQUIRED
DURING CEILING DEMOLITION
1/4" = 1'-0"
LEVEL 1 - ENLARGED DEMOLITION PLAN
G E N E R A L N O T E S :
K E Y P L A N :
NORTH NORTH
LEVEL A
C-1
EXIT
DOWN
A B C D E
GI003 2
AE102
AE103
AE103
GATE 1
GATE 2
GATE 3
01.06
32.06
02.29
AE103
TYP.
03.08
TYP.
03.08
TYP.
03.08
02.29
ALIGN
ALIGN
ALIGN
A B C
PATIENT RM
D102A
TOILET
D102B
EC
C107
EMS
C106
WOMENS
TOILET
C110A
TOILET
C110
MENS TOILET
C109
09.02
22.09
AE101 3
22.08
22.12
01.07
11.014
TYP.
09.07
09.08
VARIES
WALL TILE
PAINT
METAL TRIM:
ALUMINUM METAL COVE-
SHAPED TILE EDGING
TRIM4
AE101
NOTE:
ALL WALLS EXCEPT EAST WALL WITHIN
ROOM TO RECEIVE THE WALL FINISH
SCHEME SHOWN HERE.
PROVIDE BULLNOSE FINISH
TILE AT TOP COURSE
REINSTALL ALL EXISTING
WALL MOUNTED
ELEMENTS IN EXISTING
LOCATION
LEVEL 1 NEW
WORK ABOVE
THIS AREA
AREA OF WORK
EXISTING METAL STUD
WALL TO REMAIN
EXISTING WALL FINISH
TO REMAIN
12"x24" CERAMIC WALL TILE
UP TO 4'-0" AFF
5/8" CEMENTITIOUS TILE
BACKERBOARD
12"x24" CERAMIC WALL TILE
CLEAR ANODIZED ALUMINUM
COVE-SHAPED TILE EDGING TRIM
12"x24" CERAMIC FLOOR TILE
5/8" GYPSUM WALL BOARD
NEW ACOUSTICAL CEILING TO
MATCH EXISTING IN EXISTING
LOCATION
CLEAR ANODIZED ALUMINUM
BULLNOSE TILE EDGE TRIM
EXISTING
WALL TILE
METAL TRIM:
ALUMINUM METAL COVE-
SHAPED TILE EDGING
TRIM
AE101
NOTE:
ONLY EAST WALL WITHIN ROOM TO RECEIVE
THE WALL FINISH SCHEME SHOWN HERE.
REINSTALL ALL EXISTING
WALL MOUNTED
ELEMENTS IN EXISTING
LOCATION
EXISTING METAL STUD
WALL TO REMAIN
EXISTING WALL FINISH
TO REMAIN
12"x24" FULL HEIGHT CERAMIC
WALL TILE
5/8" CEMENTITIOUS TILE
BACKERBOARD
12"x24" CERAMIC WALL TILE
METAL COVE-SHAPED TILE
EDGING TRIM
12"x24" CERAMIC FLOOR TILE
NEW ACOUSTICAL CEILING
TO MATCH EXISTING IN
EXISTING LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:2
A
M
AE101
FLOOR PLANS UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
D R A W I N G N O T E S :
A. PROTECT ALL EXISTING CURBS SHOWN TO REMAIN FROM ANY DAMAGE DURING NEW WORK.
B. PATCH AND REPAIR ANY CONCRETE THAT WAS REMOVED DURING THE DEMOLITION PHASE.
C. ALL NEW CONCRETE TO HAVE fc = 4000 PSI YIELD STRENGTH.
D. ARROWS SHOWN ARE NEW PAINTED ARROWS PER SPECIFICATION 32 17 23.
E. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
F. WORK PERFORMED IN TOILET C110 AND PEDESTRIAN STRIPING WITHIN GARAGE MUST BE COMPLETED
AFTER HOURS. SEE COVER SHEET FOR DESCRIPTION OF AFTER HOURS WORK.
G. PROTECT LANDSCAPING THROUGHOUT ENTIRE DURATION OF CONSTRUCTION. RESTORE ANY
LANDSCAPING DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITION.
1/8" = 1'-0"
LEVEL A PARTIAL NEW WORK PLAN
D R A W I N G N O T E S :
01.06 SEE ENLARGED PLAN 2/AE101 FOR WORK ON LEVEL 1 ABOVE
01.07 PLASTIC ZIP-UP ICRA BARRIER - DO NOT BLOCK HALLWAY ACCESS. SEE SHEET GI005 AND
DIVISION 1 SPECIFICATIONS FOR ICRA AND SAFETY REQUIREMENTS
02.29 EXISTING STRIPED PEDESTRIAN WALKWAY
03.08 DASHED LINE DELINEATES EXTENT OF LATEX MASTIC DECK COVERING AT EACH GATE
09.02 NEW CERAMIC FLOOR TILE
09.07 NEW FULL HEIGHT WALL TILE THIS WALL ONLY. ALL OTHER WALLS TO RECEIVE WALL TILE UP
TO 4'-0" A.F.F. SEE INTERIOR ELEVATIONS FOR TILE TREATMENT
09.08 NEW ACOUSTICAL CEILING TILE TO MATCH EXISTING INSTALLED AT EXISTING HEIGHT.
EXISTING LIGHTING FIXTURES TO REMAIN.
11.01 REINSTALL ALL EXISTING WALL MOUNTED MIRROR, SOAP DISPENSER, TOILET PAPER
DISPENSER, TRASH CAN, SIGN, SANITARY PRODUCT DISPENSER, LAVATORY, WATER CLOSET
AND GRAB BARS IN EXISTING LOCATION.
22.08 REINSTALL EXISTING LAVATORY IN EXISTING LOCATION
22.09 PLUMBING LINES WITHIN WALL - SEE PLUMBING DRAWINGS FOR PLUMBING WORK
22.12 REINSTALL EXISTING WATER CLOSET IN EXISTING LOCATION
32.06 NEW YELLOW PEDESTRIAN WALKWAY STRIPING TO BE PERFORMED AFTER HOURS OR ON
WEEKENDS DURING PHASE II - MATCH EXISTING MARKING THICKNESS, COLOR AND STRIPING
WIDTH
1/4" = 1'-0"
LEVEL 1 NEW WORK
1/4" = 1'-0"
INTERIOR ELEVATION C110
K E Y P L A N :
NORTH NORTH
LEVEL A
1 1/2" = 1'-0"
SECTION DETAIL AT INTERIOR FINISH
F I N I S H E S : ( B A S I S O F D E S I G N )
PAINT
PPG PAINTS
PPG14-29 MOTH GRAY
WALL TILE
DALTILE
MODERN LINEAR TAUPE,
ML2, 5/16” THICKNESS, 12X24,
V2:MEDIUM, SCHLUTER SYSTEM TRIM.
GROUT: TEC/POWER GROUT/988 PEARL.
FLOOR TILE
DALTILE
REMINISCENT AGED BEIGE
RM 21, 5/16” THICKNESS, 12X24 SIZE.
GROUT: TEC/POWER GROUT/988 PEARL.
1/4" = 1'-0"
INTERIOR ELEVATION C110
1 1/2" = 1'-0"
SECTION DETAIL AT INTERIOR FINISH
DOWN
A B C
AE201
AE201
02.15
32.01 32.01
TYP.
32.01
32.01
03.01
03.01
32.02
26.01
R 1' - 0"
02.17
R 1' - 0"
EQ EQ
03.02
13.01
TYP.
