Pricing Schedule.xlsx
XLSX spreadsheet 61 KB Posted
- Attached to
- Y1DA--Project # 596A4-19-106 - Construction to Upgrade Parking Garage Lighting/Replace Parking Garage Gates
- Solicitation number
- 36C24924R0079
About this file
This document appears to be a pricing schedule template for a federal contract opportunity. The key details are:
The federal contract opportunity is Solicitation Number 36C24924R0079, titled "Y1DA--Project # 596A4-19-106 - Construction to Upgrade Parking Garage Lighting/Replace Parking Garage Gates". It is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The pricing schedule template includes detailed line items for various construction divisions such as general requirements, concrete, openings, HVAC, electrical, and communications. Contractors are required to provide full pricing breakdowns for labor, materials, equipment, and totals for each division, as well as overhead, profit, bond/fees, and the grand total. The proposal is due on 9/6/24.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in.pdf | ||
| Solicitation Questions and Answers.pdf | ||
| 36C24924R0079 0001.docx | DOCX document | |
| Project Specifications.pdf | ||
| 36C24924R0079_1.docx | DOCX document | |
| DBA Wage Determination KY20240090 7-26-2024.pdf | ||
| Final Statement of Work.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Project Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24924R0079 | 596A4-19-106 | Upgrade Parking Garage Lighting/Gates | 9/6/24 |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 32 16.15 | Project Schedules | |
| 01 33 23 | Shop Drawings, Prdt Data, Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 29 | Testing Laboratory Services | |
| 01 57 19 | Temporary Environment Controls | |
| 01 58 16 | Temporary Interior Signage | |
| 01 74 19 | Cosntruction Waste Management | |
| 01 81 13 | Sustainable Construction Requirements | |
| 01 91 00 | General Commissioning Requirements | |
| DIVISION 2 | Existing Conditions | $0.00 |
| 02 41 00 | Demolition | |
| 02 82 11 | Traditional Asbestos Abatement | |
| DIVISION 3 | CONCRETE | $0.00 |
| 03 30 53 | Cast in Place Concrete | |
| DIVISION 4 | MASONRY | |
| DIVISION 5 | Metals | $0.00 |
| 05 50 00 | Metal Fabrications | |
| DIVISION 6 | Wood, plastics and Composites | $0.00 |
| 06 10 00 | Rough Carpentry | |
| 06 20 00 | Finish Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 01 50.19 | Preparation fro Reroofing | |
| 07 60 00 | Flashing and Sheet Metal | |
| 07 71 00 | Roof Specialties | |
| 07 72 00 | Roof Accessories | |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants | |
| 07 95 13 | Expansion Joint Cover Assemblies | |
| DIVISION 8 | Openings | $0.00 |
| 08 11 13 | Hollow Metal Doors & Frames | |
| 08 14 00 | Interior Wood Doors | |
| 08 31 13 | Access Doors and Frames | |
| 08 41 13 | Alum Framed Entrance and Storefronts | |
| 08 56 19 | Pass Windows (2 each) | |
| 08 71 00 | Door Hardware | |
| 08 80 00 | Glazing | |
| 08 90 00 | Louvers and Vents | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 05 16 | Subsurface Prep for Floor Finishing | |
| 09 06 00 | Schedule for Finishes | |
| 09 22 16 | Non Struct Metal Framing | |
| 09 29 00 | Gypsum Board | |
| 09 51 00 | Acuoutical Ceiling | |
| 09 65 13 | Resilient Base and Accessories | |
| 09 68 00 | Resilient Tile Flooring | |
| 09 69 00 | Access Flooring | |
| 09 91 00 | Painting | |
| DIVISION 10 | Specialties | $0.00 |
| 10 11 13 | Chalkboards and Markerboards | |
| 10 1123 | Tackboards | |
| 10 14 00 | Signage | |
| 10 21 13 | Toilet Compartments | |
| 10 26 00 | Wall and Door protection | |
| 10 28 00 | Toilet, Bath, and Laundry Accessories | |
| 10 44 13 | Fire Extinguisher Cabinets | |
| DIVISION 11 | EQUIPMENT | $0.00 |
| 11 41 21 | Walk-in Coolers and Freezers | |
| 11 53 53 | Biological Safety Cabinets Laminar Airflow Stations | |
| DIVISION 12 | Furnishings | $0.00 |
| 12 24 00 | Window Shades | |
| 12 24 21 | Lightproof Shades | |
| 12 31 00 | Manufactured Metal Casework | |
| 12 32 00 | Manufactured Wood Casework | |
| 12 36 00 | Countertops | |
| DIVISION 13 | Special Construction | $0.00 |
| 13 05 41 | Seismic Restraint Requirements for Non- Structural Components | |
| DIVISION 21 | Fire Suppression | $0.00 |
| 21 08 00 | Commissioning of Fire Suppression System | |
| 21 13 13 | Wet-Pipe Sprinkler Systems | |
| DIVISION 22 | Plumbing | $0.00 |
| 22 05 11 | Common Work Results for Plumbing | |
| 22 05 19 | Meters and Gages for Plumbing piping | |
| 22 05 23 | General-Duty Valves for Plumbing Piping | |
| 22 07 11 | Plumbing Insulation | |
| 22 08 00 | Commissioning of Plumbing Systems | |
| 22 11 00 | Facility Water Distribution | |
| 22 13 00 | Facility Sanitary and Vent Piping | |
| 22 14 00 | Facility Storm Drainage | |
| 22 40 00 | Plumbing Fixtures | |
| 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | |
| 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | |
| DIVISION 23 | Heating, Ventilating and Air Conditioning HVAC | $0.00 |
| 23 05 11 | Testing, Adjusting and Balancing for HVAC | |
| 23 05 12 | General Motor Requriments for HVAC and Steam Generation Equipment | |
| 23 05 41 | Noise and Vibration Control for HVAC piping and Equipment | |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | |
| 23 07 11 | HVAC and Boiler Plant Insulation | |
| 23 08 00 | Commissioning of HVAC Systems | |
| 23 09 23 | Direct Digital Control System for HVAC | |
| 23 21 13 | Hydronic Piping | |
| 23 21 23 | Hydronic Pumps | |
| 23 22 13 | Steam and Condensate Heating Piping | |
| 23 25 00 | HVAC Water Treatment | |
| 23 31 00 | HVAC Ducts and Casing | |
| 23 34 00 | HVAC Fans | |
| 23 36 00 | Air Terminal Units | |
| 23 37 00 | Air Outlets and Inlets | |
| 23 40 00 | HVAC Air Cleaning Devices | |
| 23 74 13 | Packaged, Outdoor, Central Stating Air Handling Units | |
| 23 81 00 | Decentralized Unitary HVAC Equipment | |
| 23 81 23 | Computer Room Air Conditioners | |
| 23 82 00 | Convection Heating and Cooling Units | |
| 23 82 16 | Air Coils | |
| 23 84 00 | Humidity Control Equipment | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirements for Electrical Installations | |
| 26 05 13 | Medium Voltage Cables | |
| 26 05 19 | Low Voltage Eelctrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | |
| 26 05 36 | Wireways for Radiology Equipment | |
| 26 05 73 | Overcurrent Protective Device Coordination Study | |
| 26 08 00 | Commissioning of Electrical Systems | |
| 26 09 23 | Lighting Controls | |
| 26 13 13 | Medium Voltage Circuit Breaker Switchgear | |
| 26 13 16 | Medium Voltage Fusible Interrupter Switches | |
| 26 20 11 | Isolated Power Systems | |
| 26 22 00 | Low Voltage Transformers | |
| 26 23 00 | Low Voltage Switchgear | |
| 26 24 13 | Distribution Switchboards | |
| 26 24 16 | Panelboards | |
| 26 24 19 | Motor Control Centers | |
| 26 25 11 | Busways | |
| 26 26 00 | Power Distribution units for Static Unterruptible Power Systems | |
| 26 27 26 | Wiring Devices | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | |
| 26 33 53 | Static Unnterruptible Power Supply | |
| 26 35 26 | Harmonic Filters | |
| 26 36 23 | Automatic Transfer Switches | |
| 26 41 00 | Facility Lightning Protection | |
| 26 43 13 | Surge Protective Devices | |
| 26 51 00 | Interior lighting | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 26 | Grounding and Bonding for Communications Systems | |
| 27 05 33 | Raceways and Boxes for Communication Systems | |
| 27 05 61 | Leased Space, Communication Equipment and Systems | |
| 27 08 00 | Commissioning of Communication Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 41 31 | Master Antenna Television Equipment and Systems | |
| 27 51 16 | Public Address and Mass Notification Systems | |
| 27 51 23 | Intercommunications and Program Systems | |
| 27 52 23 | Nurse Call and Code Blue Systems | |
| 27 52 41 | Miscellaneous Medical Systems | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 |
| 28 05 00 | Common Work Results for Electronic Safety and Security | |
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | |
| 28 05 26 | Grounding and Bonding for Electronic Safety and Security | |
| 28 05 28.33 | Conduits and backboxes for Electonic Safety and Security | |
| 28 08 00 | Commissioning of Electronic Safety and Security Systems | |
| 28 13 00 | Physical Access Control System | |
| 28 13 16 | Physical Access Control Ssytem and Database Management | |
| 28 13 53 | Security Access Detection | |
| 28 16 00 | Intrusion Detection System | |
| 28 23 00 | Video Survelliance | |
| 28 26 00 | Electronic Personal Protection System | |
| 28 31 00 | Fire Detection and Alarm | |
| 28 52 31 | Emergency Call System |
| TOTALS | ||||
| $0.00 | ||||
| TOTAL LABOR | ||||
| $0.00 | ||||
| TOTAL MATERIALS | ||||
| 6% | $0.00 | |||
| TAX FOR MATERIALS | ||||
| $0.00 | ||||
| TOTAL EQUIPMENT | ||||
| DIVISION GRAND TOTALS | $0.00 |
| $0 | INSTRUCTIONS | |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; | |
| SUBTOTAL | $0 |
| OVERHEAD | 8% | $0 | |
| PROFIT | 8% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| $0 | |
| SUBTOTAL |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9
File details come from the government source that posted it. Updated .