Project Drawings
3 MB Posted
- Attached to
- English Bldg Electrical Service Upgrade
- Solicitation number
- GSW-17-01-23
- Issued by
- Terrell County, Georgia
About this file
This is a set of project drawings for an electrical service upgrade at English Building, Georgia Southwestern State University (GSW) in Americus, Georgia, prepared by NBP Engineers, Inc. The project involves replacing the main electrical service infrastructure, including installing a new 600-ampere, 480Y/277-volt, three-phase main service panel; replacing an existing 800-ampere, 208Y/120-volt distribution panel (Panel DP) with a new 800-ampere, 208Y/120-volt panel; and upgrading multiple secondary panels and load centers throughout the first and second floors of the building. The scope includes providing new feeder conductors and conduits from an exterior 480-volt service connection, establishing new grounding systems with three ground rods spaced a minimum of 10 feet apart, removing the existing 150-kilovolt-ampere buck-boost transformer serving the elevator and connecting the elevator directly to the new 480-volt service via a new 100-ampere, three-pole circuit breaker, and replacing a 225-kilovolt-ampere dry-type transformer. Additional work involves relocating the existing telephone cabinet to accommodate the new panel placement, with an estimated allowance of $10,000 for this relocation, and coordinating with the GSW IT Department. All electrical service disruptions must be scheduled during weekends or school breaks with two weeks' notice to the university.
The drawings indicate that the contractor must field-verify all existing conditions shown on the plans, as the existing conditions are based on information available at the time of design. Multiple existing branch circuits require reconnection to new panels, with feeder conductors to be replaced throughout the building. New conduit routing below grade connects to the site, and new pullboxes and wireways must be installed above accessible ceilings to accommodate the larger feeder sizes. The contractor must locate all existing utilities and coordinate with the utility protection center using the One Call system, with hand digging required around known utilities. Panelboard replacements include Panel A (208Y/120-volt), Panel A2 (240Y/120-volt loadcenter), Panel A3 (240/120-volt loadcenter), Panel B (208Y/120-volt), Panel C (208Y/120-volt, two-section custom enclosure), Panel D (208Y/120-volt), and Panel X (30-ampere panel). The design documents note that contractor verification of existing breaker sizes is required prior to ordering new equipment, and modification of existing concrete masonry unit walls may be necessary to accommodate larger panel openings. The project is documented as 100 percent construction documents dated January 11, 2023.
Text of this file
316 CORPORATE PARKWAY MACON, GEORGIA
NBP ENGINEERS, INC.
CONSULTANTS
Americus, Georgia
TITLESHEET NO.
E1.0
E0.1
NBP PROJECT No. 22105
INDEX OF
DRAWINGS
E1.1
Georgia Southwestern State University
LEGEND, SCHEDULE, RISER, & DETAILS - ELECTRICAL
FIRST FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL
E1.2 SECOND FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL
SITE PLAN - ELECTRICAL
E2.1 PANELBOARD SCHEDULES - ELECTRICAL
E2.2 PANELBOARD SCHEDULES - ELECTRICAL
GSW 17-01-23 English Building - Electrical Service Upgrade
SEAL
SCALE:
FILE PATH:
P:\22105\22105e01.dgn
DATE PLOTTED
DGN FILE
11-JAN-2023
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22105\22105e01.dgn
01.11.2023
AS SHOWN
TWT
BCO
TWT
22105
A m e ri c u s
G e o rg ia
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e
G S
W
-0
-2
C O
N S T
R U
C T
IO
N
D
C U
M E
N T S
E0.1
LINE LEGEND
EXISTING TO REMAIN
DEMOLITION
ELECTRICAL
RISER, & DETAILS -
LEGEND, SCHEDULE,
EXISTING POWER RISER
NOT TO SCALE
WP
F
JJ J
RECEPTACLES
DUPLEX - NORMAL
GFI DUPLEX - NORMAL
WEATHER PROOF OUTLET
CIRCUITS
ONE CROSSMARK PER WIRE
(3 WIRE UNLESS SHOWN)
RACEWAY CONCEALED IN CEILING OR WALL
RACEWAY IN GROUND, SLAB, OR UNDER FLOOR
HOMERUN- ONE ARROW PER CIRCUIT
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
FLEXIBLE RACEWAY
RACEWAY EXPOSED
CONDUIT UP
GENERAL EQUIPMENT
PANELBOARD-250 VAC OR LESS
SURFACE MOUNTED
DISCONNECT SWITCH: "F" IF FUSED
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS ENCLOSED BREAKER-RECESSED IN WALL
ENCLOSED CIRCUIT BREAKER
COMBINATION STARTER AND DISCONNECT
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
ELECTRICAL LEGEND
OVERHEAD CONDUITS/CONDUCTORS.
