Prelim Letter_CO NP MULTI PMS(2).pdf
PDF 134 KB Posted
- Attached to
- CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2 Federal contract opportunity
- Solicitation number
- 69056723R000012
About this file
This document provides notice of a subcontracting opportunity and includes preliminary plans for the federal contract opportunity CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2. The project will consist of preserving selected parking areas and approach roads through pavement inlay, microsurfacing and chip seal applications on routes and parking lots within four national parks located in Colorado and Wyoming. Work will include roadway milling, pavement inlay, minor concrete work, culvert repair, patching, chip sealing and pavement marking. The solicitation number is 69056723R000012 and will be issued in winter 2023/2024 through the Department of Transportation Federal Highway Administration Western Federal Lands Highway Division MATOC program. Prime contractors must be pre-awarded under the new Western Pavement Preservation MATOC. Technical questions should be directed to the identified email, and general questions directed to the provided phone number or email.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_CO NP MULTI PMS(2).pdf | ||
| CO NP MULTI PMS(2) Pre-Ad Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
SPECIAL NOTICE: Subcontracting opportunity and preliminary plans
RE: CO NP MULTI PMS(2)
Pavement Preservation Colorado Phase 2
Solicitation No. 69056723R000012
THIS “TASK ORDER PRESOLICITATION” IS SOLELY FOR THE CONTRACTORS
THAT WILL BE AWARDED UNDER THE ADVERTISED WESTERN PAVEMENT
PRESERVATION MATOC. HERE IS THE LINK TO THE NEW MATOC
SOLICITATION ON SAM.GOV:
https://sam.gov/opp/01433dd3b8814dcca1edb4dc921e6e61/view.
THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE
UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY
PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED
FROM THE PRIME CONTRACTORS AWARDED A CONTRACT UNDER THE NEW
WESTERN PAVEMENT PRESERVATION MATOC.
The attached preliminary plans are being furnished to aid prospective Offerors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After November 1, 2023 access will be weather dependent; contact the parks at links below for current road conditions:
• Black Canyon Of The Gunnison National Park (U.S. National Park Service) (nps.gov)
• Colorado National Monument (U.S. National Park Service) (nps.gov)
• Florissant Fossil Beds National Monument (U.S. National Park Service) (nps.gov)
• Fort Laramie National Historic Site (U.S. National Park Service) (nps.gov)
No Federal Highway Administration personnel will be available for show-me tours.
The Project will consist of one Base Schedule. The base project will preserve selected parking areas and approach roads with the application of pavement inlay, microsurfacing and chip seal on selected routes and parking lots within Black Canyon of the Gunnison National Park (BLCA), Colorado National Monument (COLM) and Florissant Fossil Beds National Monument (FLFO) in Colorado, as well as Fort Laramie National Historic Site (FOLA) in Wyoming. See the
Description of Work document for additional details.
July 25, 2023 https://sam.gov/opp/01433dd3b8814dcca1edb4dc921e6e61/view https://www.nps.gov/blca/index.htm https://www.nps.gov/colm/index.htm https://www.nps.gov/flfo/index.htm https://www.nps.gov/fola/index.htm
SPECIAL NOTICE: Subcontracting opportunity and preliminary plans
Project Location and Type of Work - Construction will include roadway milling, pavement inlay, minor concrete work, culvert repair, patching, chip sealing application and pavement marking. Contractor will also provide appropriate traffic control and phasing to minimize impacts to park visitors and operations.
Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Solicitation documents - Documents will be available during the winter of 2023/2024. Please monitor the SAM site for actual date of solicitation release (www.sam.gov). To receive automatic notification through SAM, you must login and select the “Follow” feature.
Thank you for your interest in this project.
mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov http://www.sam.gov/
File details come from the government source that posted it. Updated .