32.01
32.05
AE401
M
IN
C
L E
A R
/4
GATE 1
/2
1' - 0" 1' - 0"
E Q
E Q
4' - 5"
1' - 0"
4' - 0"
1' - 3" 1' - 3" 9"
26.04
7' - 6" 16' - 0" 3' - 6"
/2
A B C
27' - 0"
5' - 6" 18' - 5" 3' - 1"
AE501
AE501
27' - 0"
165.00° 150.00°
R
R 1' - 0"
R 1' - 0"
R 1' - 0"
GATE 1
ALIGN CONCRETE
CURBS WITH FACE
OF EXISTING WALL
03.07
03.04
03.01
8' - 6" 10' - 0" 8' - 6"
CJ CJ
C J
CJ
03.06
C J
AREA OF WORK
A B C
09.03
02.32
09.05
GATE 1
09.04
13.01
TYP.
02.37
TYP.
02.37
26.03
1/8" = 1'-0"
LEVEL A PARTIAL CEILING NEW WORK
PLAN
1/4" = 1'-0"
LEVEL A ENLARGED PLAN GATE 1
1/4" = 1'-0"
LEVEL A ENLARGED PLAN GATE 1 -
SLAB DIMENSION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:3
A
M
AE102
ENLARGED PLANS UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
G E N E R A L N O T E S :
A. PROTECT METAL AND CONCRETE CURBS SHOWN TO REMAIN FROM ANY DAMAGE DURING NEW
WORK.
B. EXISTING ISLAND TO REMAIN. REPAIR CONCRETE AFTER DEMOLITION.
C. PATCH AND REPAIR ANY CONCRETE THAT WAS REMOVED DURING THE DEMOLITION PHASE.
D. ALL NEW CONCRETE TO HAVE fc = 4000 PSI YIELD STRENGTH.
E. ARROWS SHOWN ARE NEW PAINTED ARROWS PER SPECIFICATION 32 17 23.
F. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
K E Y P L A N :
NORTH NORTH
D R A W I N G N O T E S :
02.15 EXISTING CONCRETE CURB TO REMAIN
02.17 EXISTING TRENCH DRAIN TO REMAIN
02.32 EXISTING OVERHEAD COILING DOOR TO REMAIN
02.37 EXISTING BUILDING STRUCTURE TO REMAIN
03.01 NEW 6" REINFORCED CONCRETE SLAB FOR GUARD BOOTH
03.02 DASHED LINE INDICATES PATCH AREA AT REMOVED CONCRETE CURB TO MATCH EXISTING DRIVE WAY SURFACE WITH
NO EXPOSED REINFORCING
03.04 NEW 6" REINFORCED CONCRETE ISLAND - SEE DETAILS ON SHEET AE501
03.06 1/2" EXPANSION JOINT
03.07 CONTROL JOINT AT CENTER OF CONCRETE PAD. SEE DETAIL 7 ON AE501
09.03 EXISTING LINEAR METAL CEILING TO REMAIN. REMOVE AS REQUIRED FOR INSTALLATION OF GUARD BOOTH. RETURN TO
EXISTING CONDITION OR BETTER
09.04 PATCH AND REPLACE ACOUSTICAL CEILING TILE TO MATCH EXISTING. REPAIR ANY TILES DAMAGED DURING
CONSTRUCTION
09.05 PROVIDE TRANSITION FROM EXISTING CEILING TO NEW GUARD BOOTH. TYPICAL AT PERIMETER OF GUARD BOOTH
13.01 NEW PRE-FABRICATED GUARD BOOTH - SEE DETAIL ON AE401
26.01 PARKING GARAGE CARD READER/INTERCOM
26.03 SEE ELECTRICAL DRAWINGS FOR PROPOSED LIGHT FIXTURES
26.04 VEHICLE LOOP DETECTORS EMBEDDED IN CONCRETE - SEE ELECTRICAL DRAWINGS
32.01 PERMANENT BOLLARD - SEE DETAIL ON SHEET AE501
32.02 AUTOMATIC FOLDING ARM TRAFFIC BARRIER - SEE ELECTRIC DRAWINGS
32.05 REPAINT/REPLACE DIRECTIONAL ARROWS TO MATCH EXISTING. COLOR: WHITE
LEVEL A
C-1
EXIT
DOWN
AREA OF WORK
A B C
26.05
32.08
32.08
02.14
TYP.
32.01
TYP.
32.01
TYP.
32.01
TYP.
32.01
32.05
32.05
E Q
E Q 1' - 0"
GATE 3
03.03
03.03
02.33
TYP.
02.37
1' - 6" 1' - 6"
1' - 6" 1' - 6"
8' - 0"
CLCL CL
CL
CL
CL
CL
CL
CL
1' - 7"
CL
CL
1' - 6"
CL
CL
A B C
32.02
02.17
32.04
03.04
/8
3' - 0" 14' - 0"
8' - 6" 4' - 0" 6' - 0"
32.01
32.01
26.01
4' - 0" 4' - 6"
6' - 0"
32.02
32.05
32.05
GATE 2
32.07
32.07
4' - 0"
2' - 3"
03.03
03.03
5' - 6"
4' - 6" 9' - 0" 8' - 0"
02.33
TYP.
32.01
02.15
02.15
TYP.
02.37
03.02
CL CLCL
CL
CL
CL CL CL CL
CL
1' - 0"
CL
CL
A B C
/8
03.04
/8
GATE 2
27' - 0"
ALIGN CONCRETE CURB WITH
FACE OF EXISTING WALL
5' - 0"
5' - 0"
165.00°
165.00°
R 1' - 0"
R 1' - 0"
165.00°
165.00°
5' - 0" 17' - 0"
R 1' - 0"
R 1
5' - 0" 17' - 0"
TYP.
02.15
TYP.
02.15
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:3
A
M
AE103
ENLARGED PLANS UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
1/4" = 1'-0"
LEVEL A ENLARGED PLAN GATE 3
1/4" = 1'-0"
LEVEL A ENLARGED PLAN GATE 2
D R A W I N G N O T E S :
A. REFER TO SHEETS GI002-GI004 FOR PHASING PLANS.
B. REPLACE ANY CEILING PANELS THAT WERE DAMAGED DURING INSTALLATION OF GUARD BOOTH.
C. ALL NEW CONCRETE TO HAVE fc = 4000 PSI YIELD STRENGTH.
D. AREA SHADED IN GREY IS OUT OF ARCHITECTURAL SCOPE.
D R A W I N G N O T E S :
02.14 EXISTING CONCRETE CURB TO REMAIN - PATCH AND REPAIR ALL HOLES AND ROUGH AREAS FROM REMOVED
ELEMENTS.
02.15 EXISTING CONCRETE CURB TO REMAIN
02.17 EXISTING TRENCH DRAIN TO REMAIN
02.33 LINE OF EXISTING BRICK OPENING AND OVERHEAD DOOR ABOVE
02.37 EXISTING BUILDING STRUCTURE TO REMAIN
03.02 DASHED LINE INDICATES PATCH AREA AT REMOVED CONCRETE CURB TO MATCH EXISTING DRIVE WAY SURFACE WITH
NO EXPOSED REINFORCING
03.03 SAW CUT EXISTING STRUCTURALLY SUPPORTED CONCRETE SLAB IN PREPARATION FOR VEHICLE DETECTION LOOP -
SEE ELECTRICAL DRAWINGS AND MANUFACTURER FOR COORDINATION
03.04 NEW 6" REINFORCED CONCRETE ISLAND - SEE DETAILS ON SHEET AE501
26.01 PARKING GARAGE CARD READER/INTERCOM
26.05 PARKING GARAGE CARD READER/INTERCOM IN EXISTING LOCATION
32.01 PERMANENT BOLLARD - SEE DETAIL ON SHEET AE501
32.02 AUTOMATIC FOLDING ARM TRAFFIC BARRIER - SEE ELECTRIC DRAWINGS
32.04 REMOVABLE BOLLARD WITH SIGN FOR VA PARKING SPACE - SEE DETAIL ON SHEET AE501
32.05 REPAINT/REPLACE DIRECTIONAL ARROWS TO MATCH EXISTING. COLOR: WHITE
32.07 REMOVABLE BOLLARD - SEE DETAIL ON SHEET AE501
32.08 NEW VEHICLE GATE ARM - LOOP TO EXIT IN EXISTING LOCATION- SEE ELECTRICAL DRAWINGS
K E Y P L A N :
NORTH NORTH
LEVEL A
1/4" = 1'-0"
LEVEL A ENLARGED PLAN GATE 2 -
SLAB DIMENSION PLAN
ABC
26.01 32.02
32.01
32.01
03.01
3' - 6" 16' - 0" 7' - 6"
LEVEL A
100' - 0"
13.01
32.01
02.17
32.01
02.3202.35
09.05
09.04
02.42
02.34
7 8
11' - 0" 5' - 0"2' - 0"
32.01
32.02
26.01
03.01
2' - 5 1/2" +/- 8' - 0 1/2" 8"
LEVEL A
100' - 0"
13.01
03.04
32.01
02.15
02.42
02.41
1/2" = 1'-0"
GATE ISLAND SECTION ELEVATION
1/2" = 1'-0"
GATE ISLAND SECTION ELEVATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:3
A
M
AE201
EXTERIOR ELEVATION AND
SECTIONS
UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
G E N E R A L N O T E S :
A. REFER TO SHEETS GI002-GI004 FOR PHASING PLANS.
B. ALL NEW CONCRETE TO HAVE fc = 4000 PSI YIELD STRENGTH.
D R A W I N G N O T E S :
02.15 EXISTING CONCRETE CURB TO REMAIN
02.17 EXISTING TRENCH DRAIN TO REMAIN
02.32 EXISTING OVERHEAD COILING DOOR TO REMAIN
02.34 EXISTING BUILDING WALL TO REMAIN
02.35 EXISTING LINEAR METAL CEILING TO REMAIN
02.41 EXISTING CEILING TO REMAIN
02.42 EXISTING STRUCTURAL CONCRETE SLAB
03.01 NEW 6" REINFORCED CONCRETE SLAB FOR GUARD BOOTH
03.04 NEW 6" REINFORCED CONCRETE ISLAND - SEE DETAILS ON SHEET AE501
09.04 PATCH AND REPLACE ACOUSTICAL CEILING TILE TO MATCH EXISTING. REPAIR ANY TILES DAMAGED DURING
CONSTRUCTION
09.05 PROVIDE TRANSITION FROM EXISTING CEILING TO NEW GUARD BOOTH. TYPICAL AT PERIMETER OF GUARD BOOTH
13.01 NEW PRE-FABRICATED GUARD BOOTH - SEE DETAIL ON AE401
26.01 PARKING GARAGE CARD READER/INTERCOM
32.01 PERMANENT BOLLARD - SEE DETAIL ON SHEET AE501
32.02 AUTOMATIC FOLDING ARM TRAFFIC BARRIER - SEE ELECTRIC DRAWINGS
NORTH
DOWN
4' - 1" 11' - 11"
7' - 7 1/4"
16' - 0"
08.02
09.01
AE401
AE401
AE401 5
AE401
08.01
08.03
23.01
23.01
13.02
13.02
26.02
23.02
DOOR NUMBER: 001
1' - 3"
E Q
E Q
1/2" WEDGE ANCHOR (3-1/2" MIN.
EMBED). NUMBER OF ANCHORS
PROVIDED BY MANUFACTURER.
PROVIDE GASKETS BETWEEN
DISSIMILAR METALS.
3" X 3" X 1/4" ALUMINUM ANGLE
ANCHOR CLIP MECHANICALLY
FASTENED TO FRAME WITH (4) #12 X
1" TEK SCREWS
ALUM. TREADPLATE
INTERIOR
TEMPORARY GUARD
BOOTH WALL PANEL
SYSTEM BY GUARD
BOOTH MANUFACTURER
EXTERIOR
ALUM. TUBE FRAME
CONCRETE SLAB
DESIGN IS BASED ON A MINIMUM 6" DEEP, 4000 PSI MINIMUM (28 DAY ACI 318) REINFORCED.
THE FOUNDATION/ SLAB SHOULD BE A MINIMUM 12" WIDER THAN THE BUILDING FOOTPRINT
DIMENSIONS. THIS IS THE TO PROVIDE A 6" CONCRETE BORDER ON EACH SIDE OF BUILDING.
THIS DETAIL IS FOR REFERENCE PURPOSE ONLY - MAY VARY BASED ON
UNIT SELECTED BY THE CONTRACTOR. THE BUILDING(S) MUST BE SECURELY
ANCHORED IN PLACE AND MUST BE PROPERLY GROUNDED .
ADEQUATE SIZE ANCHOR BOLTS SHALL BE USED. THE SIZE AND DEPTH OF THOSE ANCHORS
SHOULD BE OF SUFFICIENT DESIGN TO WITHSTAND THE APPLICABLE WIND SPEED AND
SEISMIC LOADS FOR THE LOCATION OF INSTALLATION AND SOIL CONDITIONS.
ANCHORING OF SELECTED MANUFACTURER'S UNIT WILL BE REVIEWED BY VA'S ENGINEERING
CONSULTANT DURING SUBMITTAL REVIEW PHASE.
ANCHORS LOCATED PER PROJECT DRAWINGS
16' - 0"
08.03
23.01
13.03 13.04
3 1/8" 7' - 8"
F L
O O
R T
O O
C E
IL
IN
G
8' - 0"
TINTED FRONT WINDOW
23.01
/4
08.04
08.04
08.02
23.02
26.02
23.01
/2
/2
23.02 26.02
/4
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTS
FULLY SPRINKLERED
LEXINGTON
VAMC TROY
BOWLING
CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/L e x in g to n V
A
P a rk in g G a ra g e
L ig h ti n g
/A rc h it e c tu ra l
P a rk in g G a ra g e rv t
/8 /2
:0
:4
A
M
AE401
GUARD BOOTH DETAILS UPGRADE PARKING GARAGE
LIGHTING AND REPLACE PARKING
GARAGE GATES
1101 Veterans Dr, Lexington, KY 40502
596A4-19-106
1A
05/08/2024 PQ KT
1/2" = 1'-0"
GUARD BOOTH FLOOR PLAN
G E N E R A L N O T E S :
A. FACTORY SUPPLIED ITEMS, SHIPPED LOOSE FOR INSTALLATION ON SITE BY OTHER IN COMPLIANCE WITH ANY AND ALL APPLICABLE CODES: WATER CLOSET, LAVATORY WITH FAUCET, PAPER TOWEL DISPENSER, COAT HOOK, TOILET PAPER DISPENSER AND MIRROR.
B. FACTORY INSTALLED ITEMS INCLUDE: GRAB BARS.
C. WATER HEATER AND WASTE WATER, VENTING AND FRESH WATER SUPPLY ARE PROVIDED AND
INSTALLED BY CONTRACTOR.
D. PROVIDE SLIDING WINDOW AS SHOWN ON DRAWINGS.
E. DETAILS SHOWN ARE FOR BASIS OF DESIGN GUARD BOOTH. MODIFY AS REQUIRED FOR BOOTH
SELECTED BY CONTRACTOR.
F. ALL NEW CONCRETE TO HAVE fc = 4000 PSI YIELD STRENGTH.
G. THE GUARD BOOTH WILL BE REQUIRED TO BE ASSEMBLED ON SITE DUE TO LOW CEILING CLEARANCES.
H. GUARD BOOTH MUST BE ANCHORED TO CONCRETE SLAB.
I. ANCHORING WILL BE REVIEWED BY VA COR AND A/E DURING SUBMITTAL PHASE WITH SELECTED BOOTH /
MANUFACTURER.
J. SEAL AROUND ALL EXPOSED PIPE PENETRATIONS AND PLUMBING FIXTURES.
1 1/2" = 1'-0"
GUARD SHACK BOOTH DETAIL
1/2" = 1'-0"
GUARD BOOTH EAST ELEVATION
1/2" = 1'-0"
GUARD BOOTH NORTH ELEVATION
1/2" = 1'-0"
GUARD BOOTH WEST ELEVATION
1/2" = 1'-0"
GUARD BOOTH SOUTH ELEVATION
PERMANENT PARKING BOOTH Contact:
Luis Fajardo Sales Account Manager
(800) 636-3873x269 lfajardo@panelbuilt.com
8'-0"X16'-0" MODULAR SITE BUILT BALLISTIC LEVEL 3 BOOTH
ITEM
Counter
Exterior Door
Exterior Door Core lockset
Interior Door
Interior Door lockset
SUPPLIER BASIS OF DESIGNINSTALLER
Booth Supplier Booth Installer Booth Standard
Water Closet
Lavatory with Faucet
Paper Towel Dispenser
Mirror
Coat Hook
Water Heater
Waste/Plumbing/Water supply
Heat Pump
Light Fixtures
Misc. Items
Vehicle Counter
Vehicle Intercom
Parking Gate
Electric Panels, transformers
Access Control - PACS
Booth Supplier Booth Installer Booth Standard
General Contractor Booth Installer See Door Hardware Specification.
Booth Supplier Booth Installer Booth Standard Privacy Lockset
Booth Supplier Booth Installer See fixture P-101 see PL501
Booth Supplier Booth Installer See fixture P-414 see PL501
VA Booth Installer
Booth Supplier Booth Installer Booth Standard
Booth Supplier Booth Installer Booth Standard
Plumbing Contractor Plumbing Contractor Electric Tankless Waterheater see PL501
Plumbing Contractor Plumbing Contractor See PL 101/ PL 501
Booth Supplier Booth Installer
Electrical Contractor Electrical Contractor
Type A series: Fail Safe - wet location, vandal resistant 2x2 LED troffer. 4000k, #12 0.125
Engineered Parking Systems: capacity counter. Counters up to 16 lanes, 32,500 spaces. Display indicates number of remaining spaces.
Aiphone - Multi - station video intercom with gate release button and two-way audio communication.
Magnetic Gate Openers - automatic parking gate with articulated arm.
Square D, Schneider Electric
Sole Source - Istar, Tyco Software House
Electrical Contractor Electrical Contractor
Electrical Contractor Electrical Contractor
General Contractor General & electrical Contractor
Electrical Contractor Electrical Contractor
Electrical Contractor Electrical Contractor
Barrier Gate
Card Reader Pedestal General Contractor
General Contractor
General Contractor
General Contractor Basis of Design Engineered Parking Stems 301-16
Basis of Design 306-6T
Booth Supplier Booth Installer Booth Standard
Toilet Paper VA Booth Installer
Soap Dispenser VA Booth Installer
D R A W I N G N O T E S :
08.01 SLIDING ENTRY DOOR TO PROVIDE 32" CLEAR DOOR OPENING AND INCLUDES: HOOK BOLT LOCKSET, TOP SUSPENDED CARRIES ON I-BEAM TRACK, FIXED GLASS IN UPPER PORTION OF DOOR AND WEATHER STRIPPING
08.02 8 PIN SWING PRIVACY DOOR WITH LEVER HANDLE PRIVACY LOCKSET, GEARED ALUMINUM CONTINUOUS HINGE. PROVIDE
32" CLEAR SWING
08.03 INSIDE…
This is the start of the file's text. The full file is on GovTribe.