Project Description MT BOR NPS 2021(1).pdf
PDF 167 KB Posted
- Solicitation number
- 69056723B000012
About this file
This project description outlines a road improvement project on Yellowtail Dam Area roads in Montana. The work includes asphalt concrete pavement, asphalt pavement milling, asphalt concrete pavement patching, chip seal, removal of guardrail, installation of new guardrail, striping, and micro surfacing across 37.6 miles of roads southwest of Billings. The estimated price range for the work is between $10-15 million and work must be completed in the fall/winter of 2024. The solicitation number for the related federal contract opportunity is 69056723B000012 and is being issued by the Department of Transportation Federal Highway Administration for the MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim Letter_Yellowtail Dam Area Roads Improvement.pdf | ||
| MT BOR NPS 2021(1) - PRE-AD PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT BOR NPS 2021(1), Yellowtail Dam Area Roads Improvement
This work consists of: Asphalt concrete pavement, asphalt pavement milling, asphalt concrete pavement patching, chip seal, removal of guardrail, guardrail, striping, micro surfacing.
Project Location: 88 miles SW of Billings. Big Horn and Carbon Montana
Project Length: 37.6 Miles
Estimated Price Range: Between $10 and $15 Million
Tentative Fixed Completion Date: Fall/Winter 2024
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
O n e S ch ed u le
S ch
N am e
A
A d d it io n al
N am e
O p ti o
X
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes
153 Contractor Quality Control and Assurance (yes/no) Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes
DIVISION 200 – Earthwork
203 Removal of Structures & Obstructions (structures, demolition) Asphalt Guardrail
9398.5
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
302 Minor Crushed Aggregate 115 e S ch ed
N
A d d it io n al
N am e
O p ti
303 Road Reconditioning 1320
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 6546
407 Chip Seal Chip seal, type 1c Emulsified asphalt
625474
13710
409 Micro Surfacing 17570
412 Asphalt Tack Coat (asphalt surface treatment) 35
413 Asphalt Pavement Milling 40489
414 Asphalt Pavement Crack Sealing & Filling Cracks, cleaning and filling Cracks, cleaning and sealing
14858 33.5
1.09
418 Asphalt Concrete Pavement Patching Asphalt concrete pavement patch, type 1 (A) Asphalt concrete pavement patch, type 1 (B) Asphalt concrete pavement patch, type 2
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction
DIVISION 600 – Incidental Construction
617 Guardrail Guardrail system MGS, type 2, class A wood posts Terminal section, type MGS tangent (TL-2) Terminal section, type MGS tangent (TL-3) Terminal section, type MGS -BAT Impact attenuator (crash cushion)
622 Rental Equipment (yes/no) Yes Yes
623 General Labor (yes/no) Yes Yes e S ch ed
N
A d d it io n al
N am e
O p ti
633 Permanent Traffic Control (traffic control devices) Sign system Delineator, type flexible
634 Permanent Pavement Markings (traffic pavement markings) Pavement markings, type B, solid (white) Pavement markings, type B, solid (yellow) Pavement markings, type B, broken (yellow) Pavement markings, type B, straight arrow Pavement markings, type B, straight/turn arrow combination Pavement markings, type B, accessibility symbol
709851 657604 125498
635 Temporary Traffic Control – Flagger 3520
635 Temporary Traffic Control – Pilot Car 300
635 Temporary Traffic Control – ???
Barricade type 3 Cone Portable changeable message sign Pavement markings Construction sign Traffic control supervisor
175719
File details come from the government source that posted it. Updated .