About this file

This is a set of project drawings for an electrical service upgrade at English Building, Georgia Southwestern State University (GSW) in Americus, Georgia, prepared by NBP Engineers, Inc. The project involves replacing the main electrical service infrastructure, including installing a new 600-ampere, 480Y/277-volt, three-phase main service panel; replacing an existing 800-ampere, 208Y/120-volt distribution panel (Panel DP) with a new 800-ampere, 208Y/120-volt panel; and upgrading multiple secondary panels and load centers throughout the first and second floors of the building. The scope includes providing new feeder conductors and conduits from an exterior 480-volt service connection, establishing new grounding systems with three ground rods spaced a minimum of 10 feet apart, removing the existing 150-kilovolt-ampere buck-boost transformer serving the elevator and connecting the elevator directly to the new 480-volt service via a new 100-ampere, three-pole circuit breaker, and replacing a 225-kilovolt-ampere dry-type transformer. Additional work involves relocating the existing telephone cabinet to accommodate the new panel placement, with an estimated allowance of $10,000 for this relocation, and coordinating with the GSW IT Department. All electrical service disruptions must be scheduled during weekends or school breaks with two weeks' notice to the university.

The drawings indicate that the contractor must field-verify all existing conditions shown on the plans, as the existing conditions are based on information available at the time of design. Multiple existing branch circuits require reconnection to new panels, with feeder conductors to be replaced throughout the building. New conduit routing below grade connects to the site, and new pullboxes and wireways must be installed above accessible ceilings to accommodate the larger feeder sizes. The contractor must locate all existing utilities and coordinate with the utility protection center using the One Call system, with hand digging required around known utilities. Panelboard replacements include Panel A (208Y/120-volt), Panel A2 (240Y/120-volt loadcenter), Panel A3 (240/120-volt loadcenter), Panel B (208Y/120-volt), Panel C (208Y/120-volt, two-section custom enclosure), Panel D (208Y/120-volt), and Panel X (30-ampere panel). The design documents note that contractor verification of existing breaker sizes is required prior to ordering new equipment, and modification of existing concrete masonry unit walls may be necessary to accommodate larger panel openings. The project is documented as 100 percent construction documents dated January 11, 2023.

Text of this file

316 CORPORATE PARKWAY MACON, GEORGIA

NBP ENGINEERS, INC.

CONSULTANTS

Americus, Georgia

TITLESHEET NO.

E1.0

E0.1

NBP PROJECT No. 22105

INDEX OF

DRAWINGS

E1.1

Georgia Southwestern State University

LEGEND, SCHEDULE, RISER, & DETAILS - ELECTRICAL

FIRST FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL

E1.2 SECOND FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL

SITE PLAN - ELECTRICAL

E2.1 PANELBOARD SCHEDULES - ELECTRICAL

E2.2 PANELBOARD SCHEDULES - ELECTRICAL

GSW 17-01-23 English Building - Electrical Service Upgrade

SEAL

SCALE:

FILE PATH:

P:\22105\22105e01.dgn

DATE PLOTTED

DGN FILE

11-JAN-2023

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22105\22105e01.dgn

01.11.2023

AS SHOWN

TWT

BCO

TWT

22105

A m e ri c u s

G e o rg ia

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e

G S

W

-0

-2

C O

N S T

R U

C T

IO

N

D

C U

M E

N T S

E0.1

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

ELECTRICAL

RISER, & DETAILS -

LEGEND, SCHEDULE,

EXISTING POWER RISER

NOT TO SCALE

WP

F

JJ J

RECEPTACLES

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

WEATHER PROOF OUTLET

CIRCUITS

ONE CROSSMARK PER WIRE

(3 WIRE UNLESS SHOWN)

RACEWAY CONCEALED IN CEILING OR WALL

RACEWAY IN GROUND, SLAB, OR UNDER FLOOR

HOMERUN- ONE ARROW PER CIRCUIT

CONNECTION TO EQUIPMENT

CAP

CONDUIT DOWN

FLEXIBLE RACEWAY

RACEWAY EXPOSED

CONDUIT UP

GENERAL EQUIPMENT

PANELBOARD-250 VAC OR LESS

SURFACE MOUNTED

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS ENCLOSED BREAKER-RECESSED IN WALL

ENCLOSED CIRCUIT BREAKER

COMBINATION STARTER AND DISCONNECT

JUNCTION BOX - WALL/CEILING/FLOOR

SURGE SUPPRESSOR

ELECTRICAL LEGEND

OVERHEAD CONDUITS/CONDUCTORS.

UNDERGROUND FEEDER CONDUITS SHALL BE REPLACED WITH

CONDUITS IF THOSE CONDUITS ARE OVERHEAD. ANY EXISTING

SCHEDULES. PROVIDE NEW FEEDER CONDUCTORS IN EXISTING

REPLACE EXISTING PANEL IN PLACE. SEE NOTES ON PANEL

CONDUCTORS. RECONNECT ALL EXISTING BRANCH CIRCUITS.

THREE PHASE PANELBOARD. PROVIDE NEW FEEDER CONDUIT/

REPLACE EXISTING SINGLE PHASE LOADCENTER WITH NEW

PANEL IS EXISTING TO REMAIN.

LOCATION.

EXISTING FEEDERS NOT BEING REPLACED TO THE NEW PANEL

IN THE SAME LOCATION AS EXISTING PANEL DP. EXTEND ANY

IS TO MOUNT THE NEW 600 AMP. 480Y/277 VOLT PANEL "MAIN"

SEE NOTES ABOVE RELOCATING TELEPHONE PANEL. THE INTENT

(APPROXIMATELY 6 FEET TO THE LEFT OF THE SAME WALL).

WHERE THE EXISTING TELEPHONE CABINET IS LOCATED

REPLACED. THE NEW LOCATION FOR THIS PANEL SHALL BE

EXISTING 800A DISTRIBUTION PANELBOARD DP SHALL BE

ELEVATOR. EXTEND FEEDER CONDUCTORS AS REQUIRED.

BREAKER IN THE NEW 600A SERVICE PANEL "MAIN" TO FEED THE

DRY TYPE TRANSFORMER. THERE WILL BE A NEW 100A/3P CIRCUIT

480 VOLT SERVICE TO THE ELEVATOR. REMOVE THIS EXISTING

THE EXISTING 150KVA BUCK BOOST TRANSFORMER PROVIDES

ACTUALLY THROUGH THE DISTRIBUTION PANEL DP.

NOTE THAT THE EXISTING ROUTE FOR THESE CONDUCTORS IS

RECONNECT ALL EXISTING BRANCH CIRCUITS.

RISER REGARDING ANY EXISTING UNDERGROUND PANEL FEEDERS.

PROVIDE NEW FEEDER CONDUCTORS. SEE NOTES ON EXISTING

NEW PANEL TO REPLACE EXISTING PANEL IN SAME LOCATION.

1#4G, 2•"C). RECONNECT ALL EXISTING BRANCH CIRCUITS.

PROVIDE NEW FEEDER CONDUCTORS AND CONDUIT (4#4/0 AWG COPPER,

NEW PANEL TO REPLACE EXISTING LOADCENTER IN SAME LOCATION.

PROVIDE NEW 2 SETS 4#600 KCMIL, 1#3/0 G, 4"C.

PROVIDE NEW CONCRETE HOUSEKEEPING PAD.

BY NOTE 7.

AS REQUIRED TO THE NEW PANEL DP LOCATION. USE NEW WIREWAY SHOWN

FROM EXISTING PANEL DP THAT ARE TO BE RE-FED SHALL BE EXTENDED

DISTRIBUTION PANEL DP IS CURRENTLY LOCATED. ALL EXISTING CIRCUITS

PANEL IS TO BE PLACED WHERE THE EXISTING 800 AMP, 208Y/120 VOLT

NEW 600 AMP, 480Y/277V, 3 PHASE, 4 WIRE PANEL "MAIN". NOTE THIS

EXISTING CIRCUITS FROM PANEL DP THAT ARE NOT BEING REPLACED.

PROVIDE NEW WIRING THROUGH SIZED PER NEC TO SPLICE/EXTEND AND

GROUNDS.

INSULATED GROUND CONDUCTOR. CONDUITS SHALL NOT BE USED AS

ALL FEEDER CONDUCTORS BEING REPLACED SHALL HAVE A DEDICATED, A

T

XFMR

225KVA

30A

PANEL X

60A

PANEL B

PANEL DP

800A

3 PHASE

208Y/120V

PANEL DP

SVC. DISC.

400A/3P

480Y/277V

480Y/277 VOLT

AT BUSINESS HISTORY

PADMOUNT XFMR

EXISTING

PANEL A

60A

A3

LOADCENTER

T

DP

PANEL

ELEV. FEED

DISCONNECT

100A FUSED

EXISTING 480V

PANEL DP

225A

PANEL A

PANEL DP

LOADCENTER A2

PANEL

CLASSROOM 113

MAIN MECH ROOM CLASSROOM

FIRST FLOOR

SECOND FLOOR

PANEL MP

PANEL DP

225A

2 SECTIONS

PANEL C

PANEL DP

60A

PANEL D

F

NOT TO SCALE

T

480Y/277 VOLT

AT BUSINESS HISTORY

PADMOUNT XFMR

EXISTING

MAIN MECH ROOM CLASSROOM

FIRST FLOOR

SECOND FLOOR

PANEL DP PANEL DP

225A

2 SECTIONS

NEW PANEL C

60A

NEW PANEL D

1 8

PANEL DP PANEL DP

PANEL

CLASSROOM 113

EXISTING

PANEL MP

EXISTING

PANEL DP

225A

PANEL A2

NEW

PANEL DP

225A

PANEL A

NEW

60A

A3

LOADCENTER

NEW

60A

PANEL B

NEW

1 8

XFMR

225KVA

NEW

PANEL DP

NEW

#3/0 AWG COPPER

30A

PANEL X

NEW

480Y/277V

PANEL MAIN

NEW 600A

FROM EXTERIOR

480V SERVICE

NEW 600A,

NEW WIREWAY 7

F

DISCONNECT"

BLDG. MAIN SERVICE

LABEL AS "ENGLISH

FUSED DISCONNECT

S.E. RATED

NEW 600AMP NEMA 3R

#4/0 AWG COPPER.

APART. CONNECT WITH

RODS SPACED MIN. 10FT

WITH THREE 10FT GROUND

NEW GROUNDING TRIAD

TO NEW 600A PANEL MAIN

1#1/0 AWG GROUND, 3"C

4#350 KCMIL,

NEW 2 SETS

2 SETS 4#350 KCMIL COPPER

NEW POWER RISER

NOTES:(DETAIL 2/E0.1 ONLY) NOTES:(DETAIL 1/E0.1 ONLY)

GENERAL NOTES:(DETAIL 2/E0.1 ONLY)

ON PANEL SCHEDULE.

THIS PANEL SHALL HAVE AN INTEGRAL 60 AMP CONTACTOR. SEE NOTES

NEW 5#10 AWG, ƒ"C.

RECONNECT ALL EXISTING BRANCH CIRCUITS.

CIRCUITS.

PROVIDE NEW FEEDER CONDUCTORS. RECONNECT ALL EXISTING BRANCH

NEW LOADCENTER TO REPLACE EXISTING LOADCENTER IN SAME LOCATION.

CONNECTION TO PANEL BAS.

PANEL OR EXTERNAL. PROVIDE CIRCUIT BREAKER AS REQUIRED FOR

PROVIDE NEW SURGE PROTECTIVE DEVICE (SPD). PROVIDE INTEGRAL TO

NOTES 5 AND 7.

NEW 800 AMP, 208Y/120 VOLT, 3 PHASE, 4 WIRE PANEL "DP". REFER TO

P E

R

IM

E T

E R

R

A D

DN

DN

ENGLISH BUILDING

FFE = 380.93

& POLITICAL SCIENCE BUILDING

BUSINESS, HISTORY

(ACES)

ACADEMIC SKILLS CENTER

UP

UGE

STORM INLET

MANHOLE

SANITARY

INLET

STORM

"G

"S

"G

MANHOLE

STORM

2"G

U G E

STORM INLET

UGE

MANHOLE #4

PIPE UP

TREE

PECAN

ANCHOR

BRICK RETAINING WALL

"S

UGE

INV @ 374

CONCRETE SIDEWALK

IN THIS AREA. REFER TO 32 8423

IRRIGATION PIPING EXISTS

CAUTION HIGH VOLTAGE

30"s 30"s

30"s

AT LOW POINTS

PROVIDE DRAIN

HEAT PUMPS

EXISTING

GENERATOR

GAS

FUSED DISCONNECT

EXISTING 600A/3P/3R

"C

H R

"C

H S

4"CHS

CHR-ENG-1B

CHR-ENG-1A

EXISTING DISCONNECT

TO MECH ROOM

COOLED CHILLER

EXISTING AIR

"C

H S

"C

H R

TV

CABLE

TO MH-19

MANHOLE #18

ELECTRICAL

MANHOLE #17

ELECTRICAL

PULLBOX

SN

INV @ 372.0

TOP @ 380.0

MAN HOLE#1

SN

S

T

K V

A

U G

E

U G E

S/T-7

XFMR

INV @ 371.35

TOP @ 379.0

SEAL

SCALE:

FILE PATH:

P:\22105\22105e10.dgn

DATE PLOTTED

DGN FILE

11-JAN-2023

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22105\22105e10.dgn

01.11.2023

AS SHOWN

TWT

BCO

TWT

22105

A m e ri c u s

G e o rg ia

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e

G S

W

-0

-2

N S T

R U

C T

C U

M E

N T S

N

SCALE: 1 = 20'-0

20 0 10 20 40

SITE PLAN - ELECTRICAL

NOTES:(THIS SHEET ONLY)

E1.0

ELECTRICAL

SITE PLAN -

NEW CONDUITS UP HERE

NEW PANEL MAIN

ABOVE ACC. CEILING

NEW PULLBOX AS NEEDED

RISER FOR SIZE.

NEW ROUTE FOR 600 AMP, 480Y/277, 3 PHASE FEEDER TO NEW PANEL MAIN. SEE

SIMILAR MATERIALS.

SAW CONDUIT EXISTING CONCRETE IN STRAIGHT, PARALLEL LINES. PATCH BACK WITH 2

3 CONDUITS/CONDUCTORS ABOVE ACCESSIBLE CEILING.

ENGLISH BUILDING.

EXISTING PADMOUNTED TRANSFORMER THAT SERVES BOTH BUSINESS HISTORY AND

GENERAL NOTES:(THIS SHEET ONLY)

UTILITIES.

THE UTILITY PROTECTION CENTER ONE CALL NUMBER. HAND DIG AROUND ANY KNOWN

THE TIME OF DESIGN. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES. CONTACT

EXISTING UTILITIES SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE AT A

B

C

SCHEDULED SCHOOL BREAK.

ANY ELECTRICAL SERVICE DISRUPTIONS SHALL BE ON WEEKENDS OR OVER A

NOTIFY THE OWNER TWO WEEKS PRIOR TO ANY PLANED OUTAGES.

COORDINATE ALL OUTAGES WITH GEORGIA SOUTHWESTERN STATE UNIVERSITY.

BUSINESS HISTORY BUILDING.

PROVIDE NEW 600A/3P/3R FUSED DISCONNECT MOUNTED ON EXTERIOR WALL OF

FILE PATH:

P:\22105\22105e11.dgn

DATE PLOTTED

DGN FILE

11-JAN-2023

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22105\22105e11.dgn

01.11.2023

AS SHOWN

TWT

BCO

TWT

22105

A m e ri c u s

G e o rg ia

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e

G S

W

-0

-2

N S T

R U

C T

C U

M E

N T S

1 2 3 4 5 6 7 8 9

A

B

C

D

E

MECH RM

ELEVATOR

ELEV EQUIP

1 2

A

SCALE:

= 1'-0

8 0 4 8 16

E1.1

N

PANEL B PANEL DP

PANEL A

PANEL MP

CONTROL PANEL

FIRE ALARM

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

F A

C P

FIRST FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL

ELECTRICAL

DEMO/NEW WORK -

FIRST FLOOR PLAN -

PANEL A2

PANEL A3T

T

GENERAL NOTES:(THIS SHEET ONLY)

OF THIS PROJECT. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.

PANELBOARDS, TRANSFORMERS, AND LOAD CENTERS TO BE REPLACED AS PART

AT THE TIME OF DESIGN. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

EXISTING CONDITIONS SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE A

NOTES:(THIS SHEET ONLY)

BREAKER

ENCLOSED

400A/3P

6 7

CLASSROOM

TRANSFORMER TO MAINTAIN ALL REQUIRED NEC CLEARANCES. PROVIDE CONCRETE PAD.

EXISTING 225 KVA DRY TYPE TRANSFORMER SHALL BE REPLACED IN PLACE. MOUNT NEW

NOTES:(THIS SHEET ONLY)

THIS PANEL SHALL BE REPLACED IN PLACE. SEE PANEL SCHEDULES.

EXISTING PANEL X IS LOCATED ON THE WALL ABOVE THE DRY TYPE TRANSFORMER.

MAY BE REUSED.

THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUIT

EXISTING 208Y/120 VOLT PANEL A SHALL BE REPLACED IN PLACE. REFER TO NOTES ON 3

MAY BE REUSED.

ON THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUIT

EXISTING 240/120 VOLT LOADCENTER A3 SHALL BE REPLACED IN PLACE. REFER TO NOTES 5

MAY BE REUSED.

THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUIT

EXISTING 208Y/120 VOLT PANEL B SHALL BE REPLACED IN PLACE. REFER TO NOTES ON 6

NEW PANEL MAIN.

SHALL BE REMOVED. EXTEND THE EXISTING 480 VOLT, 3 PHASE ELEVATOR FEEDER TO

THIS EXISTING 150 KVA DRY TYPE BUCK BOOST TRANSFORMER SERVING THE ELEVATOR

CONDUCTORS AND CONDUIT.

PHASE PANEL A2. REFER TO NOTES ON THE PANEL SCHEDULES. REPLACE EXISTING FEEDER

EXISTING 240Y/120 VOLT LOADCENTER A2 SHALL BE REPLACED IN PLACE WITH NEW THREE

EXISTING PANEL SHALL REMAIN IN PLACE.

EXISTING CONDUITS AS REQUIRED TO ACCOMMODATE NEW PANEL DP.

CONTRACTOR SHALL PROVIDE AN ALLOWANCE OF $10,000 TO RELOCATE THE CABLE AND

AMP, 208Y/120 VOLT DISTRIBUTION PANEL DP. COORDINATE WITH GSW IT DEPARTMENT.

EXISTING TELEPHONE CABINET SHALL BE RELOCATED IN ORDER TO ACCOMMODATE NEW 800

11 NEW SITE CONDUIT ROUTING BELOW GRADE. REFER TO SITE PLAN.

WITH COVER FOR EACH PENETRATION.

PENETRATE WALL ABOVE CEILING IN STORAGE CLOSET AND ROUTE APPROXIMATELY AS SHOWN. USE LB

NEW CONDUITS FROM SITE SHALL RISE UP EXTERIOR WALL IN LOCATION SHOWN. CONDUITS SHALL

13 PROVIDE NEW PULLBOX SIZED PER NEC ABOVE ACCESSIBLE CEILING.

14 ABOVE ACCESSIBLE CEILING IN CLASS ROOM.

TO ALLOW FOR SPLICING AND RECONNECTION OF NEW FEEDERS.

WIREWAY (SIZED PER NEC) THE FULL LENGTH ABOVE NEW PANEL MAIN AND NEW PANEL DP

AMP, 208Y/120 VOLT, 3 PHASE PANEL DP IS LOCATED. EE SITE PLAN. PROVIDE NEW, LARGE

NEW 480Y/277 VOLT, 3 PHASE, 4 WIRE PANEL MAIN SHALL BE LOCATED WHERE EXISTING 800

FILE PATH:

P:\22105\22105e12.dgn

DATE PLOTTED

DGN FILE

11-JAN-2023

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22105\22105e12.dgn

01.11.2023

AS SHOWN

TWT

BCO

TWT

22105

A m e ri c u s

G e o rg ia

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e

G S

W

-0

-2

N S T

R U

C T

C U

M E

N T S

1 2 3 4 5 6 7 8 9

A

B

D

E

SLOPE

E X

IS

T

IN

G

W A

L L

N S

T R

U C

T

IO

N

T

Y P

ELEVATOR

EXIST HALL

1 2

A

SCALE:

= 1'-0

8 0 4 8 16

E1.2

N

PANEL D

PANEL C

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

SECOND FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL

ELECTRICAL

DEMO/NEW WORK -

SECOND FLOOR PLAN -

GENERAL NOTES:(THIS SHEET ONLY)

OF THIS PROJECT. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.

PANELBOARDS, TRANSFORMERS, AND LOAD CENTERS TO BE REPLACED AS PART

AT THE TIME OF DESIGN. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

EXISTING CONDITIONS SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE A

NOTES:(THIS SHEET ONLY)

MAYBE REUSED.

THE PANEL SCHEDULE. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUITS

EXISTING 208Y/120 VOLT PANEL D SHALL BE REPLACED IN PLACE. REFER TO NOTES ON

TO MATCH SURROUNDINGS.

ACCOMMODATE THE NEW FLUSH MOUNT PANELS. PATCH CMU AS NECESSARY AND RE-PAINT

CONDUIT MAYBE REUSED. CONTRACTOR SHALL MODIFY EXISTING CMU WALL AS REQUIRED TO

NOTES ON THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER

EXISTING 2 SECTION PANEL C (208Y/120 VOLT) SHALL BE REPLACED IN PLACE. REFER TO

FILE PATH:

P:\22105\22105e21.dgn

DATE PLOTTED

DGN FILE

11-JAN-2023

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22105\22105e21.dgn

01.11.2023

AS SHOWN

TWT

BCO

TWT

22105

A m e ri c u s

G e o rg ia

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e

G S

W

-0

-2

N S T

R U

C T

C U

M E

N T S

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

SINGLE PHASE SINGLE PHASE

CKT

PANEL

PROVIDE NEW SERVICE ENTRANCE CONDUITS/CONDUCTORS.

REMOVE THE EXISTING 150 KVA DRY TYPE BUCK BOOST TRANSFORMER SERVING THE ELEVATOR. CONNECT 480 VOLT, 3 PHASE FEED DIRECTLY.

PANEL SHALL BE SERVICE ENTRANCE RATED.

NOTES

Minimum KAIC:

CKT

TRIP

1#2G

3#600

WIRE

4"

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

SPACE

SPACE

FUTURE 30 KVA XFMR

TYPE XFMR

VIA NEW 225 DRY

PANEL DP

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

EXISTING 750 KVA PADMOUNT

LOCATION:

AMPS

VOLT-

CD.

MCB

WIRE

SURFACE

TRIP

MOUNTED

AMPS

MAIN

DP

NEW PANEL SHALL BE SHIFTED TO THE LEFT. THE NEW 480 VOLT PANELBOARD SHALL BE INSTALLED WHERE THE EXISTING PANEL DP IS CURRENTLY LOCATED.

THIS EXISTING PANEL SHALL BE REPLACED.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

225 KVA DRY TYPE TRANSFORMER

LOCATION:

AMPS

VOLT-

CD.

MCB

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL

TRIP

WIRE

CD.

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

225 KVA DRY TYPE TRANSFORMER

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM

SPARE

CHILLER

PANEL A

CLASSROOM 107

CLASSROOM 106

PANEL MP?

SPACE

ELEC HT WOMEN'S RR

SERVES CD.

MCB

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL DP

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP AHEAD OF MAIN

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM OVER EXIST DRY TYPE TRANSFORMER

SPACE

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MCB

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL X

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM OVER DRY TYPE TRANSFORMER

SPACE

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MCB

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL X

THIS PANELBOARD SHALL BE REPLACED IN PLACE.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

LOADCENTER A3

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL A

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

LOADCENTER A3

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL

A

CD.

AMPS

VOLT-

EXISTING

AMPS

VOLT-

CD.

MLO

WIRE

SURFACE

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM TO RIGHT OF PANEL A

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL A2

THIS LOADCENTER SHALL BE REPLACED IN PLACE.

NOTES

BREAKERS KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

LINE 1

PHASE LOAD V.A.

LINE 2

FED BY PANEL A

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM TO LEFT OF PANEL A

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

LOADCENTER A3

Y/

NOTES

BREAKERS KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

LINE 1

PHASE LOAD V.A.

LINE 2

FED BY PANEL A

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM TO LEFT OF PANEL A

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

LOADCENTER A3

Y/

THIS PANELBOARD SHALL BE REPLACED IN PLACE.

EXISTING PANEL HAS INTEGREAL 30 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

EXIST LOAD?

EXIST LOAD?

AC UNIT 109

AC UNIT 107

AC UNIT 108

AC UNIT 101

AC UNIT 118

AC UNIT 102

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM

SPACE

SPACE

SPARE

SPARE

SPARE

AC UNIT TOILETS

AC UNIT 106

AC UNIT 112

AC UNIT 114

AC UNIT 113

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL B

SINGLE PHASE

COMPUTER ROOM 193

SPD

SPACE

FUTURE 45 KVA XFMR

ELEVATOR - SHUNT TRIP

SERVES

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

PANEL C

PANEL A2

PANEL D

PANEL B

PANEL IN RM 113

ELEC HT MEN'S RR

SERVES

WIRE

PH,

MAIN ELEC ROOM

BUCK BOOST XFMR

FEEDS 150 KVA

ELEVATOR

CHILLER

PANEL A

CLASSROOM 107

CLASSROOM 106

PANEL MP?

ELEC HT WOMEN'S RR

SERVES

PANEL IN ROOM 113 IS EXISTING TO REMAIN. PANEL MP IN MECHANICAL ROOM IS EXISTING TO REMAIN.

NEW PANELBOARD SHALL HAVE FOUR (4) ADDITIONAL 3 POLE SPACES TO ACCEPT CIRCUIT BREAKER SIZES UP TO 100 AMPS.

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING CIRCUITS PRIOR TO ORDERING NEW GEAR. PROVIDE 30A/3P BREAKER TO SERVE PANEL X.