UNDERGROUND FEEDER CONDUITS SHALL BE REPLACED WITH
CONDUITS IF THOSE CONDUITS ARE OVERHEAD. ANY EXISTING
SCHEDULES. PROVIDE NEW FEEDER CONDUCTORS IN EXISTING
REPLACE EXISTING PANEL IN PLACE. SEE NOTES ON PANEL
CONDUCTORS. RECONNECT ALL EXISTING BRANCH CIRCUITS.
THREE PHASE PANELBOARD. PROVIDE NEW FEEDER CONDUIT/
REPLACE EXISTING SINGLE PHASE LOADCENTER WITH NEW
PANEL IS EXISTING TO REMAIN.
LOCATION.
EXISTING FEEDERS NOT BEING REPLACED TO THE NEW PANEL
IN THE SAME LOCATION AS EXISTING PANEL DP. EXTEND ANY
IS TO MOUNT THE NEW 600 AMP. 480Y/277 VOLT PANEL "MAIN"
SEE NOTES ABOVE RELOCATING TELEPHONE PANEL. THE INTENT
(APPROXIMATELY 6 FEET TO THE LEFT OF THE SAME WALL).
WHERE THE EXISTING TELEPHONE CABINET IS LOCATED
REPLACED. THE NEW LOCATION FOR THIS PANEL SHALL BE
EXISTING 800A DISTRIBUTION PANELBOARD DP SHALL BE
ELEVATOR. EXTEND FEEDER CONDUCTORS AS REQUIRED.
BREAKER IN THE NEW 600A SERVICE PANEL "MAIN" TO FEED THE
DRY TYPE TRANSFORMER. THERE WILL BE A NEW 100A/3P CIRCUIT
480 VOLT SERVICE TO THE ELEVATOR. REMOVE THIS EXISTING
THE EXISTING 150KVA BUCK BOOST TRANSFORMER PROVIDES
ACTUALLY THROUGH THE DISTRIBUTION PANEL DP.
NOTE THAT THE EXISTING ROUTE FOR THESE CONDUCTORS IS
RECONNECT ALL EXISTING BRANCH CIRCUITS.
RISER REGARDING ANY EXISTING UNDERGROUND PANEL FEEDERS.
PROVIDE NEW FEEDER CONDUCTORS. SEE NOTES ON EXISTING
NEW PANEL TO REPLACE EXISTING PANEL IN SAME LOCATION.
1#4G, 2•"C). RECONNECT ALL EXISTING BRANCH CIRCUITS.
PROVIDE NEW FEEDER CONDUCTORS AND CONDUIT (4#4/0 AWG COPPER,
NEW PANEL TO REPLACE EXISTING LOADCENTER IN SAME LOCATION.
PROVIDE NEW 2 SETS 4#600 KCMIL, 1#3/0 G, 4"C.
PROVIDE NEW CONCRETE HOUSEKEEPING PAD.
BY NOTE 7.
AS REQUIRED TO THE NEW PANEL DP LOCATION. USE NEW WIREWAY SHOWN
FROM EXISTING PANEL DP THAT ARE TO BE RE-FED SHALL BE EXTENDED
DISTRIBUTION PANEL DP IS CURRENTLY LOCATED. ALL EXISTING CIRCUITS
PANEL IS TO BE PLACED WHERE THE EXISTING 800 AMP, 208Y/120 VOLT
NEW 600 AMP, 480Y/277V, 3 PHASE, 4 WIRE PANEL "MAIN". NOTE THIS
EXISTING CIRCUITS FROM PANEL DP THAT ARE NOT BEING REPLACED.
PROVIDE NEW WIRING THROUGH SIZED PER NEC TO SPLICE/EXTEND AND
GROUNDS.
INSULATED GROUND CONDUCTOR. CONDUITS SHALL NOT BE USED AS
ALL FEEDER CONDUCTORS BEING REPLACED SHALL HAVE A DEDICATED, A
T
XFMR
225KVA
30A
PANEL X
60A
PANEL B
PANEL DP
800A
3 PHASE
208Y/120V
PANEL DP
SVC. DISC.
400A/3P
480Y/277V
480Y/277 VOLT
AT BUSINESS HISTORY
PADMOUNT XFMR
EXISTING
PANEL A
60A
A3
LOADCENTER
T
DP
PANEL
ELEV. FEED
DISCONNECT
100A FUSED
EXISTING 480V
PANEL DP
225A
PANEL A
PANEL DP
LOADCENTER A2
PANEL
CLASSROOM 113
MAIN MECH ROOM CLASSROOM
FIRST FLOOR
SECOND FLOOR
PANEL MP
PANEL DP
225A
2 SECTIONS
PANEL C
PANEL DP
60A
PANEL D
F
NOT TO SCALE
T
480Y/277 VOLT
AT BUSINESS HISTORY
PADMOUNT XFMR
EXISTING
MAIN MECH ROOM CLASSROOM
FIRST FLOOR
SECOND FLOOR
PANEL DP PANEL DP
225A
2 SECTIONS
NEW PANEL C
60A
NEW PANEL D
1 8
PANEL DP PANEL DP
PANEL
CLASSROOM 113
EXISTING
PANEL MP
EXISTING
PANEL DP
225A
PANEL A2
NEW
PANEL DP
225A
PANEL A
NEW
60A
A3
LOADCENTER
NEW
60A
PANEL B
NEW
1 8
XFMR
225KVA
NEW
PANEL DP
NEW
#3/0 AWG COPPER
30A
PANEL X
NEW
480Y/277V
PANEL MAIN
NEW 600A
FROM EXTERIOR
480V SERVICE
NEW 600A,
NEW WIREWAY 7
F
DISCONNECT"
BLDG. MAIN SERVICE
LABEL AS "ENGLISH
FUSED DISCONNECT
S.E. RATED
NEW 600AMP NEMA 3R
#4/0 AWG COPPER.
APART. CONNECT WITH
RODS SPACED MIN. 10FT
WITH THREE 10FT GROUND
NEW GROUNDING TRIAD
TO NEW 600A PANEL MAIN
1#1/0 AWG GROUND, 3"C
4#350 KCMIL,
NEW 2 SETS
2 SETS 4#350 KCMIL COPPER
NEW POWER RISER
NOTES:(DETAIL 2/E0.1 ONLY) NOTES:(DETAIL 1/E0.1 ONLY)
GENERAL NOTES:(DETAIL 2/E0.1 ONLY)
ON PANEL SCHEDULE.
THIS PANEL SHALL HAVE AN INTEGRAL 60 AMP CONTACTOR. SEE NOTES
NEW 5#10 AWG, ƒ"C.
RECONNECT ALL EXISTING BRANCH CIRCUITS.
CIRCUITS.
PROVIDE NEW FEEDER CONDUCTORS. RECONNECT ALL EXISTING BRANCH
NEW LOADCENTER TO REPLACE EXISTING LOADCENTER IN SAME LOCATION.
CONNECTION TO PANEL BAS.
PANEL OR EXTERNAL. PROVIDE CIRCUIT BREAKER AS REQUIRED FOR
PROVIDE NEW SURGE PROTECTIVE DEVICE (SPD). PROVIDE INTEGRAL TO
NOTES 5 AND 7.
NEW 800 AMP, 208Y/120 VOLT, 3 PHASE, 4 WIRE PANEL "DP". REFER TO
P E
R
IM
E T
E R
R
A D
DN
DN
ENGLISH BUILDING
FFE = 380.93
& POLITICAL SCIENCE BUILDING
BUSINESS, HISTORY
(ACES)
ACADEMIC SKILLS CENTER
UP
UGE
STORM INLET
MANHOLE
SANITARY
INLET
STORM
"G
"S
"G
MANHOLE
STORM
2"G
U G E
STORM INLET
UGE
MANHOLE #4
PIPE UP
TREE
PECAN
ANCHOR
BRICK RETAINING WALL
"S
UGE
INV @ 374
CONCRETE SIDEWALK
IN THIS AREA. REFER TO 32 8423
IRRIGATION PIPING EXISTS
CAUTION HIGH VOLTAGE
30"s 30"s
30"s
AT LOW POINTS
PROVIDE DRAIN
HEAT PUMPS
EXISTING
GENERATOR
GAS
FUSED DISCONNECT
EXISTING 600A/3P/3R
"C
H R
"C
H S
4"CHS
CHR-ENG-1B
CHR-ENG-1A
EXISTING DISCONNECT
TO MECH ROOM
COOLED CHILLER
EXISTING AIR
"C
H S
"C
H R
TV
CABLE
TO MH-19
MANHOLE #18
ELECTRICAL
MANHOLE #17
ELECTRICAL
PULLBOX
SN
INV @ 372.0
TOP @ 380.0
MAN HOLE#1
SN
S
T
K V
A
U G
E
U G E
S/T-7
XFMR
INV @ 371.35
TOP @ 379.0
SEAL
SCALE:
FILE PATH:
P:\22105\22105e10.dgn
DATE PLOTTED
DGN FILE
11-JAN-2023
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22105\22105e10.dgn
01.11.2023
AS SHOWN
TWT
BCO
TWT
22105
A m e ri c u s
G e o rg ia
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e
G S
W
-0
-2
N S T
R U
C T
C U
M E
N T S
N
SCALE: 1 = 20'-0
20 0 10 20 40
SITE PLAN - ELECTRICAL
NOTES:(THIS SHEET ONLY)
E1.0
ELECTRICAL
SITE PLAN -
NEW CONDUITS UP HERE
NEW PANEL MAIN
ABOVE ACC. CEILING
NEW PULLBOX AS NEEDED
RISER FOR SIZE.
NEW ROUTE FOR 600 AMP, 480Y/277, 3 PHASE FEEDER TO NEW PANEL MAIN. SEE
SIMILAR MATERIALS.
SAW CONDUIT EXISTING CONCRETE IN STRAIGHT, PARALLEL LINES. PATCH BACK WITH 2
3 CONDUITS/CONDUCTORS ABOVE ACCESSIBLE CEILING.
ENGLISH BUILDING.
EXISTING PADMOUNTED TRANSFORMER THAT SERVES BOTH BUSINESS HISTORY AND
GENERAL NOTES:(THIS SHEET ONLY)
UTILITIES.
THE UTILITY PROTECTION CENTER ONE CALL NUMBER. HAND DIG AROUND ANY KNOWN
THE TIME OF DESIGN. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES. CONTACT
EXISTING UTILITIES SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE AT A
B
C
SCHEDULED SCHOOL BREAK.
ANY ELECTRICAL SERVICE DISRUPTIONS SHALL BE ON WEEKENDS OR OVER A
NOTIFY THE OWNER TWO WEEKS PRIOR TO ANY PLANED OUTAGES.
COORDINATE ALL OUTAGES WITH GEORGIA SOUTHWESTERN STATE UNIVERSITY.
BUSINESS HISTORY BUILDING.
PROVIDE NEW 600A/3P/3R FUSED DISCONNECT MOUNTED ON EXTERIOR WALL OF
FILE PATH:
P:\22105\22105e11.dgn
DATE PLOTTED
DGN FILE
11-JAN-2023
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22105\22105e11.dgn
01.11.2023
AS SHOWN
TWT
BCO
TWT
22105
A m e ri c u s
G e o rg ia
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e
G S
W
-0
-2
N S T
R U
C T
C U
M E
N T S
1 2 3 4 5 6 7 8 9
A
B
C
D
E
MECH RM
ELEVATOR
ELEV EQUIP
1 2
A
SCALE:
= 1'-0
8 0 4 8 16
E1.1
N
PANEL B PANEL DP
PANEL A
PANEL MP
CONTROL PANEL
FIRE ALARM
LINE LEGEND
EXISTING TO REMAIN
DEMOLITION
F A
C P
FIRST FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL
ELECTRICAL
DEMO/NEW WORK -
FIRST FLOOR PLAN -
PANEL A2
PANEL A3T
T
GENERAL NOTES:(THIS SHEET ONLY)
OF THIS PROJECT. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.
PANELBOARDS, TRANSFORMERS, AND LOAD CENTERS TO BE REPLACED AS PART
AT THE TIME OF DESIGN. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
EXISTING CONDITIONS SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE A
NOTES:(THIS SHEET ONLY)
BREAKER
ENCLOSED
400A/3P
6 7
CLASSROOM
TRANSFORMER TO MAINTAIN ALL REQUIRED NEC CLEARANCES. PROVIDE CONCRETE PAD.
EXISTING 225 KVA DRY TYPE TRANSFORMER SHALL BE REPLACED IN PLACE. MOUNT NEW
NOTES:(THIS SHEET ONLY)
THIS PANEL SHALL BE REPLACED IN PLACE. SEE PANEL SCHEDULES.
EXISTING PANEL X IS LOCATED ON THE WALL ABOVE THE DRY TYPE TRANSFORMER.
MAY BE REUSED.
THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUIT
EXISTING 208Y/120 VOLT PANEL A SHALL BE REPLACED IN PLACE. REFER TO NOTES ON 3
MAY BE REUSED.
ON THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUIT
EXISTING 240/120 VOLT LOADCENTER A3 SHALL BE REPLACED IN PLACE. REFER TO NOTES 5
MAY BE REUSED.
THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUIT
EXISTING 208Y/120 VOLT PANEL B SHALL BE REPLACED IN PLACE. REFER TO NOTES ON 6
NEW PANEL MAIN.
SHALL BE REMOVED. EXTEND THE EXISTING 480 VOLT, 3 PHASE ELEVATOR FEEDER TO
THIS EXISTING 150 KVA DRY TYPE BUCK BOOST TRANSFORMER SERVING THE ELEVATOR
CONDUCTORS AND CONDUIT.
PHASE PANEL A2. REFER TO NOTES ON THE PANEL SCHEDULES. REPLACE EXISTING FEEDER
EXISTING 240Y/120 VOLT LOADCENTER A2 SHALL BE REPLACED IN PLACE WITH NEW THREE
EXISTING PANEL SHALL REMAIN IN PLACE.
EXISTING CONDUITS AS REQUIRED TO ACCOMMODATE NEW PANEL DP.
CONTRACTOR SHALL PROVIDE AN ALLOWANCE OF $10,000 TO RELOCATE THE CABLE AND
AMP, 208Y/120 VOLT DISTRIBUTION PANEL DP. COORDINATE WITH GSW IT DEPARTMENT.
EXISTING TELEPHONE CABINET SHALL BE RELOCATED IN ORDER TO ACCOMMODATE NEW 800
11 NEW SITE CONDUIT ROUTING BELOW GRADE. REFER TO SITE PLAN.
WITH COVER FOR EACH PENETRATION.
PENETRATE WALL ABOVE CEILING IN STORAGE CLOSET AND ROUTE APPROXIMATELY AS SHOWN. USE LB
NEW CONDUITS FROM SITE SHALL RISE UP EXTERIOR WALL IN LOCATION SHOWN. CONDUITS SHALL
13 PROVIDE NEW PULLBOX SIZED PER NEC ABOVE ACCESSIBLE CEILING.
14 ABOVE ACCESSIBLE CEILING IN CLASS ROOM.
TO ALLOW FOR SPLICING AND RECONNECTION OF NEW FEEDERS.
WIREWAY (SIZED PER NEC) THE FULL LENGTH ABOVE NEW PANEL MAIN AND NEW PANEL DP
AMP, 208Y/120 VOLT, 3 PHASE PANEL DP IS LOCATED. EE SITE PLAN. PROVIDE NEW, LARGE
NEW 480Y/277 VOLT, 3 PHASE, 4 WIRE PANEL MAIN SHALL BE LOCATED WHERE EXISTING 800
FILE PATH:
P:\22105\22105e12.dgn
DATE PLOTTED
DGN FILE
11-JAN-2023
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22105\22105e12.dgn
01.11.2023
AS SHOWN
TWT
BCO
TWT
22105
A m e ri c u s
G e o rg ia
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e
G S
W
-0
-2
N S T
R U
C T
C U
M E
N T S
1 2 3 4 5 6 7 8 9
A
B
D
E
SLOPE
E X
IS
T
IN
G
W A
L L
N S
T R
U C
T
IO
N
T
Y P
ELEVATOR
EXIST HALL
1 2
A
SCALE:
= 1'-0
8 0 4 8 16
E1.2
N
PANEL D
PANEL C
LINE LEGEND
EXISTING TO REMAIN
DEMOLITION
SECOND FLOOR PLAN - DEMO/NEW WORK - ELECTRICAL
ELECTRICAL
DEMO/NEW WORK -
SECOND FLOOR PLAN -
GENERAL NOTES:(THIS SHEET ONLY)
OF THIS PROJECT. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.
PANELBOARDS, TRANSFORMERS, AND LOAD CENTERS TO BE REPLACED AS PART
AT THE TIME OF DESIGN. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
EXISTING CONDITIONS SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE A
NOTES:(THIS SHEET ONLY)
MAYBE REUSED.
THE PANEL SCHEDULE. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER CONDUITS
EXISTING 208Y/120 VOLT PANEL D SHALL BE REPLACED IN PLACE. REFER TO NOTES ON
TO MATCH SURROUNDINGS.
ACCOMMODATE THE NEW FLUSH MOUNT PANELS. PATCH CMU AS NECESSARY AND RE-PAINT
CONDUIT MAYBE REUSED. CONTRACTOR SHALL MODIFY EXISTING CMU WALL AS REQUIRED TO
NOTES ON THE PANEL SCHEDULES. REPLACE EXISTING FEEDER CONDUCTORS. EXISTING FEEDER
EXISTING 2 SECTION PANEL C (208Y/120 VOLT) SHALL BE REPLACED IN PLACE. REFER TO
FILE PATH:
P:\22105\22105e21.dgn
DATE PLOTTED
DGN FILE
11-JAN-2023
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22105\22105e21.dgn
01.11.2023
AS SHOWN
TWT
BCO
TWT
22105
A m e ri c u s
G e o rg ia
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e
G S
W
-0
-2
N S T
R U
C T
C U
M E
N T S
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
SINGLE PHASE SINGLE PHASE
CKT
PANEL
PROVIDE NEW SERVICE ENTRANCE CONDUITS/CONDUCTORS.
REMOVE THE EXISTING 150 KVA DRY TYPE BUCK BOOST TRANSFORMER SERVING THE ELEVATOR. CONNECT 480 VOLT, 3 PHASE FEED DIRECTLY.
PANEL SHALL BE SERVICE ENTRANCE RATED.
NOTES
Minimum KAIC:
CKT
TRIP
1#2G
3#600
WIRE
4"
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
SPACE
SPACE
FUTURE 30 KVA XFMR
TYPE XFMR
VIA NEW 225 DRY
PANEL DP
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
EXISTING 750 KVA PADMOUNT
LOCATION:
AMPS
VOLT-
CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
MAIN
DP
NEW PANEL SHALL BE SHIFTED TO THE LEFT. THE NEW 480 VOLT PANELBOARD SHALL BE INSTALLED WHERE THE EXISTING PANEL DP IS CURRENTLY LOCATED.
THIS EXISTING PANEL SHALL BE REPLACED.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
225 KVA DRY TYPE TRANSFORMER
LOCATION:
AMPS
VOLT-
CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL
TRIP
WIRE
CD.
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
225 KVA DRY TYPE TRANSFORMER
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM
SPARE
CHILLER
PANEL A
CLASSROOM 107
CLASSROOM 106
PANEL MP?
SPACE
ELEC HT WOMEN'S RR
SERVES CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL DP
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP AHEAD OF MAIN
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM OVER EXIST DRY TYPE TRANSFORMER
SPACE
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL X
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM OVER DRY TYPE TRANSFORMER
SPACE
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL X
THIS PANELBOARD SHALL BE REPLACED IN PLACE.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
LOADCENTER A3
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL A
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
LOADCENTER A3
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL
A
CD.
AMPS
VOLT-
EXISTING
AMPS
VOLT-
CD.
MLO
WIRE
SURFACE
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM TO RIGHT OF PANEL A
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL A2
THIS LOADCENTER SHALL BE REPLACED IN PLACE.
NOTES
BREAKERS KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
LINE 1
PHASE LOAD V.A.
LINE 2
FED BY PANEL A
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM TO LEFT OF PANEL A
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
LOADCENTER A3
Y/
NOTES
BREAKERS KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
LINE 1
PHASE LOAD V.A.
LINE 2
FED BY PANEL A
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM TO LEFT OF PANEL A
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
LOADCENTER A3
Y/
THIS PANELBOARD SHALL BE REPLACED IN PLACE.
EXISTING PANEL HAS INTEGREAL 30 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
EXIST LOAD?
EXIST LOAD?
AC UNIT 109
AC UNIT 107
AC UNIT 108
AC UNIT 101
AC UNIT 118
AC UNIT 102
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM
SPACE
SPACE
SPARE
SPARE
SPARE
AC UNIT TOILETS
AC UNIT 106
AC UNIT 112
AC UNIT 114
AC UNIT 113
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL B
SINGLE PHASE
COMPUTER ROOM 193
SPD
SPACE
FUTURE 45 KVA XFMR
ELEVATOR - SHUNT TRIP
SERVES
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
PANEL C
PANEL A2
PANEL D
PANEL B
PANEL IN RM 113
ELEC HT MEN'S RR
SERVES
WIRE
PH,
MAIN ELEC ROOM
BUCK BOOST XFMR
FEEDS 150 KVA
ELEVATOR
CHILLER
PANEL A
CLASSROOM 107
CLASSROOM 106
PANEL MP?
ELEC HT WOMEN'S RR
SERVES
PANEL IN ROOM 113 IS EXISTING TO REMAIN. PANEL MP IN MECHANICAL ROOM IS EXISTING TO REMAIN.
NEW PANELBOARD SHALL HAVE FOUR (4) ADDITIONAL 3 POLE SPACES TO ACCEPT CIRCUIT BREAKER SIZES UP TO 100 AMPS.
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING CIRCUITS PRIOR TO ORDERING NEW GEAR. PROVIDE 30A/3P BREAKER TO SERVE PANEL X.
NOTES
Minimum KAIC:
CKT
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
PANEL C
PANEL A2
PANEL D
PANEL B
EXIST LOAD
SPACE
PANEL IN RM 113
SPACE
ELEC HT MEN'S RR
SERVES
WIRE
PH,
THIS PANEL IS CURRENTLY SERVED AHEAD OF THE EXISTING MAIN BREAKER IN PANEL DP. NEW PANEL SHALL BE FED FROM A CIRCUIT BREAKER IN PANEL DP.
THIS PANELBOARD SHALL BE REPLACED IN PLACE.
NOTES
Minimum KAIC:
CKT
C
PANEL DP
THIS SINGLE PHASE LOADCENTER SHALL BE REPLACED IN PLACE BY A NEW 225 AMP MLO PANELBOARD. SEE NEW PANEL SCHEDULE.
NOTES
BREAKERS KAIC:
CKT
TRIP
WIRE
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
WIRE
PH,
LINE 1
PHASE LOAD V.A.
LINE 2
FED BY PANEL DP
LOCATION:
MAIN ELEC ROOM TO RIGHT OF PANEL A
SPACE
SPACE
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
SERVES
TRIP
MOUNTED
AMPS
CKT
LOADCENTER A2
Y/
THIS 3 PHASE PANELBOARD REPLACES THE EXISTING SINGLE PHASE LOADCENTER AT THIS LOCATION.
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
E2.1
ELECTRICAL
SCHEDULES -
PANELBOARD
FILE PATH:
P:\22105\22105e22.dgn
DATE PLOTTED
DGN FILE
11-JAN-2023
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22105\22105e22.dgn
01.11.2023
AS SHOWN
TWT
BCO
TWT
22105
A m e ri c u s
G e o rg ia
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
G e o rg ia S o u th w e s te rn S ta te U n iv e rs it y
E n g li s h B u il d in g E le c tr ic a l S e rv ic e U p g ra d e
G S
W
-0
-2
N S T
R U
C T
C U
M E
N T S
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
P O
L E
CKT
RECONNECT ALL EXISTING CONTROL WIRES TO NEW RC SWITCH.
PROVIDE WITH INTEGREAL 30 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
EXIST LOAD?
EXIST LOAD?
AC UNIT 109
AC UNIT 107
AC UNIT 108
AC UNIT 101
AC UNIT 118
AC UNIT 102
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
MAIN ELEC ROOM
SPACE
SPACE
SPARE
SPARE
SPARE
AC UNIT TOILETS
AC UNIT 106
AC UNIT 112
AC UNIT 114
AC UNIT 113
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
/ PANEL B
CURRENT TWO SECTION PANELBOARD HAS A CUSTOM INTERIOR WITH TWO 30 POLE PANEL SECTIONS AND SINGLE OVERALL COVER AND TWO DOORS.
THIS PANELBOARD SHALL BE REPLACED IN PLACE.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
EXIST LOAD
EXIST LOAD
EXIST LOAD
REC 215-218
REC 217,221,222
REC 230,233,236,239,241
MASTER CLOCK
REC CONF RM/GEN OFF
REC 238,239,240,241
REC 230,233,236,239,241
REC 232,233,236,237
LTS GEN OFF 225,226
REC 232, 237
LTS CONF & 230
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
SECTION 1 OF 2
SECOND FLOOR CORRIDOR
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
REC 225,226,GEN OFF
LTS 215-218
LTS 220-223
C1 RM 202 LTS
C1 RM 201 LTS
C1 RM 201 LTS
LTS 203
C1 RM 202 LTS
LTS 203
CORR LTS
SERVES CD.
MLO
WIRE
FLUSH
TRIP
MOUNTED
AMPS
CKT
/ PANEL C
CURRENT TWO SECTION PANELBOARD HAS A CUSTOM INTERIOR WITH TWO 30 POLE PANEL SECTIONS AND SINGLE OVERALL COVER AND TWO DOORS.
THIS PANELBOARD SHALL BE REPLACED IN PLACE.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
EXIST LOAD
EXIST LOAD
EXIST LOAD
TV
LTS 212
REC SEMINAR RM
REC 211
REC 210, 211
REC 210, SEMINAR
201, 202
201, 202
REC 202,203
REC SEMINAR RM
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
SECTION 2 OF 2
SECOND FLOOR CORRIDOR
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
232233236237
LTS 210
LTS 212
LTS 212
LTS SEMINAR RM
LTS 210
WATER COOLER
WATER COOLER
RESTRM LTS
LTS 211
SERVES CD.
MLO
WIRE
FLUSH
TRIP
MOUNTED
AMPS
CKT
/ PANEL C
PROVIDE A CUSTOM ENCLOSURE WITH TWO PANEL SECTIONS AND ONE OVERALL FRAME, TWO DOORS.
CONTRACTOR SHALL MODIFY EXISTING BLOCK WALL AS NECESSARY TO ACCOMMODATE LARGER PANEL OPENING.
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
REC 215-218
REC 217,221,222
REC 230,233,236,239,241
MASTER CLOCK
REC CONF RM/GEN OFF
REC 238,239,240,241
REC 230,233,236,239,241
REC 232,233,236,237
LTS GEN OFF 225,226
REC 232, 237
LTS CONF & 230
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
FEED THRU LUGS
SECTION 1 OF 2
SECOND FLOOR CORRIDOR
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
REC 225,226,GEN OFF
LTS 215-218
LTS 220-223
C1 RM 202 LTS
C1 RM 201 LTS
C1 RM 201 LTS
LTS 203
C1 RM 202 LTS
LTS 203
CORR LTS
SERVES CD.
MLO
WIRE
FLUSH
TRIP
MOUNTED
AMPS
CKT
/ PANEL C
PROVIDE A CUSTOM ENCLOSURE WITH TWO PANEL SECTIONS AND ONE OVERALL FRAME, TWO DOORS.
CONTRACTOR SHALL MODIFY EXISTING BLOCK WALL AS NECESSARY TO ACCOMMODATE LARGER PANEL OPENING.
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
TV
LTS 212
REC SEMINAR RM
REC 211
REC 210, 211
REC 210, SEMINAR
201, 202
201, 202
REC 202,203
REC SEMINAR RM
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
SECTION 2 OF 2
SECOND FLOOR CORRIDOR
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
EXIST LOAD
232233236237
LTS 210
LTS 212
LTS 212
LTS SEMINAR RM
LTS 210
WATER COOLER
WATER COOLER
RESTRM LTS
LTS 211
SERVES CD.
MLO
WIRE
FLUSH
TRIP
MOUNTED
AMPS
CKT
/ PANEL C
THIS PANELBOARD SHALL BE REPLACED IN PLACE.
EXISTING PANEL HAS INTEGREAL 60 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
AC UNIT 211
AC UNIT 202
AC UNIT CONF/OFFICE
AC UNIT 203
AC UNIT NORTH
AC UNIT 201
AC UNIT OFFICE N CENT
AC UNIT S CENT CORR
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
SECOND FLOOR CLOSET
CONF CIRCUIT
SPARE??
SPARE??
SPARE??
AC UNIT CORR SOUTH
AC UNIT SEMINAR RM
AC UNIT 212
AC UNIT 210
SERVES CD.
MLO
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
/ PANEL D
RECONNECT ALL EXISTING CONTROL WIRES TO NEW RC SWITCH.
PROVIDE WITH INTEGREAL 60 AMP, 3 POLE RC SWITCH WITH 2-WIRE, 120V CONTROL RELAY AND ONE SET OF AUX CONTACTS.
CONTRACTOR SHALL VERIFY THE SIZES OF THE EXISTING BREAKERS PRIOR TO ORDERING NEW GEAR.
NOTES
Minimum KAIC:
CKT
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
SPACE
SPACE
SPACE
AC UNIT 211
AC UNIT 202
AC UNIT CONF/OFFICE
AC UNIT 203
AC UNIT NORTH
AC UNIT 201
AC UNIT OFFICE N CENT
AC UNIT S CENT CORR
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PANEL DP
LOCATION:
AMPS
VOLT-
SECOND FLOOR CLOSET
SPACE
SPACE
SPACE
SPACE
CONF CIRCUIT
SPARE??
SPARE??
SPARE??
AC UNIT CORR SOUTH
AC UNIT SEMINAR RM
AC UNIT 212
AC UNIT 210
SERVES CD.
MLO
TRIP
MOUNTED
AMPS
CKT
PANEL D
WIRE
SURFACE
E2.1
ELECTRICAL
SCHEDULES -
PANELBOARD
| 22105_aCov |
| 22105e01 |
| References |
| tb, 22105tb.dgn |
| 22105e10 |
| References |
| tb, 22105tb.dgn |
| asite, 22105aSite.dgn |
| asite2, 22105aSiteUtilities.dgn |
| 22105e11 |
| References |
| tb, 22105tb.dgn |
| afp, 22105a1.dgn |
| 22105e12 |
| References |
| tb, 22105tb.dgn |
| afp, 22105a2.dgn |
| 22105e21 |
| References |
| tb, 22105tb.dgn |
| panels, panel1-Excel.dgn |
| 22105e22 |
| References |
| tb, 22105tb.dgn |
| panels, panel2-Excel.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| Eng Electrical Upgrade Adden 1 | — | |
| Award Information | — | |
| Invitation to Bid | — | |
| Campus Map | — | |
| Project Manual | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file