PROJECT DESCRIPTION_CO NP MULTI PMS(2).pdf

PDF 124 KB Posted

Attached to
CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2 Federal contract opportunity
Solicitation number
69056723R000012
Issued by
Department of Transportation Federal Highway Administration

About this file

This document provides a project description and specifications for a pavement preservation project across multiple National Park sites in Colorado and Wyoming. The work consists of patching, crack sealing, and resurfacing approximately 74.4 miles of asphalt surfaces and includes tasks such as roadway excavation, embankment construction, placed riprap, full depth reclamation, asphalt concrete paving, fog sealing, chip sealing, microsurfacing, tack coating, cleaning and sealing cracks, asphalt patching, installing culverts and drainage structures, constructing sidewalks, seeding, rumble strips, pavement markings, signs, and temporary traffic control. The estimated price range for the project is $7 million to $10 million. The related federal contract opportunity is a pre-solicitation for project CO NP MULTI PMS(2) issued by the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Other files attached to CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2, newest first.
File Type Posted
CO NP MULTI PMS(2) Pre-Ad Plans.pdf PDF
Prelim Letter_CO NP MULTI PMS(2).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2

Mesa, Montrose, and Teller Counties, Colorado

Goshen County, Wyoming

The work consists of patching, crack sealing and resurfacing of asphalt surfaces throughout 4 National Park sites.

Project length: 74.4 Miles

Tentative Fixed Completion Date: Summer 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $7 million to $10 million

Location: This project is located approximately 30 Miles E of Montrose, CO, 5

Miles S of Grand Junction, CO, 5 Miles S of Florissant, CO and 5 miles W of Fort

Laramie, WY, respectively.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O n e S ch ed u le

S ch

N am e

B as e

DIVISION 150 – Project Requirements

151 Mobilization (yes/no) Yes

152 Construction Survey & Staking (yes/no) No

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

DIVISION 200 – Earthwork

203 Removal of Curb and Gutter, Concrete 250 LNFT

203 Removal of Sidewalk, Concrete 190 SQYD

204 Roadway Excavation 170 CUYD

204 Embankment Construction 400 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Placed Riprap, Method A, Class 2 35 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 90 TON

304 Full Depth Reclamation, Method 2, 6-inch Depth 2,800 SQYD

DIVISION 400 – Asphalt Pavements and Surface Treatments

403 Asphalt Concrete Pavement, Type 1 460 TON

406 Fog Seal 95 TON

O n e S ch ed u le

S ch

N am e

B as e

407 Chip Seal, Type 1C 140,000 SQYD

407 Emulsified Asphalt 257 TON

407 Blotter 40 TON

409 Micro Surfacing, Type 2 51,000 TON

409 Micro Surfacing, Type 3 330,000 TON

412 Tack Coat 1.3 TON

414 Cracks, Cleaning and Filling 600 LNFT

414 Cracks, Cleaning and Sealing 31 MILE

418 Asphalt Concrete Pavement Patch, Type 1 1,200 SQYD

418 Asphalt Concrete Pavement Patch, Type 2 8,000 SQYD

DIVISION 600 – Incidental Construction

602 24-inch Pipe Culvert 120 LNFT

602 18-inch Equivalent Diameter Arch or Elliptical Pipe Culvert 40 LNFT

602 End Section for 24-inch Pipe Culvert 1 EACH

602 End Section for 18-inch Equivalent Diameter Arch or Elliptical Pipe Culvert 2 EACH

602 Elbow, 24-inch 2 EACH

604 Inlet (Denver No. 16) 1 EACH

606 Pipe Anchor Assembly, 24-inch 8 EACH

615 Sidewalk, Concrete 230 SQYD

622 Dump Truck, 10 Cubic Yard Minimum Capacity 80 HOUR

622 Backhoe Loader, 4 Cubic Foot Minimum Rated Capacity Bucket, 18-inch Width 80 HOUR

622 Vacuum Sweeper 80 HOUR

623 General Labor 80 HOUR

625 Seeding, Dry Method 100 SQYD

633 Rumble Strip (Centerline) 1300 LNFT

633 Rumble Strip 60 SQYD

634 Pavement Markings (Type B) 1,375,000 LNFT

634 Pavement Markings, Symbols (Type B) 70 EACH

DIVISION 600 – Incidental Construction (cont’d.)

634 Recessed Pavement Marker, Bi-Directional Reflective 120 EACH

635 Temporary Traffic Control, Cone 440 EACH

635 Temporary Traffic Control, Portable Changeable Message Sign 4 EACH

635 Temporary Traffic Control, Pavement Markings 165,000 LNFT

635 Temporary Traffic Control, Construction Sign 400 SQFT

635 Temporary Traffic Control, Flagger 4,800 HOUR

635 Temporary Traffic Control, Pilot Car 200 HOUR

635 Temporary Traffic Control, Traffic Control Supervisor 114 DAY