NOTES

Minimum KAIC:

CKT

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

PANEL C

PANEL A2

PANEL D

PANEL B

EXIST LOAD

SPACE

PANEL IN RM 113

SPACE

ELEC HT MEN'S RR

SERVES

WIRE

PH,

THIS PANEL IS CURRENTLY SERVED AHEAD OF THE EXISTING MAIN BREAKER IN PANEL DP. NEW PANEL SHALL BE FED FROM A CIRCUIT BREAKER IN PANEL DP.

THIS PANELBOARD SHALL BE REPLACED IN PLACE.

NOTES

Minimum KAIC:

CKT

C

PANEL DP

THIS SINGLE PHASE LOADCENTER SHALL BE REPLACED IN PLACE BY A NEW 225 AMP MLO PANELBOARD. SEE NEW PANEL SCHEDULE.

NOTES

BREAKERS KAIC:

CKT

TRIP

WIRE

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

WIRE

PH,

LINE 1

PHASE LOAD V.A.

LINE 2

FED BY PANEL DP

LOCATION:

MAIN ELEC ROOM TO RIGHT OF PANEL A

SPACE

SPACE

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

SERVES

TRIP

MOUNTED

AMPS

CKT

LOADCENTER A2

Y/

THIS 3 PHASE PANELBOARD REPLACES THE EXISTING SINGLE PHASE LOADCENTER AT THIS LOCATION.

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

E2.1

ELECTRICAL

SCHEDULES -

PANELBOARD

FILE PATH:

P:\22105\22105e22.dgn

DATE PLOTTED

DGN FILE

11-JAN-2023

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22105\22105e22.dgn

01.11.2023

AS SHOWN

TWT

BCO

TWT

22105

A m e ri c u s

G e o rg ia

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y

E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e

G S

W

-0

-2

N S T

R U

C T

C U

M E

N T S

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

CKT

RECONNECT ALL EXISTING CONTROL WIRES TO NEW RC SWITCH.

PROVIDE WITH INTEGREAL 30 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

EXIST LOAD?

EXIST LOAD?

AC UNIT 109

AC UNIT 107

AC UNIT 108

AC UNIT 101

AC UNIT 118

AC UNIT 102

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

MAIN ELEC ROOM

SPACE

SPACE

SPARE

SPARE

SPARE

AC UNIT TOILETS

AC UNIT 106

AC UNIT 112

AC UNIT 114

AC UNIT 113

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

/ PANEL B

CURRENT TWO SECTION PANELBOARD HAS A CUSTOM INTERIOR WITH TWO 30 POLE PANEL SECTIONS AND SINGLE OVERALL COVER AND TWO DOORS.

THIS PANELBOARD SHALL BE REPLACED IN PLACE.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

EXIST LOAD

EXIST LOAD

EXIST LOAD

REC 215-218

REC 217,221,222

REC 230,233,236,239,241

MASTER CLOCK

REC CONF RM/GEN OFF

REC 238,239,240,241

REC 230,233,236,239,241

REC 232,233,236,237

LTS GEN OFF 225,226

REC 232, 237

LTS CONF & 230

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

SECTION 1 OF 2

SECOND FLOOR CORRIDOR

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

REC 225,226,GEN OFF

LTS 215-218

LTS 220-223

C1 RM 202 LTS

C1 RM 201 LTS

C1 RM 201 LTS

LTS 203

C1 RM 202 LTS

LTS 203

CORR LTS

SERVES CD.

MLO

WIRE

FLUSH

TRIP

MOUNTED

AMPS

CKT

/ PANEL C

CURRENT TWO SECTION PANELBOARD HAS A CUSTOM INTERIOR WITH TWO 30 POLE PANEL SECTIONS AND SINGLE OVERALL COVER AND TWO DOORS.

THIS PANELBOARD SHALL BE REPLACED IN PLACE.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

EXIST LOAD

EXIST LOAD

EXIST LOAD

TV

LTS 212

REC SEMINAR RM

REC 211

REC 210, 211

REC 210, SEMINAR

201, 202

201, 202

REC 202,203

REC SEMINAR RM

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

SECTION 2 OF 2

SECOND FLOOR CORRIDOR

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

232233236237

LTS 210

LTS 212

LTS 212

LTS SEMINAR RM

LTS 210

WATER COOLER

WATER COOLER

RESTRM LTS

LTS 211

SERVES CD.

MLO

WIRE

FLUSH

TRIP

MOUNTED

AMPS

CKT

/ PANEL C

PROVIDE A CUSTOM ENCLOSURE WITH TWO PANEL SECTIONS AND ONE OVERALL FRAME, TWO DOORS.

CONTRACTOR SHALL MODIFY EXISTING BLOCK WALL AS NECESSARY TO ACCOMMODATE LARGER PANEL OPENING.

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

REC 215-218

REC 217,221,222

REC 230,233,236,239,241

MASTER CLOCK

REC CONF RM/GEN OFF

REC 238,239,240,241

REC 230,233,236,239,241

REC 232,233,236,237

LTS GEN OFF 225,226

REC 232, 237

LTS CONF & 230

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

FEED THRU LUGS

SECTION 1 OF 2

SECOND FLOOR CORRIDOR

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

REC 225,226,GEN OFF

LTS 215-218

LTS 220-223

C1 RM 202 LTS

C1 RM 201 LTS

C1 RM 201 LTS

LTS 203

C1 RM 202 LTS

LTS 203

CORR LTS

SERVES CD.

MLO

WIRE

FLUSH

TRIP

MOUNTED

AMPS

CKT

/ PANEL C

PROVIDE A CUSTOM ENCLOSURE WITH TWO PANEL SECTIONS AND ONE OVERALL FRAME, TWO DOORS.

CONTRACTOR SHALL MODIFY EXISTING BLOCK WALL AS NECESSARY TO ACCOMMODATE LARGER PANEL OPENING.

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

TV

LTS 212

REC SEMINAR RM

REC 211

REC 210, 211

REC 210, SEMINAR

201, 202

201, 202

REC 202,203

REC SEMINAR RM

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

SECTION 2 OF 2

SECOND FLOOR CORRIDOR

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

EXIST LOAD

232233236237

LTS 210

LTS 212

LTS 212

LTS SEMINAR RM

LTS 210

WATER COOLER

WATER COOLER

RESTRM LTS

LTS 211

SERVES CD.

MLO

WIRE

FLUSH

TRIP

MOUNTED

AMPS

CKT

/ PANEL C

THIS PANELBOARD SHALL BE REPLACED IN PLACE.

EXISTING PANEL HAS INTEGREAL 60 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

AC UNIT 211

AC UNIT 202

AC UNIT CONF/OFFICE

AC UNIT 203

AC UNIT NORTH

AC UNIT 201

AC UNIT OFFICE N CENT

AC UNIT S CENT CORR

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

SECOND FLOOR CLOSET

CONF CIRCUIT

SPARE??

SPARE??

SPARE??

AC UNIT CORR SOUTH

AC UNIT SEMINAR RM

AC UNIT 212

AC UNIT 210

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

/ PANEL D

RECONNECT ALL EXISTING CONTROL WIRES TO NEW RC SWITCH.

PROVIDE WITH INTEGREAL 60 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.

CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.

NOTES

Minimum KAIC:

CKT

TRIP

WIRE

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPACE

SPACE

SPACE

SPACE

AC UNIT 211

AC UNIT 202

AC UNIT CONF/OFFICE

AC UNIT 203

AC UNIT NORTH

AC UNIT 201

AC UNIT OFFICE N CENT

AC UNIT S CENT CORR

SERVES

WIRE

PH,

AMPS

VOLT-

NEW

A

PHASE LOAD V.A.

B

FED BY

C

PANEL DP

LOCATION:

AMPS

VOLT-

SECOND FLOOR CLOSET

SPACE

SPACE

SPACE

SPACE

CONF CIRCUIT

SPARE??

SPARE??

SPARE??

AC UNIT CORR SOUTH

AC UNIT SEMINAR RM

AC UNIT 212

AC UNIT 210

SERVES CD.

MLO

TRIP

MOUNTED

AMPS

CKT

PANEL D

WIRE

SURFACE

E2.1

ELECTRICAL

SCHEDULES -

PANELBOARD

22105_aCov
22105e01
References
tb, 22105tb.dgn
22105e10
References
tb, 22105tb.dgn
asite, 22105aSite.dgn
asite2, 22105aSiteUtilities.dgn
22105e11
References
tb, 22105tb.dgn
afp, 22105a1.dgn
22105e12
References
tb, 22105tb.dgn
afp, 22105a2.dgn
22105e21
References
tb, 22105tb.dgn
panels, panel1-Excel.dgn
22105e22
References
tb, 22105tb.dgn
panels, panel2-Excel.dgn

Other files

File Type Posted
Eng Electrical Upgrade Adden 1 —
Award Information —
Invitation to Bid —
Campus Map —
Project Manual —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .