This is a set of project drawings for the Pettigrew Boiler Replacement project at Fort Valley State University (FVSU) in Fort Valley, Georgia, prepared by NBP Engineers, Inc. The project, designated PHB-2021, involves the replacement of the existing boiler system in the Pettigrew building with comprehensive mechanical, plumbing, electrical, and HVAC system upgrades. The scope of work includes demolition of existing equipment such as the current boiler, pumps, expansion tanks, and associated piping, along with installation of new systems including a condensing hot water boiler (BLR-1) rated at 1,250 MBH, two new heating water circulation pumps (HP-1 and HP-2) with variable frequency drives, new expansion tanks, air separators, chemical feed systems, and updated gas, water, and electrical infrastructure. The drawings are dated October 4, 2021, and represent 100% construction documents. Sealed bids were due on November 9, 2021, at 2:00 PM at FVSU's Pettigrew Ballroom, with bids to be publicly opened and announced at that time. Bidding documents were available through NBP Engineers, Inc. via email or through the Georgia Procurement Registry.
The project includes substantial modifications to mechanical systems, including new gas piping with a total load of 1,700 MBH (1,250 MBH for boiler, 400 MBH for building heating, and 50 MBH for gas range), all set to 2 PSI delivery pressure through a new gas regulator. Plumbing work encompasses new water piping routed above ceilings, drain systems, and connections to existing utilities. Electrical work includes replacement of the existing 480Y/277 volt, 800-ampere main distribution panel (MDP) with new service entrance conductors, a new 20-ampere circuit for boiler control, and a 30-ampere fused disconnect for the variable frequency drive, along with replacement of four fluorescent light fixtures with LED units equipped with emergency battery packs. The project also involves HVAC system modifications with new ductwork, controls, and flow monitoring. All existing equipment designated to remain, including the chilled water system, aftercooler, air compressor, and water heater, will be coordinated with the new boiler installation.
Text of this file
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
M2.0
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
ABBREVIATIONS, LEGENDS, SCHEDULES, & DETAILS - HVACM0.0
E0.0 LEGEND, SCHEDULE, NOTES, & DETAILS - ELECTRICAL
FORT VALLEY, GEORGIA 31030
1005 STATE UNIVERSITY DR.
PETTIGREW BOILER REPLACEMENT
FORT VALLEY STATE UNIVERSITY
LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
P2.0
P0.0 LEGEND, SCHEDULE, NOTES, & DETAILS - PLUMBING
LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - PLUMBING
E2.0 LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL
M4.0
M5.0 DETAILS - HVAC
FLOW DIAGRAM - HVAC
10.04.2021 100% CONSTRUCTION DOCUMENTS
FVSU PROJECT No. PHB-2021
P:\20066\20066p00.dgn
DATE PLOTTED
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066p00.dgn
AS SHOWN
10.04.2021
20066
JDL
WHD
F O
R T
V A
L L
E Y G
E O
R G
IA
S T
A
E
U N
IV
E R
S
IT
Y
D
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
DCS
P E
T T
IG
R
W
B O
IL
P L
A C
E M
E N
T F
O
L L
S
A
IV
E R
S
IT
Y
C
N S T
R U
C T
IO
C U
M E
N T S
F V
P
O J E o P
H B
P0.0
PLUMBING
NOTES, & DETAILS -
LEGEND, SCHEDULE,
FIXTURES.
SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL PLUMBING
ALL WATER PIPING SHALL BE RUN ABOVE CEILING UNLESS OTHERWISE
NOTED.
ALL VENTS THRU ROOF (VTR) SHALL BE OFFSET A MINIMUM OF 15'-0"
FROM ALL OUTSIDE INTAKES.
-5 PROVIDE HANGER ON ALL HORIZONTAL WATER PIPING INSIDE CHASES
COORDINATE PLUMBING PIPING WITH AIR CONDITIONING DUCTS, EQUIPMENT
AND ELECTRICAL CONDUIT.
GENERAL NOTES:
WITHIN 6" OF SPECIFIED WATER HAMMER ARRESTOR.
NOTE TO CONTRACTOR:
PROVIDE ACCESS TO THE CONCEALED UTILITY.
WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO
PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF
TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES
NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING
FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT
WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,
NOTES:
GAS REGULATOR SCHEDULE
NUMBER
REGULATOR
SERVED
EQUIPMENT
LOCATION
EQUIPMENT
INPUT DEMAND
MBH GAS
PRESSURES
INLET/OUTLET
BOILER 1,250 MBH MECH. ROOM 2psi/10"W.C.
GR-2
WATER HEATER
450 MBH MECH. ROOM 2psi/7"W.C.
LEGEND
SOIL , WASTE VENT
D CONDENSATE DRAIN COLD WATER
HOT WATER (140 ) HOT WATER RETURN
G GAS (LOW PRESSURE) HIGH PRESSURE GAS HPG
GATE VALVEBALL VALVE
CHECK VALVE
BALANCER (CIRCUIT SETTER)
FLOW INDICATOR
STRAINERPRESSURE REDUCING VALVE
GLOBE VALVE UNION
GAS COCK AQUASTAT
INCREASER FLOOR DRAIN (FD)
CLEANOUT (CO) CLEANOUT (CO)
HUB DRAIN BELOW FLOORBF
ABOVE CEILINGAC ABOVE FINISHED FLOORAFF
EXISTING VENT TO REMAIN
TO REMAIN
EXISTING SOIL, WASTE
WATER TO REMAIN
EXISTING COLD
BE REMOVED
EXISTING PIPING TO
WATER TO REMAIN
EXISTING HOT
RETURN TO REMAIN
EXISTING HOT WATER
LIMIT OF DEMOLITION
NEW TO EXISTING
POINT OF CONNECTION
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
UTILITY PIPING (C.W., H.W.,
H.W.R., GAS, AIR)
4"(TYPICAL)
TRAPEZE HANGER
SEE SPECIFICATIONS(SECTIONAL VIEW)
(SIDE VIEW)
NOT TO SCALE
& GAS RANGE
* PIPE RELIEF VENT FULL SIZE TO OUTSIDE. PIPE AWAY FROM INTAKE LOUVERS, ETC.
FIN
ISHED
GRADE
GAS METER & REGULATOR PIPING SCHEMATIC
NOT TO SCALE
GAS COCK
EXISTING
EXISTING GAS SERVICE
OUTLET PRESSURE OF 2PSI
NEW GAS REGULATOR SET FOR
GAS METER
DOWNSTREAM FROM METER
PROVIDE NEW GAS VALVE
1 ‚" GAS(2PSI)
THROUGH BUILDING WALL
SEAL NEW GAS PIPING
TO BUILDING EQUIPMENT
GR-3
GR-1
GR-3 BUILDING AT METER 1,700 MBH 30psi/2psi
GEXGAS REGULATOR GAS EXHAUST
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
P2.0
MDP
XDP
LDP
T
45KVA
F
HWH
BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - PLUMBING
LARGE SCALE -
BOILER/CHILLER MECHANICAL ROOM - NEW WORK - PLUMBING
LARGE SCALE -
PLUMBING
DEMOLITION & NEW WORK -
MECHANICAL ROOM -
BOILER/CHILLER
LARGE SCALE -
3"
3"V-UP
H P
G
4"CO
4"
4"V-BF
G
3"
4"V-UP
1 •"
4"CO
3"ƒ"2"
3" 3"
EXISTING 55 GAL EXP TANK
EXISTING PUMP GAUGES
CHEMICAL FEED ON WALL
EXISTING BYPASS
MOUNTED ON WALL
EXISTING AFTERCOOLER
EXISTING AIR COMPRESSOR
CHEMICAL FEED ON WALL
EXISTING BYPASS
EXISTING PUMP GAUGES
EX. UH
F A
C P
M C
C
EF-9
EX.
EF-8
EX.
EX. HP
EX. CP
DRAIN DN
SPRINKLER
EXISTING
EX. BOILER
1‚"
EX. ACP
1•" CW
4"W-DN
ƒ"
G
3"
3"V
1"
4"FD
3"FD
4"FD
4"FD
4"FD
G
4"
4"FD
ƒ"
G
EXPANSION TANK TO REMAIN
EXISTING CHW
HEATER IS TO REMAIN
EXISTING WATER
TO BE REMOVED
EX. GAS REGULATOR
•"G
1‚"G
1•"G
GR-2
GR-1
2•"G
G(2PSI)
1‚"G(2PSI)
G (2
P S I)
1‚"G(2PSI)
1‚"G(2PSI)
1‚"G
NOTES:(THIS SHEET ONLY)
CONNECT NEW 1‚" GAS TO EXISTING PIPING SERVING WATER HEATER.
CONNECT NEW •" GAS TO EXISTING GAS PIPING SERVING GAS RANGE.
FROM GR-1 PRIOR TO CONNECTING TO BOILER.
MINIMUM OF 10 FEET OF 2•" GAS PIPING DOWNSTREAM
CONNECT 2•" GAS TO NEW CONDENSING BOILER. ROUTE A
REMOVE ALL LOW PRESSURE GAS PIPING TO POINT SHOWN .
5G E
X
G E
X
6 ROUTE GAS EXHASUT FULL SIZE FROM REGULATOR TO EXTERIOR.
BUILDING HEATING, 400 MBH WATER HEATING, AND 50 MBH FOR GAS RANGE.
PRESSURE TO BE 2 PSI. TOTAL LOAD IS 1,700 MBH. LOAD BREAKDOWN; 1,250 MBH
PROVIDE NEW GAS REGULATOR, AND REUSE EXISTING GAS METER. SET DELIVERYTO REMAIN
EX. GAS METER
CONTRACTOR TO VERIFY PRIOR TO PERFORMING ANY WORK.
THE GAS METER AND REGULATOR ARE OWNED AND MAINTAINED BY FVSU, BUT
COORDINATE WITH JOINTLY OWNED GAS COMPANY. THE GAS COMPANY BELIEVES
BUILDING THROUGH EXISTING SLEEVE. SEAL PENETRATION.
CONNECT NEW 1 ‚" GAS PIPING TO EXISTING MAIN LEAVEING METER. ROUTE INTO
THROUGH WALL.
REMOVE 3" GAS PIPING
P:\20066\20066p20.dgn
DATE PLOTTED
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066p20.dgn
AS SHOWN
10.04.2021
20066
JDL
WHD
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
DCS
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
MDP
XDP
LDP
T
45KVA
F
HWH
3"
3"V-UP
H P
G
4"CO
4"
4"V-BF
4"V-UP
1 •"
4"CO
3"ƒ"2"
3" 3"
MOUNTED ON WALL
EXISTING AFTERCOOLER
EXISTING AIR COMPRESSOR
CHEMICAL FEED ON WALL
EXISTING BYPASS
EXISTING PUMP GAUGES
EX. UH
F A
C P
M C
C
EF-9
EX.
EF-8
EX.
EX. CP
DRAIN DN
SPRINKLER
EXISTING
1‚"
EX. ACP
1•" CW
4"W-DN
ƒ"
3"V
1"
4"FD
3"FD
4"FD
4"FD
4"FD
G
4"
4"FD
ƒ"
EXPANSION TANK TO REMAIN
EXISTING CHW
HEATER IS TO REMAIN
EXISTING WATER
BLR-1
NEW
NEW VFD
NEW ACP
HP-1
NEW
HP-2
NEW
P:\20066\20066m00.dgn
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m00.dgn
AS SHOWN
10.04.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
M0.0
CHS CHR
HWS HWR
CR
D
SPF
HTWS HTWR
DTS DTR
CHILLED WATER SUPPLY CHILLED WATER RETURN
HEATING WATER SUPPLY HEATING WATER RETURN
CONDENSER WATER SUPPLY CONDENSER WATER RETURN
CONDENSATE DRAIN
FIRE PROTECTION MAIN STANDPIPE
HIGH TEMP. SUPPLY HIGH TEMP. RETURN
DUAL TEMP. SUPPLY DUAL TEMP. RETURN
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID
CONDENSATE DRAIN
CS
RS REFRIGERANT SUCTION
RG REFRIGERANT HOT GAS
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
(15 PSIG. MAX)
CR CONDENSATE RETURN (LP)
PUMPED CONDENSATE
50#
STEAM
(PRESSURE INDICATED)
SOLENOID VALVE RELIEF VALVE
GATE VALVE WITH
3/4" HOSE END
NEEDLE VALVE
OS&Y GATE VALVE .
GAS COCK
AUTOMATIC AIR VENTAAV
GAUGE WITH COCK
BOILER DRAIN PIPE TEST PLUG
FLEX. PIPE CONN. BACKFLOW PREVENTER
MANUAL AIR VENT
STRAINER
ELBOW UP ELBOW DOWN
BRANCH OUT BOTTOM BRANCH OUT TOP
TEE OUT BOTTOM TEE OUT TOP
SCREWED UNION FLANGED UNION
PIPE CAP BLIND FLANGE
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
2-WAY CONTROL VALVE
CONTROL VALVE
PLAN VIEW
ECCENTRIC REDUCER
GAUGE COCK
3-WAY MIXING
VALVE IN VALVE BOX
CONTROL VALVE
HPS
THERMOMETER IN WELL
SEPARABLE SOCKET WELL
LPS
PLUG VALVE
PCR
CONNECT TO EXISTING
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
95 F DB / 78 F WB 25 F DB
72 F DB75 F DB / 55% RH
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
MARK REMARKS
SCHEDULES - HVAC
LEGEND, &
ABBREVIATIONS,
MARK SERVICE TYPE GPM
FT.H O
MAX. MIN.
EFF.%2
MANUFACTURERS
REMARKS
DYNAMIC
PUMP SCHEDULE
BELL & GOSSETT
RPM
HP
CONDENSING HOT WATER BOILER SCHEDULE
MBH
INPUT
BOILER
MBH
OUTPUT
EFFICIENCY
MIN.
PRESSURE
OPERATING
GPM VOLT/PHASE
BLR-1 120/11250 1200 96% 45
VIL 1750HP-1 BLDG HW
VIL 1750HP-2 BLDG HW
60135
5 61.6 2.5x2.5x9.5C 2x2x9.5 2x2x9.5
TACOPATTERSON
60 5 61.6 2.5x2.5x9.5C 2x2x9.5 2x2x9.5
BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - HVAC
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
BOILER/CHILLER MECHANICAL ROOM - NEW WORK - HVAC
LARGE SCALE -
M2.0
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
BOILER/CHILLER
LARGE SCALE -
32/12
8/
T
FD
1 ‚"
T
5"
1"
FM
1 ‚"
EXISTING BOILER
4"
3"
MDP
XDP
LDP
T
45KVA
M C
C
F
F A
C P
CHS
EXISTING RELIEF VALVE
EF-8
EX.
EF-9
EX.
4"
EXISTING PIPES UP TO 2nd
EXISTING ACP
DRAIN DN
SPRINKLER
EXISTING
F-1
EX. CP
EX. UH
4"
CONNECT TO POTABLE WATER
EXISTING 1 •"CW;
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
REMOVE
CONCRETE PAD
& CORRESPONDING
REMOVE EXISTING HW PUMP
FILLTROL PURGER
REMOVE EXISTING
TO CAP ON ROOF
EXISTING BOILER FLUE
REMOVE PORTION OF
CHEMICAL FEED ON WALL
REMOVE EXISTING BYPASS
GAL EXP TANK
REMOVE EXISTING 55
PUMP GAUGES
REMOVE EXISTING
EXISTING WATER HEATER TO REMAIN
REMOVE EXISTING 8"{ FLUE
EXISTING FILLTROL PURGER TO REMAIN
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
EXISTING UH THERMOSTAT TO REMAIN
TO REMAIN
EXISTING AFTERCOOLER
TO REMAIN
EXISTING AIR COMPRESSOR
WATER MAKE-UP TO REMAIN
EXISTING CHW
EXPANSION TANK TO REMAIN
EXISTING CHW
AIR SEPARATOR TO REMAIN
EXISTING CHW TANGENTIAL
MUW
NOTES:(THIS SHEET ONLY)
REFER TO SPECS FOR DRAFT FAN DF-1 REQUIREMENTS.
2 CONNECT NEW FLUE TO EXISTING WATER HEATER.
4" HWR
CONCRETE BASE
REMOVE EXISTING
CONCRETE BASE
EXISTING
H W
S
H W
S
4"
4"4"
4"
4" HWS
3 3
3 BUTTERFLY VALVE WITH BLIND FLANGE FOR TEMPORARY BOILER.
4 BUTTERFLY VALVE WITH BLIND FLANGE FOR FUTURE BYPASS VALVE.
EX. HP
NEW CONCRETE PAD
NEW HW EXPANSION TANK
NEW TANGENTIAL AIR SEPARATOR
CHEMICAL FEEDER TANK
NEW HW BYPASS
BLR-1
NEW
NEW VFD
NEW ACP
HP-1
NEW
HP-2
NEW
AND TILE WITH NEW TO MATCH EXISTING.
REMOVE EXISTING ACOUSTICAL CEILING AND REPLACE CEILING GRID
FLUE CAP ON ROOF
CHASE; REMOVE EXISTING
THRU EXISTING 2ND FLOOR
REMOVE EXISTING FLUE UP
5 5
BOILER FLUE
NEW 8"{
PROVIDE NEW FLUE CAP ON ROOF
UP THRU EXISTING CHASE;
NEW 8"{ BOILER FLUE
HEATER FLUE
NEW 8"{ WATER
CHASE; PROVIDE NEW FLUE CAP ON ROOF
UP THRU EXISTING 2ND FLOOR
NEW 8"{ WATER HEATER FLUE
P:\20066\20066m20.dgn
DATE PLOTTED
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m20.dgn
AS SHOWN
10.04.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
32/12
8/
T
FD
1 ‚"
T
5"
1"
FM
1 ‚"
4"
3"
MDP
XDP
LDP
T
45KVA
M C
C
F
F A
C P
CHS
EXISTING RELIEF VALVE
EF-8
EX.
EF-9
EX.
EXISTING PIPES UP TO 2nd
EXISTING ACP
DRAIN DN
SPRINKLER
EXISTING
F-1
EX. CP
EX. UH
CONNECT TO POTABLE WATER
EXISTING 1 •"CW;
EXISTING WATER HEATER TO REMAIN
EXISTING FILLTROL PURGER TO REMAIN
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
EXISTING UH THERMOSTAT TO REMAIN
TO REMAIN
EXISTING AFTERCOOLER
TO REMAIN
EXISTING AIR COMPRESSOR
WATER MAKE-UP TO REMAIN
EXISTING CHW
EXPANSION TANK TO REMAIN
EXISTING CHW
AIR SEPARATOR TO REMAIN
EXISTING CHW TANGENTIAL
CONCRETE BASE
EXISTING
P:\20066\20066m40.dgn
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m40.dgn
AS SHOWN
10.04.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
M4.0
HVAC
FLOW DIAGRAM -
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
F.M.
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
4"
4"
4"
4"
4"
4" 4"
4"
4"
4"
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BLR-1 BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
HEATING SYSTEM PUMP-VFD CONTROL
HEATING SYSTEM PUMP-VFD CONTROL
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
HP-1
HP-2
BOILER PLANT SYSTEM
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
M
A P
H
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
K E
U P
S E
T P
O
IN
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
L
IM
IT
R
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
H
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
IN
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
F
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
FLOW DIAGRAM - HVAC
L
O
O
DP-1 (FUTURE)
VLV-1 (FUTURE)
TEMPORARY BOILER
BLIND FLANGE FOR
4"
4"
4"4"4"
TEMPORARY BOILER
BLIND FLANGE FOR
4"
HWS
HWR HWR
HWS
BLR-1
NEW
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
INITIAL FILL PRESSURE. 18 GAL.
EXPANSION TANK, SET 25 PSIG
MIN. ACCEPTANCE VOLUME.
111 GAL. MIN. TANK VOLUME
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
NEW HP-2
NEW HP-1
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
FUTURE
BYPASS VALVE
CV= 15.0
FLANGE
BLIND
FLANGE
BLIND FUTURE
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
P:\20066\20066m50.dgn
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066m50.dgn
AS SHOWN
10.04.2021
WSH
LTF
WSH
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
M5.0 ƒ" CHAMFER
ALL SIDES UNLESS OTHERWISE NOTED
EQUIPMENT
4" MINIMUM ALL SIDES
6" X 6", 10\10 WELDED WIRE
FABRIC AT MID-DEPTH OF
PAD (UNLESS OTHERWISE NOTED)
SLAB, FLOOR, OR SUPPORTING STRUCTURE.
ROUGH UP WHERE CONCRETE DOES NOT HAVE
BROOM FINISH OR ROUGHER.
6" THICK CONCRETE
(INERTIA PAD IDENTICAL)
HOUSEKEEPING PAD DETAIL
NOT TO SCALE
REDUCER
‚" COPPER TUBING
•" GATE VALVE
•" 4" NIPPLE
CIRCULATING WATER PIPING
NOTES:
1.
2.
VENT ALL HIGH POINTS AS INDICATED ABOVE.
IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
ELEVATION TYPICAL AIR VENT
NOT TO SCALE
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
NOT TO SCALE
A
BC
E
BY-PASS CHEMICAL FEEDER
BC
TO HEATING
SYSTEM
TO COOLING
SYSTEM
B -ƒ" TO DISCHARGE OF PUMP.
C -ƒ" TO SUCTION OF PUMP.
E -‚" GAUGE COCK FOR VENT.
F - RISER CLAMP. WELD TO 2X3/4 " FLAT
OFFSET BRACKET TO WALL.
A - CHEMICAL FEEDER TANK.
D -ƒ" TO FLOOR DRAIN.
D
4"MIN.
WELD
F
NOT TO SCALE
SERVICE TEE
ECCENTRIC REDUCER
•" STREET ELL.
AUTOMATIC AIR VENT
MAINS
•"X2" NIPPLE
„"MPT X ‚" FLARE ELL.
‚" COPPER TO FLOOR
DRAIN OR OUTSIDE
AS SHOWN.
AUTOMATIC AIR VENT
NOT TO SCALE
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
NOT TO SCALE
TEST PLUG
GATE VALVE
STRAINER
BALANCE VALVE
CHECK VALVE
PIPES SUPPORT
PRESSURE GAUGE
GAUGE COCK
VERTICAL IN-LINE PUMP DETAIL
VERTICAL INLINE PUMP
NOT TO SCALE
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL) BACKFLOW PREVENTER
1"1"
MAKE - UP WATER STATION
GAUGE COCK
ƒ"
PRESSURE REDUCING
VALVE. SET AT
1"
AIR GAP DRAIN
FITTING
1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR
TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE
CLAMPS SAME MATERIAL AS PIPE.
PSI.
GAUGE
GATE VALVE
GATE VALVE
NOT TO SCALE
TO FILL POINT
OF SYSTEM
BALL VALVE
QUICK FILL
CONNECTION
TO DOMESTIC COLD
WATER SUPPLY
S
BRANCH CIRCUIT FROM
PANELBOARD,SWITCHGEAR,OR MCC
(1600)
VFD PACKAGE
(1500)
(1600)
NOTES:(THIS DETAIL ONLY)
SYSTEM SHOWN IN NORMAL (VFD NOT BYPASSED)
NUMBERS IN PARENTHESES INDICATE DIVISION
UNDER WHICH WORK OR EQUIPMENT IS SPECIFIED.
MOTOR
(1500)
VFD SINGLE LINE DIAGRAM
NOT TO SCALE
RECTIFIER
AND INVERTER
MODE, MOTOR RUNNING.
OVERLOAD
CIRCUIT
BREAKER
DETAILS - HVAC
P:\20066\20066e00.dgn
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066e00.dgn
AS SHOWN
10.04.2021
TWT
JCW
TWT
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
P O
L E
P O
L E
P O
L E
P O
L E
CKT
PANEL
TRIP
WIRE
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
EXIST LOAD
EXIST LOAD
PANEL HC
PANEL HA
MCC
SERVES
WIRE
PH,
AMPS
VOLT-
EXISTING
A
PHASE LOAD V.A.
B
FED BY
C
PADMOUNT XFMR
LOCATION: MAIN MECHANICAL ROOM
AMPS
VOLT-
VIX XDP
PANEL LDP
EXIST LOAD
EXIST LOAD
ELEVATOR
PANEL HB
CHILLER
SERVES CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
MDP
EXISTING MAIN SERVICE GROUND SHALL BE REUSED.
THIS EXISTING MAIN SERVICE PANEL SHALL BE REPLACED IN PLACE WITH NEW PANEL. REFER TO NEW PANEL SCHEDULE.
NOTES
Minimum KAIC:
CKT
P O
L E
P O
L E
P O
L E
P O
L E
MDP
TRIP
4#10
4#10
WIRE
3/4"
3/4"
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
5 HP
NEW PUMP HP-2
5 HP
NEW PUMP HP-1
PANEL HC
PANEL HA
MCC
SERVES
WIRE
PH,
AMPS
VOLT-
NEW
A
PHASE LOAD V.A.
B
FED BY
C
PADMOUNT XFMR
LOCATION: MAIN MECHANICAL ROOM
AMPS
VOLT-
SPD
SPARE
SPARE
ELEVATOR
PANEL HB
CHILLER
VIA XDP
PANEL LDP
SERVES CD.
MCB
WIRE
SURFACE
TRIP
MOUNTED
AMPS
CKT
PANEL
REPLACE EXISTING SERVICE ENTRANCE CONDUCTORS. REFER TO NOTES ON PLANS.
RECONNECT ALL EXISTING LOADS. EXTEND EXISTING FEEDER AND BRANCH CONDUCTORS AS NECESSARY.
PROVIDE WITH 240 KA PER PHASE, 120 KA PER MODE SURGE PROTECTIVE DEVICE (SPD).
NOTES
Minimum KAIC:
CKT
E0.0
ELECTRICAL
NOTES, & DETAILS -
LEGEND, SCHEDULE,
EXISTING POWER RISER DIAGRAM
NOT TO SCALE
XFMR
PADMOUNT
750 KVA
EXISTING
T T
LDP
PANEL
XFMR
DRY
300 KVA
EXISTING XDP
MDP
PANEL
MCC
EXISTING
15KV, URD
3#4/0 ALUM,
4"-2W, SETS
MANHOLE #20
TO EXIST. PRIMARY 4#500MCM, 4"C
2 SETS:
MCM, 3•"C
3 SETS: 4#400
MDP-3
HA
PANEL
LDP-1
LA
PANEL
HA-9
MDP-1
(INVERTER)
A.C. PACKAGE
EMER.
"E"
LDP-2
LB
PANEL
MDP-5
HC
PANEL
LDP-5
LE
PANEL
PANEL
DIMMER
LIGHTING
STAGE
LDP-6
LF
PANEL
MDP-4
HB
PANEL
LDP-3
LC
PANEL
LDP-4
LD
PANEL
CT
TRACK LIGHTS: QUANTITY OF HEADS AS SHOWN EMERGENCY BATTERY PACK-CEILING
EMERGENCY BATTERY PACK-WALL
PANELBOARD-250 VAC OR LESS
SURFACE MOUNTED
PANELBOARD-250 VAC OR LESS
RECESSED
PANELBOARD-OVER 250 VAC
SURFACE MOUNTED
PANELBOARD-OVER 250 VAC
RECESSED
CABLE TRAY
BACKBOARD
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
CONDUIT UP
J
F
BT
C
C
BR
SLAB OR BELOW GRADE
GROUNDING CONDUCTOR- UNDER
U
SP
DP
PE
M
ICM
S
V
S
IC
MM
MC
GG
G
LIGHTING FIXTURES (SYMBOLS VARY BASED ON FIXTURES TYPE)
LIGHTING CONTROL
RECEPTACLES
CIRCUITS
GENERAL EQUIPMENT
FIRE PROTECTION EQUIPMENT
COMMUNICATIONS
LIGHTNING PROTECTION AND GROUNDING
T
JJ
I
UI
I
ELECTRICAL LEGEND
TV
C
G
B
K
LED ON "NORMAL" POWER
CEILING MOUNTED FIXTURE
WALL MOUNTED FIXTURE
EXIT LIGHT (ARROWS AS SHOWN)
LIFE SAFETY EGRESS FIXTURE
CEILING MOUNTED ULTRASONIC OCCUPANCY
SENSOR AND RELAY
CEILING/WALL MOUNTED INFRARED OCCUPANCY
SENSOR AND RELAY
CEILING MOUNTED COMBINATION INFRARED/
ULTRASONIC OCCUPANCY SENSOR AND RELAY -
SWITCHING PHOTOCELL (INTERIOR TYPE) F.C. NOTED
DIMMING PHOTOCELL (INTERIOR TYPE)
EXTERIOR TYPE PHOTO SWITCH
LOW VOLTAGE OVERRIDE SWITCH
INFRARED OCCUPANCY SENSOR
WALL MOUNTED SWITCH
"P" INDICATES PILOT LIGHT
KEYED SWITCH
DIMMER SWITCH
FOUR WAY SWITCH
THREE WAY SWITCH
SINGLE POLE SWITCH
DUPLEX RECEPTACLE - NORMAL
QUAD - NORMAL
GFCI DUPLEX RECEPTACLE - NORMAL
GFCI QUAD - NORMAL
FLOOR DUPLEX RECEPTACLE - NORMAL
FLOOR QUAD - NORMAL
CEILING DUPLEX RECEPTACLE - NORMAL CLOCK OUTLET
WALL/CEILING RACEWAY
CEILING SPECIAL - TYPE NOTED OR SHOWN
SPECIAL - TYPE NOTED OR SHOWN
HORIZONTALLY MOUNTED DUPLEX RECEPTACLE
WEATHER PROOF RECEPTACLE (GFCI)
ELECTRIC WATER COOLER RECEPTACLE(GFCI)
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT IN GROUND, SLAB, OR UNDER FLOOR
FLEXIBLE RACEWAY
RACEWAY EXPOSED
TRANSFORMER
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
ENCLOSED BREAKER-RECESSED IN WALL
ENCLOSED CIRCUIT BREAKER
EMERGENCY PUSHBUTTON
COMBINATION STARTER AND DISCONNECT
EXHAUST FAN
MANUAL STARTER AND MOTOR RATED SWITCH
MOTOR
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
VOICE OUTLET, QUANTITY OF JACKS AS NOTED
DATA OUTLET, QUANTITY OF JACKS AS NOTED
COMBINATION VOICE/DATA OUTLET, QUANTITY OF
VOICE/DATA JACKS AS NOTED
FLOOR VOICE OUTLET, QUANTITY OF JACKS
AS NOTED
FLOOR DATA OUTLET, QUANTITY OF JACKS
AS NOTED
FLOOR COMBINATION VOICE/DATA OUTLET,
QUANTITY OF JACKS AS NOTED
MASTER CLOCK
INTERCOM MASTER STATION
INTERCOM CALL-IN STATION
WALL MOUNTED VOLUME CONTROL
BOX, STUB-UP, AND MODULAR PLATE W/ BLANKS
TELEVISION OUTLET
SPEAKER: CEILING/WALL
MICROPHONE: FLOOR/WALL
FIBER OUTLET
GROUND ROD - C IF CHEMICAL
GROUND CONNECTION (SCHEMATIC)
CONCEALED IN ROOF OR WALLS
GROUNDING CONDUCTOR-
GROUNDING CONDUCTOR- EXPOSED
AIR TERMINAL
GROUNDING PLATE
FACP
FAA
WF
VS
DH
SMOKE DETECTOR/SENSOR - BEAM RECEIVER
SMOKE DETECTOR/SENSOR - BEAM TRANSMITTER
SPEAKER/VISUAL ALARM: CEILING/WALL
VISUAL ALARM: CEILING/WALL
AUDIO/VISUAL ALARM: CEILING/WALL
MANUAL PULL STATION
FIRE ALARM ANNUNCIATOR
FIRE ALARM PANEL
DUCT MOUNTED SMOKE DETECTOR
SMOKE DETECTOR: CEILING / WALL
HEAT DETECTOR: CEILING / WALL
WATER FLOW SWITCH
WATER TAMPER SWITCH
DOOR HOLDER
FIREMAN'S PHONE OUTLET
EWC
WP
H
D
P
I
L
TWO ZONE LOW VOLTAGE SWITCHL2
VACANCY AUTO SHUT OFF
FOUR ZONE LOW VOLTAGE SWITCHL4
DUPLEX RECEPTACLE WITH INTEGRAL USBUSB
TV DUPLEX RECEPTACLETV
AC
ABOVE COUNTER DUPLEX RECEPTACLE (COORDINATE
HEIGHT WITH ARCHITECT)
J-HOOK
SECURITY
C CARD READER
P DOOR POSITION SENSOR
SECURITY CAMERA: CEILING/WALL MOUNTED
ES ELECTRIC STRIKE
C
CABLE TRAY
DUPLEX RECEPTACLE MOUNTED IN RACEWAYR
R DATA OUTLET MOUNTED IN RACEWAY
DUPLEX RECEPTACLE - TAMPER PROOFT
DUPLEX RECEPTACLE - GENERATOR CIRCUIT, RED IN COLOR
QUAD - GENERATOR CIRCUIT, RED IN COLOR
SINGLE ZONE LOW VOLTAGE SWITCHL1
HOMERUN - ONE ARROW PER CIRCUIT
DISCONNECT SWITCH: "F" IF FUSED
F
1 ADDDENDUM No. 1 09.23.21
NOTES:(THIS SHEET ONLY)
SEE SPECIFICATIONS FOR DETAILS.
CONFIGURATION. PROVIDE WITH A NEW SURGE PROTECTIVE DEVICE (SPD).
WITH NEW SERVICE PANEL. SEE SCHEDULES BELOW FOR EXISTING AND NEW
REPLACE EXISTING 480Y/277 VOLT, 800 AMP MAIN DISTRIBUTION PANEL MDP 1
SERVICE ENTRANCE CONDUITS.
PROVIDE NEW 2 SETS 4#600 KCMIL COPPER CONDUCTORS IN EXISTING 4 INCH
REMOVE EXISTING 2 SETS 4#500 KCMIL SERVICE ENTRANCE CONDUCTORS.
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
E2.0
BOILER/CHILLER MECHANICAL ROOM - DEMOLITION - SYSTEMS/HVAC POWER
LARGE SCALE -
BOILER/CHILLER MECHANICAL ROOM - NEW WORK - SYSTEMS/HVAC POWER
LARGE SCALE -
SYSTEMS/HVAC POWER
DEMOLITION & NEW WORK -
MECHANICAL ROOM -
BOILER/CHILLER
LARGE SCALE -
MDP
XDP
LDP
LB-18
MDP-7
MCC-9
LDP-14
LDP-18
MCC-8
MCC-1
MCC-2
MCC-9
MCC-3
T
45KVA
WP
J
EF-9
EX.
EF-8
EX.
F A
C P
M C
C
EXISTING HP
REMOVE
EXISTING BOILER
REMOVE
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
TO REMAIN
EXISTING AFTERCOOLER
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
TO REMAIN
EXISTING AIR COMPRESSOR
TO REMAIN
EXISTING CP
EXISTING WATER HEATER TO REMAIN
EXISTING ACP TO REMAIN
EXPANSION TANK TO REMAIN
EXISTING CHW
TO REMAIN
EX. UH
GENERAL NOTES:(THIS SHEET ONLY)
A
NOTES:(THIS SHEET ONLY)
UNSWITCHED HOT TO THESE BATTERY PACKS FOR SENSING POWER LOSS.
TWO OF THE FIXTURES SHALL HAVE INTEGRAL EMERGENCY BATTERY PACKS. PROVIDE
REPLACE WITH FOUR ACUITY MODEL CLX-L96-6000LM-SEF-FDL-MVOLT-GZ10-40K-80CRI.
REMOVE FOUR EXISTING 8 FOOT FLUORESCENT LIGHT FIXTURES FROM THIS SPACE AND 1
1 1
F
F
AND PROVIDE A NEW LABEL TO INDICATE "SPARE".
BOILER AND THE HEATING WATER PUMP CAN REMAIN IN PLACE. REMOVE EXISTING LABELS
CENTER. THE EXISTING MOTOR CONTROL CENTER BUCKETS THAT CURRENTLY SERVE THE
STARTERS, CONDUCTORS, AND CONDUIT BACK TO SERVING PANELBOARD OR MOTOR CONTROL
FOR ALL EXISTING EQUIPMENT SHOWN TO BE DEMOLISHED, REMOVE ALL DISCONNECTS,
PROVIDE LOCKABLE 30A/2P NON-FUSED DISCONNECT TO FEED THE BOILER.4
BREAKER MATCHING EXISTING PANEL AIC RATING. MAKE ALL FINAL CONNECTIONS.
#12 AWG, ƒ"C TO 1000A POWER STYLE PANELBOARD LDP. PROVIDE A NEW 20A/1P CIRCUIT
PROVIDE DEDICATED 20A, 120 VOLT CONTROL CIRCUIT TO THE NEW BOILER. ROUTE 5
MDP-7
MDP-9
3 3
PROVIDE 30A/3P FUSED DISCONNECT ON LINE SIDE OF NEW VFD.
RECONNECT ALL EXISTING BRANCH AND FEEDER CIRCUITS.
ENTRANCE CONDUCTORS IN EXISTING CONDUITS. SEE RISER DIAGRAM FOR SIZING.
REPLACE EXISTING MAIN DISTRIBUTION PANEL MDP IN PLACE. PROVIDE NEW SERVICE
P:\20066\20066e20.dgn
DATE PLOTTED
DGN FILE
04-OCT-2021
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\20066\20066e20.dgn
AS SHOWN
10.04.2021
TWT
JCW
TWT
20066
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
COA Expiration: 6.30.2022
NBP Engineers, Inc. COA#PEF000774
P E
T T
IG
R
IL
P L
A C
E M
E N
T F
O
L L
A
IV
E R
S
IT
Y
N S T
R U
C T
C U
M E
N T S
F V
O J E
P
H B
MDP
XDP
LDP
LB-18
MDP-7
MCC-9
LDP-14
LDP-18
MCC-8
MCC-1
MCC-2
MCC-9
MCC-3
T
45KVA
WP
J
EF-9
EX.
EF-8
EX.
F A
C P
M C
C
TO REMAIN
EXISTING AFTERCOOLER
CHEMICAL FEED TO REMAIN
EXISTING CHW BYPASS
EXISTING PUMP GAUGES TO REMAIN
TO REMAIN
EXISTING AIR COMPRESSOR
TO REMAIN
EXISTING CP
EXISTING WATER HEATER TO REMAIN
EXISTING ACP TO REMAIN
EXPANSION TANK TO REMAIN
EXISTING CHW
TO REMAIN
EX. UH
BLR-1
NEW
NEW VFD
NEW ACP
HP-1
NEW
HP-2
NEW
| 20066aCov |
| 20066p00 |
| References |
| tb, 20066tb.dgn |
| 20066p20 |
| References |
| tb, 20066tb.dgn |
| afp1, 20066aX1.dgn |
| afp2, 20066aX1.dgn |
| existing, 20066p20.dgn |
| 20066m20.dgn |
| 20066m00 |
| References |
| tb, 20066tb.dgn |
| 20066m20 |
| References |
| tb, 20066tb.dgn |
| afp1, 20066aX1.dgn |
| afp2, 20066aX1.dgn |
| existing, 20066m20.dgn |
| 20066m40 |
| References |
| tb, 20066tb.dgn |
| 20066m50 |
| References |
| tb, 20066tb.dgn |
| 20066e00 |
| References |
| tb, 20066tb.dgn |
| panel1-Excel.dgn |
| Ref, panel1-Excel.dgn |
| 20066e20 |
| References |
| tb, 20066tb.dgn |
| afp1, 20066aX1.dgn |
| afp2, 20066aX1.dgn |
| existing, 20066e20.dgn |
| new Hvac equip, 20066m20.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Sign In Sheet | — | |
| ITB-Bid Requirements | — | |
| Addendum 1 | — | |
| Notice of Award | — | |
| Award Information | — | |
| Project Manual | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .