CO NP MULTI PMS(2) Pre-Ad Plans.pdf
PDF 9 MB Posted
- Attached to
- CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2 Federal contract opportunity
- Solicitation number
- 69056723R000012
About this file
This document package includes plans, specifications, and supporting documentation for a proposed pavement preservation project across multiple national parks located in Colorado. The project involves resurfacing and repair work on roadways and parking areas at Black Canyon of the Gunnison National Park, Colorado National Monument, Florissant Fossil Beds National Monument, and Fort Laramie National Historic Site. The plans outline the proposed work locations, pavement treatments including microsurfacing, chip sealing, and full depth reclamation, drainage improvements, signage and pavement marking requirements. Supporting documentation includes summaries of quantities, temporary traffic control measures, and standard construction details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_CO NP MULTI PMS(2).pdf | ||
| Prelim Letter_CO NP MULTI PMS(2).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANAGER
PLANS FOR PROPOSED PROJECT
SPECIFICATION:
TYPE OF CONSTRUCTION:
N.T.S.
K. GRAY
PLANS PREPARED BY
FOR
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
Resurfacing
Projects, FP-14 of Roads and Bridges on Federal Highway
Standard Specifications for Construction
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
APPROVED:
A.1
Western Federal Lands Highway Division
Chief of Engineering
Project Locations
MONTANA
IDAHO
SOUTH DAKOTA
COLORADOUTAH
Casper
CHEYENNE
Sheridan
Jackson
Rock
Springs
Riverton
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
Gillette
Cody
Thermopolis
Worland
Rawlings
Greeley
Sterling
Limon
Pueblo
Walsenburg
Cortez
Durango
DENVER
COLORADO
SPRINGS
Steamboat
Springs
GRAND
WYOMING
NEBRASKA
OKLAHOMA
NEW MEXICO
UTAH KANSAS
Trinidad
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
JUNCTION
Gunnison
Montrose
WYOMING KEY MAPS
COLORADO AND
DATE:
DATE:
DATE:
DATE:
DATE:
Black Canyon of the Gunnison National Park Superintendent, Colorado National Monument Superintendent, Florissant Fossil Beds National Monument Superintendent, Fort Laramie National Historic Site Superintendent, See A.2 for continuation of Index to Sheets
LENGTH BASE 74.4 MILES & PARKING AREAS
PMIS Pkg No.: 326334, 326367, 326321, 326368
FORT LARAMIE NATIONAL HISTORIC SITE (FOLA)
NATIONAL MONUMENT (FLFO)
FLORISSANT FOSSIL BEDS
COLORADO NATIONAL MONUMENT (COLM)
NATIONAL PARK (BLCA)
BLACK CANYON OF THE GUNNISON
NATIONAL PARK SERVICE
U.S. DEPARTMENT OF THE INTERIOR
GOSHEN COUNTY, WYOMING
MESA, MONTROSE, AND TELLER COUNTIES, COLORADO
PMIS PKG. NO 326334, 326367, 326321, 326368
CO NP MULTI PMS(2)
COLORADO PHASE 2
PAVEMENT PRESERVATION
STATE PROJECT
NUMBER
SHEET
CO
C O P
H A
S E A ti tl e s h e e t.
d g n
NP MULTI PMS(2)
J a n
A
M PRELIMINARY - NOT FOR CONSTRUCTION
G SHEETS INDEX
G.4 - G.16
G.3
G.2
G.1
DRAINAGE DETAILS
PARTIAL PLAN
FLFO VISITOR CENTER PARKING LOT
RIMROCK DRIVE
CULVERT REPAIRS ROUTE 0010
AND DRAINAGE
TABULATION OF CULVERT REPAIRS
PRELIMINARY - NOT FOR CONSTRUCTION
TYPICAL SECTIONS
NOTE:
C.1
NO SCALE
Construction Limits Construction Limits
Grade Varies Grade Varies
Slope
Variable
Var ies
Varies
MICRO SURFACING
TYPICAL SECTION
Existing asphalt surface
For Roadway Width or Parking Lot Dimensions
See Surfacing Tabulation Sheets
Slope
Variable
Construction Limits onstruction LimitsC
Var ies
Varies
CHIP SEAL
TYPICAL SECTION
Grade varies Grade varies Fog Seal
Existing asphalt surface
For Roadway Width or Parking Lot Dimensions
See Surfacing Tabulation Sheets
Chip seal, Type 1C
CL
CL
Existing pavement section
Emulsified Asphalt for chip seal.
adjacent asphalt curb and paved ditch where present,
4. Fog seal pavement edge to pavement edge, including locations.
micro-surfacing or chip sealing. See section D for
3. Patch surface and seal/fill cracks prior to operations.
other appurtenances during all surface treatment manholes, snow pole sleeves, water valves, and all concrete and cobble stone islands, stone wall, curbs, concrete curb & gutter, concrete barriers,
2. Protect project timber curbs, asphalt curbs, stone width and extent of asphalt surface treatment.
1. Refer to Surfacing Tabulation Sheet D.1-D.12 for
, Type 2 or 3Micro Surfacing
STATE PROJECT
NUMBER
SHEET
CO
C C
T y p ic a l S e c ti o n .d g n
NP MULTI PMS(2)
D e c
P
M
NPS PMIS NO.: 326334, 326367, 326321, 326368
PRELIMINARY - NOT FOR CONSTRUCTION
TYPICAL SECTIONS
NO SCALE
C.2
Slope
Variable
Construction Limits onstruction LimitsC
Var ies
Varies
Grade varies Grade varies
For Roadway Width or Parking Lot Dimensions
See Surfacing Tabulation Sheets
FLFO ROUTES 0901 AND 0902
FULL DEPTH RECLAMATION
Method 2, 6-inch depth
Full depth reclamation, Existing asphalt surface
Asphalt concrete pavement, Type 1
3-inch Overlay directed by CO.
repairs at Route 0900) at a 1:3 V:H slope as
4. Add shouldering material (conserved from drainage
3. Fog seal pavement edge to pavement edge.
operations.
other appurtenances during all surface treatment manholes, snow pole sleeves, water valves, and all concrete and cobble stone islands, stone wall, curbs, concrete curb & gutter, concrete barriers,
2. Protect project timber curbs, asphalt curbs, stone width and extent of asphalt surface treatment.
1. Refer to Surfacing Tabulation Sheet D.1-D.5 for
STATE PROJECT
NUMBER
SHEET
CO
C C
T y p ic a l S e c ti o n .d g n
NP MULTI PMS(2)
D e c
P
M
NPS PMIS NO.: 326334, 326367, 326321, 326368
PRELIMINARY - N
OT FOR CONSTRUCTION
Greater than 1"
CRACK SEALING AND FILLING
CRACK SEALING AND FILLING
ASPHALT PAVEMENT
C.3 with existing surface
Strike off material to flush flush with the existing surface
Ensure all remaining overband is
CRACK SEALING CRACK FILLING
" to 1"4 crack sealant
Seal crack with hot applied with existing surface
Fill crack with pre-formulated mastic material flush
(22' width).
2. Parking area crack sealing converted to units of miles
1. Seal and fill cracks at locations designated by the CO.
STATE PROJECT
NUMBER
SHEET
CO
C
C r a c k S e a li n g a n d F il li n g .d g n
NP MULTI PMS(2)
D e c
P
M
NPS PMIS NO.: 326334, 326367, 326321, 326368
to a depth of 10" base and subgrade material Remove damaged pavement, pavement Existing base course Existing
NOTE:
FULL DEPTH PATCH TYPE 2
FULL DEPTH PATCH TYPE 1
to a depth of 4" base and subgrade material Remove damaged pavement, pavement Existing base course Existing
Fog seal
FOOTNOTE:
4" Asphalt concrete, Type II
C.4
PATCH TYPE 1 & 2 DETAILS
ASPHALT CONCRETE PAVEMENT
NO SCALE
conditions encountered at time of construction.
1. Extent of patch to be determined by the CO based on
[1][1]
V a r ie s
V a r ie s
Pay Limits
Fog seal
4" Asphalt concrete, Type II Stabilization geogrid [1]
Pay Limits
6" crushed aggregate bottom of crushed aggregate and existing base course.
For Type 1 patch, place stabilization geogrid between
STATE PROJECT
NUMBER
SHEET
CO
C C p a tc h t y p e a n d .d g n
NP MULTI PMS(2)
D e c
P
M
NPS PMIS NO.: 326334, 326367, 326321, 326368
30202-
30402-5300
40301-
40601-
40702-
40711-
40901-
40901-3000
41201-
41401-
41402-
41801-
41801-
FT FT
TON SQYD TON TON SQYD TON SQYD SQYD TON LNFT MILE SQYD SQYD
0010 South Rim Drive 84624 1.85 7.66 30,677 25.1 55.1 85,555 153.3 5.81 132 730
0010 (1) Approach 84624 0.1 178 0.3 0.01
0200 South Rim Campground Road 84650 0.00 0.31 1,637 22.5 2.6 4,093 7.3 0.31 436
0205 Campground Loop A 90812 0.00 0.24 1,267 12.9 1,816 0.24 318
0206 Campground Loop B 90814 0.00 0.24 1,267 12.8 1,802 0.24 23
0207 Campground Loop C 90815 0.00 0.23 1,214 12.2 1,646 0.23
East Portal Campground Access
Road 90838 0.00 0.14 739 20.0 1,642
0400 South Rim Residence Road 84654 0.00 0.80 0.3 469 0.8 0.80
0901 High Point Parking 72382 1,817 0.14 72
0902 Sunset View Parking 72377 855 0.07 36
0903 Dragon Point Parking 72375 247 0.02
0904 Cedar Point Overlook 72370 332 0.03
0905 Painted Wall View Parking 72367 260 0.02
0906 Chasm View Overlook 72364 666 0.05
0907 Devil's Overlook 72363 311
0908 Rock Point Parking 72344 343 0.03
0909 Cross Fissures Overlook 72320 363 0.03
0910 Pulpit Rock Overlook 72281 410
0912 South Rim Residence Area 84657 662 0.05 42
South Rim Campground Road
Parking 84659 0.4 663 1.2 0.05
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton)
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]BLCA ROADS
3,086
3,264
3,686
5,958
5,968
2,984
2,344
5,994
2,802
NOTE: Protect curbs, stone curbs, curb and gutter, inlets, grates, rock walls, cattle guards, manhole covers, concrete swales, wheel stops, concrete bridge, sidewalks, buildings, valves, etc.
12/20/22 2:19 PM NPS PMIS No.
TABULATION OF
SURFACING
QUANTITIES
BLACK CANYON OF THE
GUNNISON NATIONAL
PARK
326334
13,172 00
Material Application Rates and Weights Used for Estimating Purposes
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
0.0 0 8.13 132 1,657SHEET TOTAL 0 58.5 90,958 162.9
Begin work at MP 1.85
16,356
7,692
2,221
Parking Areas
1,600
End work after Route 09124,224
MILES SQFT
TACK
COAT
CRACKS,
CLEANING
AND FILLING
CRACK,
CLEANING
AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 2
FOG
SEAL
CHIP SEAL,
TYPE 1C
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
MICRO
SURFACING,
TYPE 3
BID ITEM NUMBER
Remarks
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T
H ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
FULL DEPTH
RECLAMATION
, METHOD 2, 6-
INCH DEPTH
ROADWAY
AGGREGATE,
METHOD 2
PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) D.1
SURFACING TABULATION SHEET
STATE
30402-5300
40301-
40601-
40702-
40711-
40901-
40901-3000
41201-
41401-
41402-
41801-
41801-
FT FT
TON SQYD TON TON SQYD TON SQYD SQYD TON LNFT MILE SQYD SQYD
0010 Rimrock Drive 80034 0.00 22.48 118,694 23.1 5.9 304,648 19.00 871 3,978
0010 (7) Pullouts, (1) Approach 80034 1,167 0.09
0011 East Glade Park Road 90622 0.00 0.73 3,854 23.2 9,935
0100 West Glade Park Road 90754 0.00 0.13 686 23.2 1,768 107
0100 (1) Pullout 90754 83
0200 Saddlehorn Loop Road 91031 0.00 0.94 4,963 17.2 6.1 9,485 17.0 43
0200 (1) Pullout 91031 0.1 167 0.3
0201A Saddlehorn Campground Loop A 90786 0.00 0.22 1,162 13.6 1.1 1,756 3.1 13
0201A (2) Pullouts 90786 0.1 150 0.3
0201B Saddlehorn Campground Loop B 103234 0.00 0.28 1,478 12.5 1.3 2,053 3.7
0201B (2) Pullouts 103234 0.1 117 0.2
0201CA
Z
Saddlehorn Campground Loop C
Spur A 103236 0.00 0.04 211 9.8 0.1 230 0.4
0201CB
Z
Saddlehorn Campground Loop C
Spur B 103236 0.00 0.03 158 8.8 0.1 154 0.3
0201CZ Saddlehorn Campground Loop C 103236 0.00 0.26 1,373 9.9 1.0 1,510 2.7 13
0202 Devil's Kitchen Picnic Area Road 90755 0.00 0.11 581 19.8 0.8 1,278 2.3
Saddlehorn
Maintenance/Residence Road 90756 0.00 0.33 1,742 18.1 2.3 3,503 6.3 0.33 314
0400 (3) Driveways 90756 0.1 211 0.4 0.02
0402 East Shop Road 90763 0.00 0.09 475 18.4 971
0403AZ Stone House Turn Around 113198 0.00 0.04 211 10.0 234 76
0403BZ Stone House Service Road 113198 0.00 0.02 121 9.0 121 53
0403BZ (2) Pullouts 113198 69
0405 Visitor Center Service Road 113198 0.00 0.04 211 11.0 258
0900 Visitor Center Parking 90985 2,797 0.22
0901 Stone House Parking 90990 0.1 210 0.4
0902 Saddlehorn Picnic Area Parking 90995 3.1 4,825 8.6 116
0903 Otto's Trail Parking 90993 386
0904AZ
Window Rock Nature Trail
Parking A 90994 0.3 397 0.7
0904BZ
Window Rock Nature Trail
Parking B 90994 0.1 226 0.4 0.02
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton)
12/29/22 8:02 AM\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]COLM ROADS 1
NOTE: Protect curbs, stone curbs, curb and gutter, inlets, grates, rock walls, cattle guards, manhole covers, concrete swales, wheel stops, concrete bridge, sidewalks, buildings, valves, etc.
26,272
326367NPS PMIS No.
47.1 318,5720 22.7
Parking Areas
Material Application Rates and Weights Used for Estimating Purposes
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
0.0 0 19.68 871 4,713
TABULATION OF
SURFACING
QUANTITIES
COLORADO NATIONAL
MONUMENT
SHEET TOTAL 0 3,865
2,033
43,428
3,476
3,570
25,173
1,892
Fog seal paved ditch
10,500
1,500
1,350
1,050
Stop work at end of Route 0925B
1,900
CHIP SEAL,
TYPE 1C
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
MICRO
SURFACING,
TYPE 3
MILES SQFT
TACK
COAT
CRACKS,
CLEANING
AND
FILLING
CRACK,
CLEANING
AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 2
FOG
SEAL
BID ITEM NUMBER
Remarks
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T
H ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
ROADWAY
AGGREGATE,
METHOD 2
FULL DEPTH
RECLAMATION
, METHOD 2, 6-
INCH DEPTH
SURFACING TABULATION SHEET
STATE PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) D.2
30402-5300
40301-
40601-
40702-
40711-
40901-
40901-3000
41201-
41401-
41402-
41801-
41801-
FT FT
TON SQYD TON TON SQYD TON SQYD SQYD TON LNFT MILE SQYD SQYD
0906 Book Cliff Overlook Parking 90997 0.3 448 0.8
Independence Monument View
Parking 90998 1,123 0.09 4
0908 Grand View Parking 90999 617
0909 Coke Ovens Overlook Parking 91000 620
0910 Highland View Parking 91001 655 0.05 120
0911 Upper Ute Canyon Parking 91002 320 0.02 9
0912 Fallen Rock Overlook Parking 91003 420 0.03
0913 Ute Canyon Overlook Parking 91004 318 0.02
0914 Red Canyon Overlook Parking 91005 612 0.05
0915 Cold Shivers Parking 91006 548
0916 Upper Serpent'S Trail Parking 91007 209
0917 Lower Serpent'S Trail Parking 91008 1,013
Devil's Kitchen Picnic Area
Parking 91009 1.1 1,697 3.0
0919 Artist's Point Parking 91010 726
0920 Fruita Canyon View Parking 91011 282 0.02
0921 Distant View Parking 91012 428
0922 Historic Trails View Parking 91013 146
0923 Balanced Rock Parking 91014 119
0924 Redlands View Parking 91015 280
Upper Monument Canyon Trail
Parking 91016 249
0927 Residence Parking Area 103310 630
0928 East Entrance Parking 91017 272
0929 West Entrance Parking 91018 233
0930 Monument Canyon View Parking 91019 363
0931 Ute Canyon Trail Parking 91020 236 0.02 5
Upper Liberty Cap Trail Parking
Area 91021 799 0.06 18
0933 East Entrance Sign Parking 103313 170
0937 Overlook At Mp 1.94 N/A 142
0938 Campground Loop C Parking N/A 59
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton)
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]COLM ROADS 2
NOTE: Protect curbs, stone curbs, curb and gutter, inlets, grates, rock walls, cattle guards, manhole covers, concrete swales, wheel stops, concrete bridge, sidewalks, buildings, valves, etc.
2,124
7,188
0 0
5,512
1,880
15,274
2,535
1,318
1,067
2,520
12/20/22 2:19 PM
2,093
11,589
1,534
1,275
NPS PMIS No. 326367
Material Application Rates and Weights Used for Estimating Purposes
TABULATION OF
SURFACING
QUANTITIES
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
COLORADO NATIONAL
MONUMENT
0 0.0 0 0.36 0 156SHEET TOTAL 0 1.4 2,145 3.8
3,783
5,673
2,450
3,268
2,240
3,854
9,117
6,533
4,931
2,865
ROADWAY
AGGREGATE,
METHOD 2
FULL DEPTH
RECLAMATION
, METHOD 2, 6-
INCH DEPTH
MILES SQFT
TACK
COAT
CRACKS,
CLEANING
AND FILLING
CRACK,
CLEANING
AND
SEALING
BID ITEM NUMBER
Remarks
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T
H ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 2
FOG
SEAL
CHIP SEAL,
TYPE 1C
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
MICRO
SURFACING,
TYPE 3
SURFACING TABULATION SHEET
STATE
5,899
2,876
PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) D.3
4,028
Parking Areas
10,105
5,552
5,578
30402-5300
40301-
40601-
40702-
40711-
40901-
40901-3000
41201-
41401-
41402-
41801-
41801-
FT FT
TON SQYD TON TON SQYD TON SQYD SQYD TON LNFT MILE SQYD SQYD
0900 Visitor Center Parking 26224 9,892 450 5
0901 Hornbek Homestead Parking 26254 4.0 1,361 222.3 0.6
0902 Barksdale Picnic Area Parking 26263 10.0 1,287 210.2 0.6
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
139.0 = Aggregate Base (lbs/cuft) 233.0 = Tack Coat (Gal./ton)
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]FLFO ROADS
PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) D.4
SURFACING TABULATION SHEET
STATE
FOG
SEAL
CHIP SEAL,
TYPE 1C
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
MICRO
SURFACING,
TYPE 3
BID ITEM NUMBER
Remarks
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T
H ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
ROADWAY
AGGREGATE,
METHOD 2
FULL DEPTH
RECLAMATION
, METHOD 2, 6-
INCH DEPTH
CRACK,
CLEANING
AND
SEALING
MILES SQFT
TACK
COAT
CRACKS,
CLEANING
AND FILLING
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH,
TYPE 2
89,024 Aggregate for drainage repairs
12,249 FDR with 3" overlay & shouldering
11,584 FDR with 3" overlay & shouldering
Parking Areas
SHEET TOTAL 432.5 0.0 0 0.014.0 2,648 0.00
Material Application Rates and Weights Used for Estimating Purposes
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
09,892 0 1.2 450 5
TABULATION OF
SURFACING
QUANTITIES
FLORISSANT FOSSIL
BEDS NATIONAL
MONUMENT
3263211/26/23 1:51 PM NPS PMIS No.
NOTE: Protect curbs, stone curbs, curb and gutter, inlets, grates, rock walls, cattle guards, manhole covers, concrete swales, wheel stops, concrete bridge, sidewalks, buildings, valves, etc.
30402-5300
40301-
40601-
40702-0300
40711-
40901-2000 40901-3000
41201-
41401-
41402-
41801-
41801-
FT FT
TON SQYD TON TON SQYD TON SQYD SQYD TON LNFT MILE SQYD SQYD
0010 Main Entrance Road 41333 0.00 0.31 1,637 20.3 2.4 3,692 6.6 0.31
0200 Loop Road 42752 0.00 0.24 1,267 17.3 1.6 2,435 4.4 0.24 59
0200 (1) Pullout 42752 0.1 222 0.4 0.00
0402 Maintenance Road 0.00 0.48 2,534 16.1 2.9 4,533 8.1 4,533 0.48 220
0900 Visitor Center Parking 41335 5,135 9.2 5,135 0.40
0901 Picnic Area Parking 66784 875 1.6 875 0.07
0904 Handicap Parking 84600 426 0.8 426 0.03 133
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton)
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]FOLA ROADS
PROJECT TOTAL 14.0 2,648 432.5 89.6 136,693 244.9 49,487
TABULATION OF
SURFACING
QUANTITIES
FORT LARAMIE
NATIONAL HISTORIC
SITE
TACK
COAT
CRACKS,
CLEANING
AND
FILLING
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
MICRO
SURFACING,
TYPE 3
Remarks
NOTE: Protect curbs, stone curbs, curb and gutter, inlets, grates, rock walls, cattle guards, manhole covers, concrete swales, wheel stops, concrete bridge, sidewalks, buildings, valves, etc.
Do not treat concrete bridge deck
318,572 1.2 450 29.7 1,008 6,938
1/26/23 1:51 PM NPS PMIS No. 326368
Material Application Rates and Weights Used for Estimating Purposes
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
0.0 0 1.53 0 4120SHEET TOTAL 0 7.0 17,318 31.1 10,969 00
2,000
7,879
3,831
Parking Areas
46,211 Cape Seal (Micro 2 over a Chip
Seal)
Cape Seal (Micro 2 over a Chip
Seal)
Cape Seal (Micro 2 over a Chip
Seal)
Use Micro 2 as a leveling course prior to the chip seal
CRACK,
CLEANING
AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
FOG
SEAL
CHIP SEAL,
TYPE 1C
MILES SQFT
ROADWAY
AGGREGATE,
METHOD 2
FULL DEPTH
RECLAMATION
, METHOD 2, 6-
INCH DEPTH
BID ITEM NUMBER
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T
H ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
SURFACING TABULATION SHEET
STATE PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) D.5
/22
/20
NPS PMIS NO.: 326334
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.6
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
BL
CA
KE
Y M
AP
.m xd
NOTE:
1. See Road Inventory Program (RIP) data for Black Canyon of the Gunnison National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 2 4Miles
AREA
MAP 1
AREA
MAP 2
AREA
MAP 3
AREA
MAP 4
AREA MAP 5
BLACK CANYON
OF THE GUNNISON
NATIONAL PARK
KEY MAP
East Portal Road
To Montrose
8.4 miles US Highway 50
Hig hw ay
Gunnison River
ROUTE 0912
SOUTH RIM
RESIDENCE AREA
ROUTE 0911
TOMICHI POINT
PARKING
(NO WORK)
(NPS 3R PROJECT)
ROUTE 0913
SOUTH RIM
MAINTENANCE AREA
(NO WORK)
ROUTE 0924
SOUTH RIM RESIDENCE
ROAD PARKING
(NO WORK)
ROUTE 0914
SOUTH RIM CAMPGROUND
ROAD PARKING
STAGING AREA
(SERVICE ROAD
ACCESS - NOT PAVED)
ROUTE 0400
SOUTH RIM
RESIDENCE ROAD
(NO WORK)
ROUTE 0207
CAMPGROUND LOOP C
ROUTE 0206
CAMPGROUND LOOP B
ROUTE 0205
CAMPGROUND LOOP A
ROUTE 0200
SOUTH RIM CAMPGROUND ROAD
ROUTE 0010
SOUTH RIM DRIVE
(NO WORK MP 0.00 TO
MP 1.85)
MP 1.0
ROUTE 0400
SOUTH RIM
RESIDENCE ROAD
/28
/20
NPS PMIS NO.: 326334
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.7
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
BL
CA
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Black Canyon of the Gunnison National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
BLACK CANYON
OF THE GUNNISON
NATIONAL PARK
AREA MAP 1
ROUTE 0900
SOUTH RIM VISITOR
CENTER PARKING AREA
(NO WORK)
(NPS 3R PROJECT)
ROUTE 0907
DEVIL'S OVERLOOK
ROUTE 0908
ROCK POINT
PARKING
ROUTE 0909
CROSS FISSURES
OVERLOOK
ROUTE 0910
PULPIT ROCK
OVERLOOK
ROUTE 0010
SOUTH RIM DRIVE
MP 2.0
MP 3.0
MP 4.0
/22
/20
NPS PMIS NO.: 326334
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.8
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
BL
CA
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Black Canyon of the Gunnison National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
BLACK CANYON
OF THE GUNNISON
NATIONAL PARK
AREA MAP 2
ROUTE 0907
DEVIL'S OVERLOOK
MP 5.0
ROUTE 0905
PAINTED WALL
VIEW PARKING
ROUTE 0906
CHASM VIEW OVERLOOK
ROUTE 0010
SOUTH RIM DRIVE
/22
/20
NPS PMIS NO.: 326334
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.9
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
BL
CA
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Black Canyon of the Gunnison National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 500 1,000Feet
BLACK CANYON
OF THE GUNNISON
NATIONAL PARK
AREA MAP 3
MP 6.0
MP 7.0
ROUTE 0901
HIGH POINT
PARKING
ROUTE 0904
CEDAR POINT OVERLOOK
ROUTE 0902
SUNSET VIEW PARKING
ROUTE 0903
DRAGON POINT PARKING
ROUTE 0010
SOUTH RIM DRIVE
/22
/20
NPS PMIS NO.: 326334
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.10
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
BL
CA
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Black Canyon of the Gunnison National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
BLACK CANYON
OF THE GUNNISON
NATIONAL PARK
AREA MAP 4
ROUTE 0222
EAST PORTAL CAMPGROUND
ACCESS ROAD
/22
/20
NPS PMIS NO.: 326334
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.11
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
BL
CA
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Black Canyon of the Gunnison National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
BLACK CANYON
OF THE GUNNISON
NATIONAL PARK
AREA MAP 5
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.12
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
KE
Y M
AP
.m xd
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
LEGEND:
0 2 4Miles
AREA
MAP 1
AREA
MAP 2
AREA
MAP 3
AREA
MAP 4
AREA
MAP 5 AREA
MAP 6 AREA
MAP 7
AREA
MAP 8
COLORADO NATIONAL
MONUMENT
KEY MAP
FRUITA, CO
GRAND
JUNCTION, CO
To Fruita
2.5 miles
To Grand Junction 4 miles
Micro Surfacing Type 2
Chip Seal
No Work Unless Noted Otherwise
Micro Surfacing Type 3
ROUTE 0905
SADDLEHORN
MAINTENANCE
AREA PARKING
(NO WORK)
ROUTE 0929
WEST ENTRANCE PARKING
ROUTE 0900
VISITOR CENTER
PARKING
ROUTE 0902
SADDLEHORN PICNIC AREA PARKING
ROUTE 0920
FRUITA CANYON VIEW
PARKING
ROUTE 0921
DISTANT VIEW PARKING
ROUTE 0922
HISTORIC TRAILS
VIEW PARKING
ROUTE 0923
BALANCED ROCK PARKING
ROUTE 0924
REDLANDS VIEW PARKING
ROUTE 0927
RESIDENCE
PARKING AREA
ROUTE 0904BZ
WINDOW ROCK NATURE TRAIL PARKING B
ROUTE 0937
OVERLOOK AT MP 1.94
ROUTE 0938
CAMPGROUND LOOP C PARKING
ROUTE 0904AZ
WINDOW ROCK NATURE TRAIL PARKING A
ROUTE 0906
BOOK CLIFF OVERLOOK PARKINGROUTE 0901
STONE HOUSE
PARKING
ROUTE 0201CBZ
SADDLEHORN CAMPGROUND LOOP C SPUR B
ROUTE 0201CAZ
SADDLEHORN CAMPGROUND
LOOP C SPUR A
ROUTE 0201A
SADDLEHORN
CAMPGROUND
LOOP A
ROUTE 0201CZ
SADDLEHORN CAMPGROUND LOOP C
ROUTE 0201B
SADDLEHORN
CAMPGROUND LOOP BROUTE 0400
SADDLEHORN
MAINTENANCE/
RESIDENCE ROAD
ROUTE 0200
SADDLEHORN LOOP ROAD
ROUTE 0010
RIMROCK DRIVE
ROUTE 0403BZ
STONE HOUSE SERVICE ROAD
ROUTE 0403AZ
STONE HOUSE TURN AROUND
ROUTE 0405
VISITOR CENTER SERVICE ROAD
MP 1.0
MP 2.0
MP 3.0
MP 4.0
TUNNEL
TUNNEL
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.13
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 1
Micro Surfacing Type 3
ROUTE 0907
INDEPENDENCE MONUMENT
VIEW PARKING
ROUTE 0908
GRAND VIEW PARKING
ROUTE 0903
OTTO'S TRAIL PARKING
ROUTE 0930
MONUMENT CANYON
VIEW PARKING
ROUTE 0010
RIMROCK DRIVE
MP 5.0
MP 6.0
MP 7.0
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.14
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 2
Micro Surfacing Type 3
ROUTE 0909
COKE OVENS
OVERLOOK PARKING
ROUTE 0910
HIGHLAND VIEW PARKING
ROUTE 0919
ARTIST'S POINT PARKING
ROUTE 0926
UPPER MONUMENT
CANYON TRAIL PARKING
ROUTE 0010
RIMROCK DRIVE
MP 8.0
MP 9.0
MP 10.0
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.15
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 3
Micro Surfacing Type 3
MP 11.0
MP 12.0
ROUTE 0932
UPPER LIBERTY CAP
TRAIL PARKING AREA
ROUTE 0100
WEST GLADE
PARK ROAD
ROUTE 0010
RIMROCK DRIVE
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.16
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 4
Micro Surfacing Type 3
ROUTE 0931
UTE CANYON TRAIL PARKING
ROUTE 0911
UPPER UTE CANYON PARKING
ROUTE 0912
FALLEN ROCK OVERLOOK PARKING
ROUTE 0913
UTE CANYON OVERLOOK PARKING
MP 13.0
MP 14.0
MP 15.0
ROUTE 0010
RIMROCK DRIVE
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.17
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 5
Micro Surfacing Type 3
MP 16.0 MP 17.0
ROUTE 0914
RED CANYON OVERLOOK PARKING
ROUTE 0010
RIMROCK DRIVE
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.18
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 6
Micro Surfacing Type 3
MP 18.0 MP 19.0
MP 20.0
MP 21.0
ROUTE 0915
COLD SHIVERS PARKING
ROUTE 0916
UPPER SERPENT'S
TRAIL PARKING
ROUTE 0011
EAST GLADE PARK ROAD
ROUTE 0010
RIMROCK DRIVE
TUNNEL
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.19
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 1,000 2,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 7
Micro Surfacing Type 3
MP 22.0
ROUTE 0933
EAST ENTRANCE SIGN PARKING
ROUTE 0928
EAST ENTRANCE PARKING
ROUTE 0917
LOWER SERPENT'S
TRAIL PARKING
ROUTE 0918
DEVIL'S KITCHEN
PICNIC AREA PARKING
ROUTE 0925A
EAST MAINTENANCE PARKING A
(NO WORK)
ROUTE 0925B
EAST MAINTENANCE PARKING B
(NO WORK)
ROUTE 0402
EAST SHOP ROAD
ROUTE 0202
DEVIL'S KITCHEN
PICNIC AREA ROAD
ROUTE 0010
RIMROCK DRIVE
/22
/20
NPS PMIS NO.: 326367
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.20
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
CO
LM
AR
EA
M
AP
S.
mx d
NOTE:
1. See Road Inventory Program (RIP) data for Colorado National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Micro Surfacing Type 2
Chip Seal
LEGEND:
No Work Unless Noted Otherwise
0 500 1,000Feet
COLORADO
NATIONAL MONUMENT
AREA MAP 8
Micro Surfacing Type 3
1. See Road Inventory Program (RIP) data for Florissant Fossil Beds National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
FLORISSANT FOSSIL BEDS
NATIONAL MONUMENT
KEY MAP
/22
/20
NPS PMIS NO.: 326321
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.21
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
FL
FO
_K
EY
M
AP
.m xd
0 5 10Miles
AREA MAP
Micro Surfacing Type 2
LEGEND:
No Work Unless Noted Otherwise
Full Depth Reclamation with a 3" Asphalt Concrete Overlay
ROUTE 0900
VISITOR CENTER
PARKING
ROUTE 0901
HORNBEK HOMESTEAD
PARKING
ROUTE 0902
BARKSDALE PICNIC
AREA PARKING
NOTE:
1. See Road Inventory Program (RIP) data for Florissant Fossil Beds National Monument Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
FLORISSANT FOSSIL BEDS
NATIONAL MONUMENT
AREA MAP
/22
/20
NPS PMIS NO.: 326321
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.22
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
FL
FO
_A
RE
A M
AP
.m xd
Micro Surfacing Type 2
LEGEND:
No Work Unless Noted Otherwise
0 2,000 4,000Feet
To Lake George
5.3 miles
To Woodland Park
12.7 miles
Full Depth Reclamation with a 3" Asphalt Concrete Overlay
See G sheets for drainage Plan, details, and tabulation of quantities Remove existing culvert
Install 18-Inch equivalent diameter elliptical pipe culvert Install flared end section LT and RT See G sheets for culvert details and tabulation of quantities
R O U T E 0 2 0 0
LO O P R O A D
R O U T E 0 0 1 0
M A IN E N T R A N C E R O A D
R O U T E 0 9 0 0
V IS IT O R C E N T E R P A R K IN G
R O U T E 0 9 0 1
P IC N I C A R E A P A R K I N G
R O U T E 0 9 0 4
H A N D I C A P P A R K IN G
NOTE:
1. See Road Inventory Program (RIP) data for Fort Laramie National Historic Site Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
FORT LARAMIE
NATIONAL HISTORIC SITE
KEY MAP
/23
/20
NPS PMIS NO.: 326368
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.23
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
FO
LA
_K
EY
M
AP
.m xd
Cape Seal (Micro Surfacing Type 2 over a Chip Seal 1C)
LEGEND:
0 4 8Miles
AREA MAP
Chip Seal
No Work Unless Noted Otherwise
Chip Seal (1C) over Micro Surfacing Type 2 (as a leveling course)
ROUTE 0200
LOOP ROAD
ROUTE 0010
MAIN ENTRANCE ROAD
ROUTE 0900
VISITOR CENTER PARKING
ROUTE 0901
PICNIC AREA PARKING
ROUTE 0904
HANDICAP PARKING
NOTE:
1. See Road Inventory Program (RIP) data for Fort Laramie National Historic Site Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
FORT LARAMIE
NATIONAL HISTORIC SITE
AREA MAP
/28
/20
NPS PMIS NO.: 326368
STATE
NP MULTI PMS(2)
SHEET
NUMBER
CO
PROJECT
D.24
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
\\u sq ts0 vs
\Jo bs \_T ran sp ort ati on \W
XX
Z7
0_
W
FL
_ID
IQ
\W
XX
Z7
3_
F0
0_
CO
_P av e P res \80
0_
FH
WA
\22
F0
0\0
1-C
AD
D\ Sh ee ts\
CO
P
HA
SE
2\ D\
FO
LA
_A
RE
A M
AP
.m xd
LEGEND:
0 1,000 2,000Feet
ROUTE 0402
MAINTENANCE ROAD
HWY 160 to Fort Laramie
2.7 miles
BRIDGE
(NO WORK)
Cape Seal (Micro Surfacing Type 2 over a Chip Seal 1C)
No Work Unless Noted Otherwise
Chip Seal
Chip Seal (1C) over Micro Surfacing Type 2 (as a leveling course)
63504-1000
SQFT Each SQFT
36 x 18 4.5 8 36.0
36 x 36 9 8 72.0
24 x 24 4 4 16.0
36 x 36 9 4 36.0
36 x 36 9 12 108.0
36 x 18 4.5 1 4.5
36 x 18 4.5 2 9.0
30 x 30 6.25 4 25.0
QTY
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]TTC NPS PMIS No.
TABULATION OF
TEMPORARY TRAFFIC
CONTROL QUANTITIES
12/29/22 7:52 AM 326334, 326367, 326321, 326368
CONSTRUCTION SIGN QUANTITIES
306.5
Notes
EACH
CO E.1NP MULTI PMS(2)
ITEM NO.
63502-0700
63506-0600
63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
STATE
NOTES
TEMPORARY TRAFFIC CONTROL
SHEET
NUMBER
PROJECT
Item Number
MUTCD Reference
UNIT
OTHER TRAFFIC CONTROL QUANTITIES
TEMPORARY TRAFFIC CONTROL, CONE
DAY
HOUR
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR
TEMPORARY TRAFFIC CONTROL, PILOT CAR
DESCRIPTION
TOTAL
63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH
Inches
Sign Message
End Road Work
Road Work Ahead
25 MPH
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
Panel Size Area Quantity
Unit
Drawing Reference
635-1
635-1
635-6, 635-7
635-6, 635-7
635-6
G20-2
W20-1
W13-1P
W20-4
W20-7A
G20-4 Pilot Car Follow Me
G24-B
W8-7
Wait For Pilot Car
Loose Gravel
One Lane Road Ahead
Flagger Symbol
0010 30,677
0200 1,637
0010 118,694
0011 East Glade Park Road 3,854
0100 West Glade Park Road 686
0200 Saddlehorn Loop Road 4,963
0900 Visitor Center Parking 672
0010 Main Entrance Road 1,637
12/23/2022 9:07
FLFO
FOLA
Rimrock Drive
LNFT
BLCA
South Rim Drive
COLM
South Rim Campground Road
162,820
SHEET
NUMBER
E.2
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
63503-0700
RemarksRoute Number
PROJECTSTATE
CO
TEMPORARY TRAFFIC CONTROL
NP MULTI PMS(2)
Route Name
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO_TTC-2_07152022.xlsm]TTC (2)
TABULATION OF TEMPORARY
TRAFFIC CONTROL QUANTITIES
NOTES:
1. Temporary pavement markings include only centerline stripes.
NPS PMIS No. 326334, 326367, 326321, 326368
63401-0000 63401-0000 63401-0000 63401-0000 63405-
63313-
63315-
63497-0200
(TYPE B) (TYPE B) (TYPE B) (TYPE B)
YELLOW WHITE WHITE WHITE YELLOW WHITE WHITE BLUE YELLOW WHITE GREEN (TYPE B)
LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT SQYD EACH
0010 South Rim Drive 122,708 122,708 0 1,500 0 0 0 0 122,708 124,208 0 22
0200 South Rim Campground Road 6,548 6,548 0 0 0 0 96 0 6,548 6,644 0
0205 Campground Loop A 0 0 0 0 0 0 72 0 0 72 1 1
0206 Campground Loop B 0 0 0 0 0 0 0 0 0 0 1 1
0207 Campground Loop C 0 0 0 0 0 0 120 0 0 120 0
East Portal Campground Access
Road 0 0 0 0 0 0 72 0 0 72 0
0400 South Rim Residence Road 0 0 0 0 0 0 0
0901 High Point Parking 0 0 0 836 0 480 0 0 0 1,316 2 4 6
0902 Sunset View Parking 0 50 360 600 0 0 144 0 0 1,154 1 1
0903 Dragon Point Parking 0 0 224 0 0 0 0 0 0 224 0
0904 Cedar Point Overlook 0 0 224 0 0 0 0 0 0 224 0
0905 Painted Wall View Parking 0 0 192 0 0 0 0 0 0 192 0
0906 Chasm View Overlook 0 0 512 0 0 192 0 0 0 704 1 1
0907 Devil's Overlook 0 0 256 0 0 0 0 0 0 256 0
0908 Rock Point Parking 0 0 320 0 0 0 0 0 0 320 0
0909 Cross Fissures Overlook 0 0 256 0 0 0 0 0 0 256 0
0910 Pulpit Rock Overlook 0 0 224 0 0 360 0 0 0 584 1 1
0912 South Rim Residence Area 0 0 360 0 0 0 0 0 0 360 0
South Rim Campground Road
Parking 0 0 396 0 0 2,160 0 0 0 2,556 1 1
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]BLCA Striping
PAVEMENT MARKING SUMMARY
STATE PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) F.1
C R O
S S -W
A L K
S T R
IP
IN
G
(T Y P E B
BID ITEM NUMBER FIO FIO
Remarks
R O
U T E N
U M
B E R
ROUTE NAME Y
E L L O
W
C E N
T E R L a n d M
IS
C
M A R K
IN
G S
S O
L
ID
E D
E S a d
M
IS
C
M A R K
IN
G S
A R R O
W S
P A R K
A L L L
IN
P E B
) PAVEMENT
MARKINGS
PAVEMENT
MARKINGS
M
IS
C S
Y M
B O
L S
A B A A
C C E S S
IB
M
B O
L
S T O
P L
E T T E R
IN
G
H A T C H
E D
A R E A S
(T Y P E B
H A T C H
E D
A R E A S
(T Y P E B
S T O
P L
IN
E
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS
EACH
Add (1) ABA symbol
RECESSED
PAVEMENT
MARKER, BI-
DIRECTIONAL
REFLECTIVE
R U
M B L E S
T R
IP
R U
M B L E S
T R
IP
(C
N
T E R L
IN
E
PAVEMENT
MARKINGS
, SYMBOLS
Add (1) ABA symbol at site B-1
Add stop line
Parking Areas
No pavement markings
Add access aisle hatch
129,306 2,936 03,324 0 22
NOTES:
1. Solid Edge Lines & Misc. Markings include edge (fog) lines, parallel parking lines, lane separation lines, transverse stall lines for parking areas & curb paint.
2. Match existing pavement markings or as directed by the CO.
3. Quantities shown include 2 coats of pavement markings when paid by the LNFT.
4. FIO = For Information Only.
12139,262 0 0 8 0SHEET TOTAL
1/17/23 9:24 AM NPS PMIS No. 326334
43,192 504 0 129,256
TABULATION OF
PERMANENT
PAVEMENT MARKINGS
BLACK CANYON OF THE
GUNNISON NATIONAL PARK
129,256
63401-
63401-0000 63401-0000
63401-
63405-
63313-
63315-
63497-0200
(TYPE B) (TYPE B) (TYPE B) (TYPE B)
YELLOW WHITE WHITE WHITE YELLOW WHITE WHITE BLUE YELLOW WHITE GREEN (TYPE B)
LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT SQYD EACH
0010 Rimrock Drive 474,776 474,896 0 1,410 1,440 0 0 0 476,216 476,306 0 1,200 33 100
0011 East Glade Park Road 15,416 15,416 0 0 0 0 72 0 15,416 15,488 0
0100 West Glade Park Road 2,744 2,744 0 0 0 0 72 0 2,744 2,816 0
0200 Saddlehorn Loop Road 5,068 19,852 0 0 0 0 384 0 5,068 20,236 0
0201A Saddlehorn Campground Loop A 0 0 0 0 0 0 0 0 0 0 2 2
0201B Saddlehorn Campground Loop B 0 0 0 0 0 0 0 0 0 0 2 2
0201CAZ
Saddlehorn Campground Loop C
Spur A 0 0 0 0 0 0 0 0 0 0 1 1
0201CBZ
Saddlehorn Campground Loop C
Spur B 0 0 0 0 0 0 0 0 0 0 1 1
0201CZ Saddlehorn Campground Loop C 0 0 0 0 0 0 0 0 0 0 4 4
0202 Devil's Kitchen Picnic Area Road 2,324 2,324 0 0 0 0 72 0 2,324 2,396 0
Saddlehorn Maintenance/Residence
Road 6,968 0 0 0 0 0 192 0 6,968 192 0
0402 East Shop Road 1,900 0 0 0 0 0 0 0 1,900 0 0
0403AZ Stone House Turn Around
0403BZ Stone House Service Road 0 0 0 0 0 0 0 0 0 0 0
0405 Visitor Center Service Road 0 0 0 0 0 0 0 0 0 0 0
0900 Visitor Center Parking 0 160 1,080 0 0 1,152 384 0 0 2,776 4 4
0901 Stone House Parking 0 0 108 0 0 0 0 0 0 108 0
0902 Saddlehorn Picnic Area Parking 1,404 400 2,736 0 0 0 0 0 2,252 4,336 0
0903 Otto's Trail Parking 0 0 0 0 0 0 0 0 0 0 0
0904AZ Window Rock Nature Trail Parking A 0 0 396 0 0 288 0 0 0 684 0
0904BZ Window Rock Nature Trail Parking B 0 90 0 0 0 346 0 0 0 436 1 1
0906 Book Cliff Overlook Parking 0 0 36 0 0 384 0 0 0 420 1 1
Independence Monument View
Parking 0 80 216 0 0 384 0 0 0 680 1 1
0908 Grand View Parking 0 0 0 0 0 0 0 0 0 0 0
0909 Coke Ovens Overlook Parking 0 0 44 0 0 624 0 0 0 668 1 1
0910 Highland View Parking 0 0 0 0 0 0 0 0 0 0 0
0911 Upper Ute Canyon Parking 0 0 0 0 0 0 0 0 0 0 0
0912 Fallen Rock Overlook Parking 0 0 0 0 0 0 0 0 0 0 0
0913 Ute Canyon Overlook Parking 0 0 0 0 0 0 0 0 0 0 0
0914 Red Canyon Overlook Parking 0 0 0 0 0 0 0 0 0 0 0
0915 Cold Shivers Parking 0 0 0 0 0 96 0 0 0 96 0
0916 Upper Serpent's Trail Parking 0 0 0 0 0 0 0 0 0 0 0
0917 Lower Serpent's Trail Parking 0 0 528 0 0 1,440 144 0 0 2,112 0
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]COLM Striping
PAVEMENT MARKING SUMMARY
STATE PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) F.2
C R O
S S -W
A
R
IP
P E B
BID ITEM NUMBER FIO FIO
Remarks
R O
U T E N
U M
B E R
ROUTE NAME Y
E L L
N
T E R L d M
IS
C
M A R K
IN
G S
S O
L
ID
E D
E S a
C
M A R K
IN
G S
A R R O
W
S PAVEMENT
MARKINGS
, SYMBOLS
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS
M
IS
C S
Y M
B O
L S
A B A A
C C E S S
IB
M
B O
L
S T O
P L
E T T E R
IN
G
H A T C H
E D
A R E A S
(T Y P E B
H A T C H
E D
A R E A S
(T Y P E B
S T O
P L
IN
E
PAVEMENT
MARKINGS
P A R K
A L L L
IN
P E B
) PAVEMENT
MARKINGS
EACH
Rumble strip cluster at entrance; add recessed (raised) centerline pavement markers at 20' O.C. in tunnels, between the first two tunnels, and 150' each side as directed by CO. Add rumble strip centerlines at tunnels.
Add (1) stop line
R U
M B L E S
T R
IP
R U
M B L E S
T
N
T E R L
IN
E
RECESSED
PAVEMENT
MARKER, BI-
DIRECTIONAL
REFLECTIVE
No pavement markings
No pavement markings
No pavement markings
No pavement markings
Parking Areas
Helipad symbols (500' yellow included)
No pavement markings
SHEET TOTAL 510,600 515,962
No pavement markings
No pavement markings
No pavement markings
1,410 1,4405,144
NOTES:
1. Solid Edge Lines & Misc. Markings include edge (fog) lines, parallel parking lines, lane separation lines, transverse stall lines for parking areas & curb paint.
2. Match existing pavement markings or as directed by the CO.
3. Quantities shown include 2 coats of pavement markings when paid by the LNFT.
4. FIO = For Information Only.
18 100529,750 0 0 8 0 104,714
TABULATION OF
PERMANENT PAVEMENT
MARKINGS
1/26/23 2:03 PM NPS PMIS No.
COLORADO NATIONAL MONUMENT
No pavement markings
No pavement markings
No pavement markings
326367
1,320 0 512,888 1,200PRELIMINARY - N
63313-
63315-
63497-0200
(TYPE B) (TYPE B) (TYPE B) (TYPE B)
YELLOW WHITE WHITE WHITE YELLOW WHITE WHITE BLUE YELLOW WHITE GREEN (TYPE B)
LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT SQYD EACH
0918 Devil's Kitchen Picnic Area Parking 0 0 1,232 0 0 1,248 0 0 0 2,480 2 3 5
0919 Artist's Point Parking 0 0 0 0 0 0 0 0 0 0 0
0920 Fruita Canyon View Parking 0 0 0 0 0 384 0 0 0 384 0
0921 Distant View Parking 0 0 0 0 0 288 0 0 0 288 0
0922 Historic Trails View Parking 0 0 0 0 0 240 0 0 0 240 0
0923 Balanced Rock Parking 0 0 0 0 0 0 0 0 0 0 0
0924 Redlands View Parking 0 0 0 0 0 0 0 0 0 0 0
0926 Upper Monument Canyon Trail Parking 0 0 0 0 0 0 0 0 0 0 0
0927 Residence Parking Area 0 0 288 0 0 480 0 0 0 768 1 1
0928 East Entrance Parking 0 0 0 0 0 0 0 0 0 0 0
0929 West Entrance Parking 0 0 0 0 0 0 0 0 0 0 0
0930 Monument Canyon View Parking 0 0 0 0 0 0 0 0 0 0 0
0931 Ute Canyon Trail Parking 0 0 0 0 0 0 0 0 0 0 0
0932 Upper Liberty Cap Trail Parking Area 0 0 144 0 0 240 0 0 0 384 1 1
0933 East Entrance Sign Parking 0 0 0 0 0 0 0 0 0 0 0
0937 Overlook At MP 1.94 0 0 0 0 0 0 0 0 0 0 0
0938 Campground Loop C Parking 0 0 72 0 0 384 0 0 0 456 1 1
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
\\usqts0vs01\Jobs\_Transportation\WXXZ7300_WFL_IDIQ 2021\WXXZ7313_22F000030_CO_Pave Pres\800_FHWA\22F000030\01-CADD\Sheets\CO PHASE 2\_Tabs\[CO Proj_Sum_Shts_PHASE 2.xlsm]COLM Striping (2)
FIO
Remarks
R O
U T E N
U M
B E R
ROUTE NAME Y
E L L
N
T E R L d M
IS
C
M A R K
IN
G S
S O
L
ID
E D
E S a
C
M A R K
IN
G S
S T O
P L
IN
E
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS
PAVEMENT MARKING SUMMARY
STATE PROJECT
SHEET
NUMBER
CO NP MULTI PMS(2) F.3
P A R K
A L L L
IN
P E B
C R O
S S -W
A
R
IP
P E B
BID ITEM NUMBER FIO
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS
M
IS
C S
Y M
B O
L S
A B A A
C C E S S
IB
M
B O
L
S T O
P L
E T T E R
IN
G
H A T C H
E D
A R E A S
(T Y P E B
H A T C H
E D
A R E A S
(T Y P E B
Parking Areas
No pavement markings
No pavement markings
EACH
A R R O
W
S PAVEMENT
MARKINGS
, SYMBOLS
R U
M B L E S
T
N
T E R L
IN
E
RECESSED
PAVEMENT
MARKER, BI-
DIRECTIONAL
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .