These are technical drawings for the VA Medical Center's Energy Center Water Heater Replacement project located in Saginaw, Michigan (Project 655-23-201). The comprehensive set of architectural and engineering plans details the complete replacement of the existing domestic hot water generation system on the first floor of the facility's Energy Center. The project involves removing the current shell and tube heat exchanger, three gas-fired backup water heaters, multiple circulating pumps, storage tank, and expansion tank, and replacing them with three new plate and frame heat exchangers, two domestic hot water and two heating hot water circulating pumps, a new storage tank, and a new expansion tank. The drawings specify technical requirements for mechanical, plumbing, and electrical systems, including integration with the existing Johnson Controls Metasys Building Management System, and are prepared for 100% bid documentation with an issue date of January 24, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E C
T
W e is s S t
N
Building Key:
1 MAIN HOSPITAL
2 POLICE
3 ADMINISTRATIVE
4 ADMINISTRATIVE
6 ADMINISTRATIVE
9 WAREHOUSE
17 GAS HOUSE
19 GENERATOR BLDG
20 MEDIUM VOLTAGE BLDG
21 GARAGE
22 CLC
30 ADMINISTRATIVE
32 PUMP HOUSE
33 WATER TOWER
34 BACK FLOW PREVENTOR
35 PAVILION
38 TEMP OFFICE TRAILER
EC ENERGY CENTER
Weiss St
N M a s o n S t
Davenport Ave
State St
Interstate 675
N M ic h ig a n A v e
S c h a e fe r S t
N
Department of Veteran Affairs Medical Center
VA Project No.
Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Aleda E. Lutz VAMC
Energy Center Water Heater Replacement
01.24.2025
COVER SHEET
G-001
SLSSLS
655-23-201
Saginaw, Michigan (655)
EC
1500 Weiss St. Saginaw, MI 48602 PROJECT #: 655-23-201
100% Bid Documents
Energy Center Water Heater Replacement
SHEET LIST
Sheet Number Sheet Name
GENERAL
G-001 COVER SHEET
MECHANICAL
M-000 MECHANICAL GENERAL INFORMATION
PD-101 FIRST FLOOR PLUMBING DEMO PLANS
MD-101 FIRST FLOOR MECHANICAL DEMO PLANS
P-101 FIRST FLOOR PLUMBING PLANS
M-101 FIRST FLOOR MECHANICAL PLANS
M-600 MECHANICAL SCHEDULES AND DIAGRAMS
ELECTRICAL
E-000 ELECTRICAL GENERAL INFORMATION
E-100 BASEMENT ELECTRICAL PLANS
E-101 FIRST FLOOR ELECTRICAL PLANS
TOTAL SHEETS: 10
SCALE: 1" = 1'-0"
VICINITY MAP
Revisions Date 03/03/2025
M
BFP
WCO
CO
CO
S
H
T
CO2
M
R
R
D
D
GAL GALLON
FFE FINISHED FLOOR ELEVATION
CIRC CIRCULATING
T & P TEMPERATURE AND PRESSURE
SP STAIR PRESSURE
SQUARE FOOT/SQUARE FEET
SERVICE SINK
SHOWER
SS
SqFt / SF
SH
POUNDS PER SQUARE INCH - GAUGEPSIG
REVOLUTIONS PER MINUTE
REDUCED PRESSURE ZONE
SUPPLY AIR
ROOF SUMP
RELIEF AIR
RETURN AIR
RPM
SA
RS
RPZ
REL.A
RA
POUNDS PER SQUARE INCH - ABSOLUTE
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
OPPOSED BLADE DAMPER
OPEN ENDED DUCT
OUTSIDE DIAMETER
ON CENTER / CENTER TO CENTER
OUTSIDE AIR
PD
PSIA
PRV
OBD
OED
OD
OC
OA
MANUAL AIR VENT
NOT IN CONTRACT
NORMALLY CLOSED
NOMINAL
NORMALLY OPEN
NOISE CRITERIA
MINIMUM
MISCELLANEOUS
MANHOLE
MANUFACTURER
MECHANICAL
NOM
NIC
N.C.
NO
NC
MAV
MIN
MISC
MFR
MECH
MH
1000 BRITISH THERMAL UNITS PER HOUR
POUNDS PER HOUR
LOCKED ROTOR AMPS
LEAVING WET BULB TEMPERATURE
LEAVING DRY BULB TEMPERATURE
MAXIMUM
LAVATORY
LEAVING AIR TEMPERATURE
INTERNAL STATIC PRESSURE
KILOWATT
INDIRECT WASTE
INCHES
INVERT
LRA
MAX
MBH
LWB
LDB
LBS/HR
LAV
ISP
INV
KW
LAT
IW
IN
WALL HYDRANT
WATER GAUGE
VENT THRU ROOF
WATER CLOSET
WET BULB TEMPERATURE
WASTE AND VENT
WG
WH
W
WC
WB
W&V
VTR
WASTE
HOUR
INVERT ELEVATION
HERTZ
INSIDE DIAMETER
HYDRANT
HEATING
HYD
HZ
IE
ID
HTG
HR VOLUME DAMPER (MANUALLY ADJUSTABLE)
UNDERWRITERS LABORATORY
TEMPERATURE CONTROL
TOTAL STATIC PRESSURE
UNDERGROUND
VD
UR
UL
URINAL
TSP
TYP
UG
TC
TYPICAL
SMOKE DETECTOR
MOTORIZED DAMPER
VOLUME DAMPER (MANUALLY ADJUSTABLE)
CO2 SENSOR
CROSS SECTION OF SUPPLY AIR DUCT
FLEXIBLE CONNECTION
LINEAR SLOT DIFFUSER
SUPPLY DIFFUSER
RETURN OR EXHAUST GRILLE
TRANSFER GRILLE
FLEXIBLE DUCT CONNECTION TO SUPPLY
CONCENTRIC TRANSITION (DOUBLE LINE)
CONCENTRIC TRANSITION (SINGLE LINE)
ECCENTRIC TRANSITION (SINGLE LINE)
ECCENTRIC TRANSITION (DOUBLE LINE)
RADIUS RECTANGULAR ELBOW
RADIUS ROUND ELBOW
ROUND ELBOW UP
RECTANGULAR ELBOW UP
RECTANGULAR ELBOW DOWN
ROUND ELBOW DOWN
RECTANGULAR TAKE-OFF (SINGLE LINE)
RECTANGULAR TAKE-OFF (DOUBLE LINE)
ROUND TAKE-OFF (SINGLE LINE)
ROUND TAKE-OFF (DOUBLE LINE)
SPIN-IN FITTING (WITH VOLUME DAMPER)
ELBOW (WITH TURNING VANES)
FULL LOAD AMPSFLA
GALLONS PER HOUR
GALLONS PER MINUTE
FLOOR
FEET
FEET PER MINUTE
FUNNEL FLOOR DRAIN
FLOOR SINK
FACE VELOCITY
FIRE VALVE CABINET
GPM
GPH
FVC
FV
FT
FS
FFD
FPM
FLR
FLEXIBLE CONNECTION
FIRE HOSE VALVE
FLOOR DRAIN
FACE AREA (COIL) / FREE AREA (LOUVER)
DEGREES FAHRENHEIT
FD
FHV
FC
FA
°F
ELECTRIC WATER COOLER
EXTERNAL STATIC PRESSURE
ELEVATION
ENTERING AIR TEMPERATURE
EXHAUST AIR
EXPANSION JOINT
EXHAUST FAN
ENERGY MANAGEMENT SYSTEM
ELECTRICALELECT
EWC
EWB
ESP
EMS
EJ
EL
EF
EAT
EDB
EA/EXH
DEGREES
DRY BULB TEMPERATURE
DOWN
EXISTING
DOMESTIC WATER HEATER
DRAIN TILE CONNECTION
DIRECT DIGITAL CONTROL
CABINET UNIT HEATER
CONTROL VALVE
CONVECTOR
DWH
(E)
DTC
DDC
DN
CV
DB
DEG
CUH
CONV
COOLING
CONTINUATION OR CONTINUED
CLEAN OUT
CAPACITY
BRITISH THERMAL UNIT
CUBIC FEET PER HOUR
CONSTANT AIR VOLUME
BACKWATER VALVE
CUBIC FEET PER MINUTE
CO
CONT
CLG
CFM
CFH
CAV
CAP
BWV
BTUH
BTU
ACCESS DOOR
AIR EXTRACTOR
BRAKE HORSEPOWER
BOTTOM OF DUCT
BACKFLOW PREVENTER
AUTOMATIC SPRINKLER RISER
ABOVE FINISHED FLOOR
AIR PRESSURE DROP
AUTOMATIC AIR VENT / AIR ADMITTANCE VALVE
ASR
BOD
BHP
BFP
APD
AFF
AAV
AE
AD
ENTERING WET BULB TEMPERATURE
ENTERING DRY BULB TEMPERATURE
BRITISH THERMAL UNITS PER HOUR
DESCRIPTION
MECHANICAL ABBREVIATIONS
ABBREV. DESCRIPTIONABBREV.
MECHANICAL ABBREVIATIONSMECHANICAL ABBREVIATIONS
ABBREV. DESCRIPTION
MECHANICAL SYMBOLS
ABBREV. DESCRIPTION
SD
INCLINED DROP IN DIRECTION OF AIR FLOW
(SINGLE LINE)
INCLINED DROP IN DIRECTION OF AIR FLOW
(DOUBLE LINE)
INCLINED RISE IN DIRECTION OF AIR FLOW
(SINGLE LINE)
INCLINED RISE IN DIRECTION OF AIR FLOW
(DOUBLE LINE)
DIFFUSER
DUCT
CROSS SECTION OF EXHAUST OR RETURN AIRORS OVERFLOW ROOF SUMP
RELATIVE HUMIDITYRH
OS&Y OUTSIDE SCREW AND YOKE
REQD REQUIRED
EXISTING DEVICES OR EQUIPMENT
NEW OR MODIFIED DEVICES OR EQUIPMENT
M5.2
M5.2
SHEET M5.2 ON WHICH
SECTION IS DRAWN
SHEET M5.2 ON WHICH SECTION IS CUT
EXISTING SYSTEM COMPONENT TO BE REMOVED
DRAWING NOTATION
(ENLARGED PARTIAL PLAN SIMILAR)
SCALE: 1/4" = 1' - 0"
SECTION
SECTION NO. 6
POINT OF NEW CONNECTION
SECTION NO. 4
SYMBOL
NEW WORK KEY NOTE NO. 1
(IE: EXHAUST FAN NO. 1)
DEMOLITION KEY NOTE NO. 1
EQUIPMENT DESIGNATION,
DESCRIPTION
NEW
EXISTING
SMOKE DAMPER
FIRE DAMPER (HORIZONTAL)
FIRE DAMPER (VERTICAL)
NEW
EXISTING
EXISTING
NEW
EXISTING
NEW
EXISTING
NEW
HB HOSE BIBB
PT PRESSURE / TEMPERATURE PORT
FIRE HYDRANT
FIRE HOSE CABINET
FIRE HOSE RACK
FIRE DEPARTMENT CONNECTION
FHR
FHC
FDC
FH
YEAR CODE
INTERNATIONAL PLUMBING CODE
INTERNATIONAL MECHANICAL CODE
VA PLUMBING DESIGN
INTERNATIONAL FUEL GAS CODE
APPLICABLE CODES
AND REGULATIONS
AIR TERMINAL TAG:
IE: DIFFUSER TYPE = S-1
NECK SIZE = 8ø
CFM = 100-(TYPICAL FOR 2)
VA HVAC DESIGN MANUAL (INCLUDING 2024 REVISIONS))2023
COMBINATION FIRE/SMOKE DAMPER
(HORIZONTAL)
COMBINATION FIRE/SMOKE DAMPER
(VERTICAL)
ECCENTRIC REDUCER
DESCRIPTION
MECHANICAL PIPING SYMBOLS
ABBREV.
PIPE ELBOW DOWN
DIRECTION OF FLOW
PIPE ELBOW UP
UNION
CONCENTRIC REDUCER
FLEXIBLE CONNECTION
PIPE GUIDE
PIPE ANCHOR
EXPANSION JOINT
CIRCULATING PUMP
BUTTERFLY VALVE
GLOBE VALVE
ANGLE VALVE
BALL VALVE
ISOLATION VALVE
PIPE CAP OR PLUG
TRAP (PLAN VIEW)
FAN
CHECK VALVE (SPRING)
PLUG VALVE
NEEDLE VALVE
FLOOR DRAIN / FUNNEL FLOOR DRAIN (ELEVATION)
CLEAN OUT (IN FLOOR)
ROOF SUMP
FLOOR DRAIN / FUNNEL FLOOR DRAIN (PLAN VIEW)
AUTOMATIC GAS SHUT-OFF VALVE
CHECK VALVE (SWING)
BACKFLOW PREVENTER
DIRECTION OF PIPE PITCH
HOSE BIBB, WALL HYDRANT
SPRINKLER HEAD (SIDEWALL)
SIAMESE CONNECTION (YARD)
FIRE HYDRANT
FLOW SWITCH
SPRINKLER HEAD (UPRIGHT)
SIAMESE CONNECTION (WALL MOUNTED)
OUTSIDE SCREW AND YOKE VALVE (OS&Y)
CLEAN OUT (IN LINE)
FLOW MEASURING DEVICE
COMBINATION FLOW MEASURING AND BALANCING DEVICE
BALANCING VALVE
AUTOMATIC AIR VALVEAAV
MANUAL AIR VALVEMAV
S = SUPPLY
R = RETURN
E = EXHAUST
MINIMUM CIRCUIT AMPACITYMCA
MAXIMUM OVER-CURRENT PROTECTIONMOP/MOCP
UNIT HEATERUH
PIPE TEE DOWN
STRAINER
CLEAN OUT (WALL)
WATER METER ASSEMBLY
PRESSURE REGULATING VALVE
SOLENOID VALVE
CONTROL VALVE (2-WAY / 3-WAY)
RETURN OR EXHAUST AIR FLOW / SUPPLY AIR FLOW
MOTOR OPERATED DAMPER (AUTOMATIC)MOD
DESCRIPTION
PIPING LEGEND
ABBREV.
THERMOSTAT OR
TEMPERATURE SENSOR
HUMIDISTAT OR
HUMIDITY SENSOR
EF-1
S-1
8ø
100-2
DESCRIPTION
DRAWING INDEX
SHEET
NO
FS
X-#
S:
D:
H:
SP:
V:
E:
SANITARY / VENT
DOMESTIC WATER
HVAC PIPING
VENTILATION
EXHAUST
STAIRWELL PRESSURIZATION
SYSTEM RISER
DESIGNATION
RISER NUMBER
FURNISHEDFURN
INSTALLEDINST
T = TRANSFER
BACKWATER VALVE
COMBUSTION AIRCA
FLUEFL
SP STATIC PRESSURE
UNLESS NOTED OTHERWISEUNO
HORSEPOWERHP
EXISTING PIPING UNDERGROUND
BUILDING AUTOMATION SYSTEMBAS
BUILDING MANAGEMENT SYSTEMBMS
GRADE CLEAN OUTGCO
YARD CLEAN OUTYCO
HO HUB OUTLET BCW BOOSTED DOMESTIC COLD WATER PIPING
DI DEIONIZED WATER PIPING
CW DOMESTIC COLD WATER PIPING
NPCW NON POTABLE COLD WATER PIPING
RO REVERSE OSMOSIS WATER PIPING
SCW SOFTENED COLD WATER
HW
HWR
DOMESTIC HOT WATER PIPING
DOMESTIC HOT WATER RECIRCULATION PIPING
NPHW NON POTABLE HOT WATER PIPING
TW TEMPERED WATER PIPING
F (DRY) FIRE PROTECTION DRY PIPING
F FIRE PROTECTION WET PIPING
F (PRE) FIRE PROTECTION PRE-ACTION PIPING
CHWR CHILLED WATER RETURN PIPING
CWR CONDENSER WATER RETURN PIPING
GXHR GEO HEAT EXCHANGE RETURN PIPING
HPLR HEAT PUMP LOOP RETURN PIPING
HHWR HEATING HOT WATER RETURN PIPING
HPC HIGH PRESSURE CONDENSATE RETURN PIPING
LPC LOW PRESSURE CONDENSATE RETURN PIPING
MV MEDICAL VACUUM PIPING
RHWR RADIANT HEATING WATER RETURN PIPING
PCR STEAM CONDENSATE PUMPED RETURN PIPING
CR STEAM CONDENSATE RETURN PIPING
VAC VACUUM PIPING
WAGD WASTE ANESTHESIA GAS DISPOSAL PIPING
CO2 CARBON DIOXIDE PIPING
CHWS CHILLED WATER SUPPLY PIPING
CA COMPRESSED AIR PIPING
CWS CONDENSER WATER SUPPLY PIPING
GXHS GEO HEAT EXCHANGE SUPPLY PIPING
HPLS HEAT PUMP LOOP SUPPLY PIPING
HHWS HEATING HOT WATER SUPPLY PIPING
H HELIUM PIPING
HPS HIGH PRESSURE STEAM PIPING
IA INSTRUMENT AIR PIPING
LPS LOW PRESSURE STEAM PIPING
MA MEDICAL AIR PIPING
G NATURAL GAS PIPING
N NITROGEN PIPING
NO NITROUS OXIDE PIPING
O2 OXYGEN PIPING
RHWS RADIANT HEATING WATER SUPPLY PIPING
STM STEAM PIPING
OTHER OTHER PIPING
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID PIPING
RS REFRIGERANT SUCTION PIPING
AW ACID WASTE PIPING
CD CONDENSATE DRAIN PIPING
PCD CONDENSATE DRAIN PUMPED PIPING
DT DRAIN TILE
GW GREASE WASTE PIPING
IW INDUSTRIAL WASTE PIPING
RC
ORC
RAIN CONDUCTOR PIPING
RAIN CONDUCTOR OVERFLOW PIPING
PSAN
SAN
SANITARY PUMPED PIPING
SANITARY PIPING
ST
PST
STORM PIPING
STORM PUMPED PIPING
AV ACID VENT PIPING
V VENT PIPING
TEMPERATURE CONTROLS CONTRACTORTCC
NEW PIPING UNDERGROUND
M-000 MECHANICAL GENERAL INFORMATION
PD-101 FIRST FLOOR PLUMBING DEMO PLANS
MD-101 FIRST FLOOR MECHANICAL DEMO PLANS
P-101 FIRST FLOOR PLUMBING PLANS
M-101 FIRST FLOOR MECHANICAL PLANS
M-600 MECHANICAL SCHEDULES AND DIAGRAMS
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
MECHANICAL GENERAL
INFORMATION
M-000
MLPMLP
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
Revisions Date 03/03/2025
H.3
10.8 10.8
12.3 12.3
12.9 12.9
9.4 9.4
H.7
H.7
G.4
G.4
F.4
F.4
MECHANICAL
ENCLOSURE
1-1800A
AIR HANDLER
ROOM
1-1800
STAIR #09
1-S9-1
STAIR #08
1-S8-1
P2
P3
(E)2"
(E)DWST-1
(E)ET-3
2"
2 1/2"
2"
(E)CP-1
(E)CP-2
(E)3" CW
2 1/2"
2 1/2"
2"
P4
(E)CP-02
TEMPORARILY
MAINTAIN BRANCH FOR
RENTAL WATER
HEATER SYSTEM
(E)MIXING VALVE
ASSEMBLY (TO REMAIN)
(E)BUILDING 22 HWR
PUMP
(E)BUILDING 1
HWR PUMP
ABOVE DUCT
BLDG 22 HWR
TO TRAP
PRIMERS
DOM. CW TO BLDG 22 MIXING VALVES
DOM. HW TO BLDG 22 MIXING VALVES
OVERHEAD TEMP
3" COMBINED
HWR/CW
BUILDING 1
HWR
(ON SHELF)
G
(E)MIXING
VALVE
ASSEMBLY (TO
REMAIN)
EXTEND TEMPORARY GAS
PIPING FROM EXISTING 2"
SUPPLY TO RENTAL HOOK-UP
LOCATION
EXTEND PIPING DOWN
AND OUT TO RENTAL
HOOK-UP LOCATION.
PROVIDE WATER AND
GAS ISOLATION
VALVES.
OVERHEAD TEMP
3" HW SUPPLY
OVERHEAD
TEMP 2" G
BLDG 22 DOM.
HW SUPPLY
BLDG 1 DOM.
HW SUPPLY
P1
P1
P1
REMOVE BACKUP
WATER HEATER AND
ASSOCIATED
DOMESTIC WATER
PIPING AND
APPURTENANCES
REMOVE ABANDONED
WATER TREATMENT
DEVICE & ASSOCIATED
PIPING
SLOPE
UNDER BEAM
TEMP CAP
TEMP CAP
2 HW
BOILER
OPERATOR
OFFICE
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
FIRST FLOOR PLUMBING DEMO
PLANS
PD-101
MLPMLP
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC & INDICATE THE GENERAL EXTENT OF THE WORK.
PROVIDE PLUMBING SYSTEMS COMPLETE AND PER APPLICABLE CODES INCLUDING
REQUIRED COMPONENTS, OFFSETS REQUIRED TO AVOID THE STRUCTURE, ETC.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE STATE AND LOCAL
COUNTY DEPARTMENT OF HEALTH CROSS CONTAMINATION CODE REQUIREMENTS.
3. VERIFY DEPTH, SIZE, LOCATION AND CONDITION OF ALL UTILITIES IN THE FIELD, INCLUDING
POINTS OF CONNECTION, PRIOR TO STARTING ANY WORK. NOTIFY THE
ARCHITECT/ENGINEER OF ANY INTERFERENCES OR DISCREPANCIES.
4. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING AND PIPING WORK
WITH THE WORK OF ALL OTHER TRADES, EXISTING SITE CONDITIONS, AND EQUIPMENT
MANUFACTURER RECOMMENDATIONS. VERIFY ALL CLEARANCES PRIOR TO THE
FABRICATION OF ANY NEW WORK.
5. PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL MAINTAIN REQUIRED
CLEARANCES OVER, AROUND AND IN FRONT OF ALL ELECTRICAL EQUIPMENT, PANELS,
TRANSFORMERS, ETC. PIPING SHALL NOT INTERFERE WITH, OR BE INSTALLED IN A
LOCATION THAT RESTRICTS ACCESS OR CLEARANCE TO ELECTRICAL OR MECHANICAL
DEVICES. PROVIDE REQUIRED ACCESS AND CLEARANCE AROUND ALL EQUIPMENT PER
MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER
SUPPORT OF ALL PLUMBING SYSTEMS.
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLUMBING DEMO PLAN
PROVIDE DOMESTIC HOT WATER HEATING SYSTEM RENTAL.
COORDINATE OFF HOURS SYSTEMS INTEGRATION FOR GAS,
ELECTRIC, DOM. CW/HWR, & DOM. HW SUCH THAT PRIOR TO
DISABLING THE EXISTING DOMESTIC WATER HEATERS AND
STORAGE TANK SYSTEM, THE RENTAL SYSTEM IS AVALABLE
FOR USE.
FOLLOWING THE RENTAL SYSTEM INTEGRATION AND
EXISTING SYSTEM ISOLATION THE EXISTING SYSTEM
DEMOLITION SHALL BE ALLOWED TO COMMENCE.
NATURAL GAS RENTAL DOMESTIC MINMUM REQUIREMENTS:
WATER HEATING SYSTEM SHALL INCLUDE EXPANSION TANK
(35 GALLON), STORAGE TANK (175 GALLON), HOT WATER
BOILER (3000 MBH), BOILER CIRCULATING PRIMARY PUMP,
BUFFER TANK (MIN 139 GAL, DOMESTIC WATER HEAT
EXCHANGER, DOMESTIC HEATING, AND SECONDARY PUMP.
COORDINATE LOCATION
WITH VA COR
RENTAL WATER HEATING
SYSTEM PLACEHOLDER
KEYNOTES
P1 REMOVE CONCRETE PADS, WATER HEATERS, STORAGE TANK (DWST-1), EXPANSION
TANK (ET-3) AND ASSOCIATED GAS AND DOMESTIC WATER PIPING WITH ASSOCIATED
APPURTENANCES WHERE SHOWN.
P2 REMOVE GAS PIPING BACK TO MECH ROOM FOLLOWING PUTTING INTO SERVICE NEW
HEAT EXCHANGERS AND AFTER TEMPORARY WATER HEATING SYSTEM NO LONGER
REQUIRED. COORDINATE DEMOLITION WITH TEMPORARY WATER HEATING SYSTEM
(RENTAL UNIT) REQUIREMENTS.
P3 REMOVE 1-1/4" ATV UP THRU ROOF COMPLETE. COORDINATE WITH VA TO PATCH
FLOOR AND ROOF WHERE PIPING IS REMOVED.
P4 REMOVE CIRCULATION PUMPS 1,2, & 3 AND ASSOCIATED APPURTENANCES COMPLETE.
P5 REFER TO SYSTEM PIPING DIAGRAM FOR PIPE SIZES AND REQUIRED SPECIALTIES.
TYPICAL.
10.8 10.8
12.3 12.3
12.9 12.9
9.4 9.4
H.7
H.7
G.4
G.4
F.4
F.4
MECHANICAL
ENCLOSURE
1-1800A
AIR HANDLER
ROOM
1-1800
STAIR #09
1-S9-1
STAIR #08
1-S8-1
M1
M1
M1
M2M2M2
M3 M3
(E)HHWS
(E)BACK-UP WATER
HEATER HHWS/R
(E)HHWR
(E) 4" HHWS/R DN
4" TYP.
BOILER
OPERATOR
OFFICE
M4
TYP.
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
FIRST FLOOR MECHANICAL DEMO
PLANS
MD-101
MLPMLP
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC & INDICATE THE GENERAL EXTENT OF THE WORK.
PROVIDE PLUMBING SYSTEMS COMPLETE AND PER APPLICABLE CODES INCLUDING
REQUIRED COMPONENTS, OFFSETS REQUIRED TO AVOID THE STRUCTURE, ETC.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE STATE AND LOCAL
COUNTY DEPARTMENT OF HEALTH CROSS CONTAMINATION CODE REQUIREMENTS.
3. VERIFY DEPTH, SIZE, LOCATION AND CONDITION OF ALL UTILITIES IN THE FIELD, INCLUDING
POINTS OF CONNECTION, PRIOR TO STARTING ANY WORK. NOTIFY THE
ARCHITECT/ENGINEER OF ANY INTERFERENCES OR DISCREPANCIES.
4. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING AND PIPING WORK
WITH THE WORK OF ALL OTHER TRADES, EXISTING SITE CONDITIONS, AND EQUIPMENT
MANUFACTURER RECOMMENDATIONS. VERIFY ALL CLEARANCES PRIOR TO THE
FABRICATION OF ANY NEW WORK.
5. PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL MAINTAIN REQUIRED
CLEARANCES OVER, AROUND AND IN FRONT OF ALL ELECTRICAL EQUIPMENT, PANELS,
TRANSFORMERS, ETC. PIPING SHALL NOT INTERFERE WITH, OR BE INSTALLED IN A
LOCATION THAT RESTRICTS ACCESS OR CLEARANCE TO ELECTRICAL OR MECHANICAL
DEVICES. PROVIDE REQUIRED ACCESS AND CLEARANCE AROUND ALL EQUIPMENT PER
MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER
SUPPORT OF ALL PLUMBING SYSTEMS.
SCALE: 1/4" = 1'-0"
FIRST FLOOR MECHANICAL DEMO PLAN
PROVIDE DOMESTIC HOT WATER HEATING SYSTEM RENTAL.
COORDINATE OFF HOURS SYSTEMS INTEGRATION FOR GAS,
ELECTRIC, CW/HWR, & DOM. HW SUCH THAT PRIOR TO
DISABLING THE EXISTING DOMESTIC WATER HEATERS AND
STORAGE TANK SYSTEM, THE RENTAL SYSTEM IS AVAILABLE
FOR USE.
FOLLOWING THE RENTAL SYSTEM INTEGRATION AND
EXISTING SYSTEM ISOLATION THE EXISTING SYSTEM
DEMOLITION SHALL BE ALLOWED TO COMMENCE.
NATURAL GAS RENTAL DOMESTIC MINMUM REQUIREMENTS:
WATER HEATING SYSTEM SHALL INCLUDE EXPANSION TANK
(35 GALLON), STORAGE TANK (175 GALLON), HOT WATER
BOILER (3000 MBH), BOILER CIRCULATING PRIMARY PUMP,
BUFFER TANK (MIN 139 GAL, DOMESTIC WATER HEAT
EXCHANGER, DOMESTIC HEATING, AND SECONDARY PUMP.
COORDINATE LOCATION
WITH VA COR
RENTAL WATER HEATING
SYSTEM PLACEHOLDER
Revisions Date
KEYNOTES
M1 REMOVE 6" FLUE DUCT UP THRU ROOF COMPLETE. COORDINATE WITH VA TO PATCH
FLOORS AND ROOFS WHERE DUCTS ARE REMOVED.
M2 REMOVE 6" COMBUSTION AIR DUCT THRU WALL AND ASSOCIATED WALL CAP COMPLETE.
COORDINATE WITH VA TO PATCH WALLS WHERE DUCTS ARE REMOVED.
M3 REMOVE SOURCE WATER PUMP AND ASSOCIATED HEATING HOT WATER (SOURCE WATER)
PIPING ALONG WITH ASSOCIATED APPURTENANCES WHERE SHOWN.
M4 REFER TO SYSTEM PIPING DIAGRAM FOR PIPE SIZES AND REQUIRED SPECIALTIES.
10.8 10.8
12.3 12.3
12.9 12.9
9.4 9.4
H.7
H.7
G.4
G.4
F.4
F.4
MECHANICAL
ENCLOSURE
1-1800A
STAIR #09
1-S9-1
STAIR #08
1-S8-1
(E)CW
AIR HANDLER
ROOM
1-1800
(E)FD
(E)MIXING VALVE
ASSEMBLY TO REMAIN
P5
FIELD VERIFY AND
MAINTAIN (E)AHU COIL
PULL CLEARANCE
DWHX-3
DWHX-2
DWHX-1
CP-2
CP-1
H W
R H W
HW
HW
(E )C
W
(E )H
W
HWR
3"
3"
4" CONC.
PAD, TYP.
(E)FD
(E)FD
HWR
ET-3
DWST-1
ABOVE DUCT
(E)BLDG 22
HWR
TO TRAP
PRIMERS
DOM. CW TO BLDG 22 MIXING VALVES
DOM. HW TO BLDG 22 MIXING VALVES
C W
(E)BUILDING 1
HWR
(E)MIXING VALVE
ASSEMBLY TO REMAIN
(E)BUILDING 22 HWR
PUMP
(E)BUILDING 1
HWR PUMP
(E)MIXING
VALVE
ASSEMBLY TO
REMAIN
BLDG 22 DOM.
HW
BLDG 1 DOM.
HW
BOILER
OPERATOR
OFFICE
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
FIRST FLOOR PLUMBING PLANS
P-101 DesignerApprover
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC & INDICATE THE GENERAL EXTENT OF THE WORK.
PROVIDE PLUMBING SYSTEMS COMPLETE AND PER APPLICABLE CODES INCLUDING
REQUIRED COMPONENTS, OFFSETS REQUIRED TO AVOID THE STRUCTURE, ETC.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE STATE AND LOCAL
COUNTY DEPARTMENT OF HEALTH CROSS CONTAMINATION CODE REQUIREMENTS.
3. VERIFY DEPTH, SIZE, LOCATION AND CONDITION OF ALL UTILITIES IN THE FIELD, INCLUDING
POINTS OF CONNECTION, PRIOR TO STARTING ANY WORK. NOTIFY THE
ARCHITECT/ENGINEER OF ANY INTERFERENCES OR DISCREPANCIES.
4. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING AND PIPING WORK
WITH THE WORK OF ALL OTHER TRADES, EXISTING SITE CONDITIONS, AND EQUIPMENT
MANUFACTURER RECOMMENDATIONS. VERIFY ALL CLEARANCES PRIOR TO THE
FABRICATION OF ANY NEW WORK.
5. PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL MAINTAIN REQUIRED
CLEARANCES OVER, AROUND AND IN FRONT OF ALL ELECTRICAL EQUIPMENT, PANELS,
TRANSFORMERS, ETC. PIPING SHALL NOT INTERFERE WITH, OR BE INSTALLED IN A
LOCATION THAT RESTRICTS ACCESS OR CLEARANCE TO ELECTRICAL OR MECHANICAL
DEVICES. PROVIDE REQUIRED ACCESS AND CLEARANCE AROUND ALL EQUIPMENT PER
MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER
SUPPORT OF ALL PLUMBING SYSTEMS.
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLUMBING NEW WORK PLAN
KEYNOTES
P1 REMOVE CONCRETE PADS, WATER HEATERS, STORAGE TANK (DWST-1), EXPANSION
TANK (ET-3) AND ASSOCIATED GAS AND DOMESTIC WATER PIPING WITH ASSOCIATED
APPURTENANCES WHERE SHOWN.
P2 REMOVE GAS PIPING BACK TO MECH ROOM FOLLOWING PUTTING INTO SERVICE NEW
HEAT EXCHANGERS AND AFTER TEMPORARY WATER HEATING SYSTEM NO LONGER
REQUIRED. COORDINATE DEMOLITION WITH TEMPORARY WATER HEATING SYSTEM
(RENTAL UNIT) REQUIREMENTS.
P3 REMOVE 1-1/4" ATV UP THRU ROOF COMPLETE. COORDINATE WITH VA TO PATCH
FLOOR AND ROOF WHERE PIPING IS REMOVED.
P4 REMOVE CIRCULATION PUMPS 1,2, & 3 AND ASSOCIATED APPURTENANCES COMPLETE.
P5 REFER TO SYSTEM PIPING DIAGRAM FOR PIPE SIZES AND REQUIRED SPECIALTIES.
10.8 10.8
12.3 12.3
12.9 12.9
9.4 9.4
H.7
H.7
G.4
G.4
F.4
F.4
MECHANICAL
ENCLOSURE
1-1800A
STAIR #09
1-S9-1
STAIR #08
1-S8-1
(E)4 HHWS DN
(E)4 HHWR DN
HWCP-7
HWCP-8
AIR HANDLER
ROOM
1-1800
(E)FD
M4
FILED VERIFY AND
MAINTAIN (E)AHU COIL
PULL CLEARANCE
DWHX-3
DWHX-2
DWHX-1
ROUTE HHWS/R ABOVE
EXISTING DUCT, AS HIGH AS
POSSIBLE
HHWS
HHWR
H H
W S
HHWR
3"
3"
3"
(E)FD
(E)FD
BOILER
OPERATOR
OFFICE
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
FIRST FLOOR MECHANICAL PLANS
M-101
MLPMLP
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC & INDICATE THE GENERAL EXTENT OF THE WORK.
PROVIDE PLUMBING SYSTEMS COMPLETE AND PER APPLICABLE CODES INCLUDING
REQUIRED COMPONENTS, OFFSETS REQUIRED TO AVOID THE STRUCTURE, ETC.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE STATE AND LOCAL
COUNTY DEPARTMENT OF HEALTH CROSS CONTAMINATION CODE REQUIREMENTS.
3. VERIFY DEPTH, SIZE, LOCATION AND CONDITION OF ALL UTILITIES IN THE FIELD, INCLUDING
POINTS OF CONNECTION, PRIOR TO STARTING ANY WORK. NOTIFY THE
ARCHITECT/ENGINEER OF ANY INTERFERENCES OR DISCREPANCIES.
4. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING AND PIPING WORK
WITH THE WORK OF ALL OTHER TRADES, EXISTING SITE CONDITIONS, AND EQUIPMENT
MANUFACTURER RECOMMENDATIONS. VERIFY ALL CLEARANCES PRIOR TO THE
FABRICATION OF ANY NEW WORK.
5. PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL MAINTAIN REQUIRED
CLEARANCES OVER, AROUND AND IN FRONT OF ALL ELECTRICAL EQUIPMENT, PANELS,
TRANSFORMERS, ETC. PIPING SHALL NOT INTERFERE WITH, OR BE INSTALLED IN A
LOCATION THAT RESTRICTS ACCESS OR CLEARANCE TO ELECTRICAL OR MECHANICAL
DEVICES. PROVIDE REQUIRED ACCESS AND CLEARANCE AROUND ALL EQUIPMENT PER
MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER
SUPPORT OF ALL PLUMBING SYSTEMS.
SCALE: 1/4" = 1'-0"
2 FIRST FLOOR MECHANICAL NEW WORK PLAN
KEYNOTES
M1 REMOVE 6" FLUE DUCT UP THRU ROOF COMPLETE. COORDINATE WITH VA TO PATCH
FLOORS AND ROOFS WHERE DUCTS ARE REMOVED.
M2 REMOVE 6" COMBUSTION AIR DUCT THRU WALL AND ASSOCIATED WALL CAP COMPLETE.
COORDINATE WITH VA TO PATCH WALLS WHERE DUCTS ARE REMOVED.
M3 REMOVE SOURCE WATER PUMP AND ASSOCIATED HEATING HOT WATER (SOURCE WATER)
PIPING ALONG WITH ASSOCIATED APPURTENANCES WHERE SHOWN.
M4 REFER TO SYSTEM PIPING DIAGRAM FOR PIPE SIZES AND REQUIRED SPECIALTIES.
TYPICAL.
Revisions Date
T
AI
DI
M
SCS
DI
DO
DI
M
SCS
DI
DO
S S
S S
AO
NOTES:
1. MANUFACTURER AND MODEL SHOWN IN SCHEDULE IS BASIS OF DESIGN
2. PERFORMANCE IS BASED ON WATER.
3. COUNTER-CURRENT FLOW STAINLESS STEEL, BRAZED PLATE DOUBLE WALL HEAT EXCHANGER.
4. MOTORIZED BOILER WATER BYPASS VALVE
5. COMPLETE LAYOUT DRAWINGS REQUIRED WITH SUBMITTALS. CONSTRUCTION WORK WILL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE
BEEN APPROVED BY VA.
6. COORDINATE DEDICATED 120/1/60, 2 AMP CIRCUIT WITH DIVISION 26.
H H
W R
UNION (TYP)
BALL VALVE
(TYP)
2"
DWHX-1 DWHX-2 DWHX-3
TEMP SAFETY
RELIEF VA (TYP)
(E) CONC.
PAD (TYP)
3/4" DRAIN VALVE
W/HOSE END (TYP)
3" 140°F HW
3"
DWST-1 (900 GAL)
FINISHED FLOOR
HHWS
HHWR
EXTEND
RELIEF TO 6"
ABOVE FD
WYE STRAINER
WITH HOSE END
AND CAP WITH
CHAIN
H H
W S
H W
R
H W
S
H H
W R
H H
W S
H W
R
H W
S
H H
W R
H H
W S
H W
R
H W
S
(E)HWS(E)HWS (E)HWS
CP-1
CP-2
(E)HWR (E)HWR
HWCP-8
HWCP-7
3"
BYPASS,
(TYP)
3"
3"2"
2"
2-1/2"
3"
(E)CW
3"
HWR
M
(E)HHWR
(E)HHWS
(E )H
H W
S
2-1/2"
3"
T
HWS
INTEGRAL
CONTROLLER
BYPASS
CONTROL VALVE
2" 2" 2"
CW
2-1/2"
2-1/2"
2"
4" 4"
4" CONCRETE
HOUSEKEEP PAD
MOUNT ABOVE COIL
PULL CLEARANCE
SPACE
3/4" DRAIN BALL VALVE
AND PLUG (TYP)
3"
2" (FIELD
EXISTING
VERIFY
DIAMETER)
ET-3
1-1/2"
H W
S
H W
S
3"
C W
H W
C W
H W
3"
(E)CW DOM. CW SUPPLY
(E)BLDG 22
ARMSTRONG
BRAIN MODEL
DMC50-50FBS
DIGITAL MIXING
CENTER
(E)BLDG 1
ARMSTRONG
BRAIN MODEL
DMC50-50FBS
DIGITAL MIXING
CENTER
HWR
(E)BLDG 1
HWR PUMP
(E)BLDG 22
HWR PUMP
H W
R
C W
H W
C W
H W
H W
R
HWR
HWR
T W
T W
TO BLDG
FIXTURERS
TO BLDG
FIXTURERS
THERMOMETER
(TYP)
NOTES:
1. MANUFACTURER AND MODEL SHOWN IN SCHEDULE IS BASIS OF DESIGN
2. PERFORMANCE IS BASED ON WATER UNLESS NOTED OTHERWISE.
3. PUMPS SHALL BE NON-OVERLOADING.
4. WHEN VFD CONTROL IS SPECIFIED, PROVIDE WITH NEMA PREMIUM EFFICIENT MOTOR WITH AEGIS SHAFT GROUNDING RINGS.
5. COMPLETE LAYOUT DRAWINGS WILL BE REQUIRED BY PARAGRAPH, SUBMITTALS. CONSTRUCTION WORK WILL NOT START ON ANY SYSTEM UNTIL THE
LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.
HORIZONTAL INSTALLATION
UP FLOW VERTICAL INSTALLATION
NOTES:
1. PUMP SHALL BE SUPPORTED INDEPENDENTLY
FROM PIPING.
2. PROVIDE WITH FLEXIBLE CONNECTION FOR
PUMPS WITH MOTORS 1/2 HORSEPOWER AND
GREATER.
1/4 GAUGE LINE (TYP)
IN-LINE CIRCULATING PUMP
UNION TYPE CONNECTION (TYP)
PROVIDE CLEARANCE FOR PUMP
AND MOTOR REMOVAL
MOTOR BOLTED TO PUMP HOUSING.
INSTALL MOTOR DEAD LEVEL WITH
LUBRICATION POINTS UP
RIGIDLY SUPPORT PIPING ADJACENT
TO PUMP TO ALLOW PUMP REMOVAL
WITHOUT DISTURBING PIPING SYSTEM
TRIPLE DUTY VALVE
INDIRECT DOMESTIC WATER HEAT EXCHANGER SEQUENCE OF OPERATIONS:
NOTE: ALL SET POINTS AND TIME INTERVALS SHALL BE ADJUSTABLE BY THE SYSTEM OPERATOR.
1. WITH THE DOMESTIC WATER CP-1 & 2 AND HYDRONIC HEATINGSOURCE WATER PUMPS HWCP-7 & 8 HOA STARTERS IN THE AUTO POSITION THE DDC SYSTEM SHALL ENERGIZE THE LEAD PUMP. ONE OF THE TWO PUMPS SHALL BE DESIGNATED "LEAD PUMP" AND
SHALL OPERATE CONTINUOUSLY. THE OTHER PUMPS SHALL SERVE AS THE "STANDBY PUMP".
2. THE DDC SYSTEM SHALL ALTERNATE PUMP OPERATION BASED ON RUN TIME HOURS OR AT THE BEGINNING OF EACH MONTH.
3. EACH PUMP WILL PROVE OPERATION TO THE DDC SYSTEM WITH ITS CURRENT SWITCH. IF A PUMP FAILS, AN ALARM WILL BE SENT TO
THE DDC SYSTEM AND THE STANDBY PUMP WILL BE ACTIVATED.
4. NORMAL OPERATION: EACH SYSTEM HAS A 100% PUMP AND A 100% STANDBY PUMP. DOMESTIC WATER AND SOURCE WATER WILL FLOW THOUGH ALL THREE DOMESTIC WATER HEAT EXCHANGERS. AT ANY TIME, ONE OF THE DOMESTIC WATER HEAT EXCHANGERS CAN BE MANUALLY ISOLATED FOR REPAIR WORK. ONLY TWO DOMESTIC WATER HEAT EXCHAGERS ARE REQUIRED FOR THE PEAK
CALCULATED DEMAND.
5. INTEGRAL 3-WAY VALVES PACKAGED WITH DOMESTIC WATER HEAT EXCHANGERS SHALL BE MODULATED IN RESPONSE TO THE
STORAGE TANK WATER TEMPERATURE TO MAINTAIN 140 FEGREE F (ADJUSTABLE).
HOA STARTER
PUMP START/STOP
CP-1 & CP-2
DWST-1
HOA STARTER
PUMP START/STOP
HWCP-7 & HWCP-8
H H
W R
DWHX-1, DWHX-2, &
DWHX-3
H H
W S
H W
R
H W
S
UNIT
CONTROLLER
3-WAY
H H
W R
NOTES:
1. MANUFACTURER AND MODEL SHOWN IN SCHEDULE IS BASIS OF DESIGN
2. PERFORMANCE IS BASED ON WATER UNLESS NOTED OTHERWISE.
NOTES:
1. MANUFACTURER AND MODEL SHOWN IN SCHEDULE IS BASIS OF DESIGN
2. FIELD INSTALLED RELIEF VALVE, PIPE TO DRAIN
3. MFG'S INSTALATION KIT
4. FIELD INSTALLED THERMOSTAT WITH WELL.
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
MECHANICAL SCHEDULES AND
DIAGRAMS
M-600
MLPMLP
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
DOMESTIC WATER HEATER SCHEDULE
UNIT ID SYSTEM SERVED TYPE
CAPACITY
(MBH)
SOURCE SIDE - WATER LOAD SIDE - WATER
MANUFACTURER / MODEL NO. REMARKSFLOW (GPM) EWT (°F) LWT (°F)
WPD (FT
HD) FLOW (GPM) EWT (°F) LWT (°F)
WPD (FT
HD)
DWHX-1 DOMESTIC HOT WATER PLATE HX 1000 40 180 130 7.53 33 40 140 3.89 AERCO / EV-30 3-WAY
DWHX-2 DOMESTIC HOT WATER PLATE HX 1000 40 180 130 7.53 33 40 140 3.89 AERCO / EV-30 3-WAY
DWHX-3 DOMESTIC HOT WATER PLATE HX 1000 40 180 130 7.53 33 40 140 3.89 AERCO / EV-30 3-WAY
NO SCALE
DOMESTIC WATER HEAT EXCHANGER SYSTEM WITH SOURCE WATER
PUMP SCHEDULE
UNIT ID SYSTEM SERVED TYPE
FLOW
(GPM)
HEAD
(FT)
DUTY %
EFF
ELECTRICAL DISCONNECT STARTER
MANUFACTURER /
MODEL NO. REMARKSBHP HP VOLTS PHASE
FURN.
BY
INST.
BY TYPE TYPE SIZE
FURN.
BY
INST.
BY
CP-1 DOM. WATER HX & TANK RECIRC INLINE 66 25 71 .602 1 120 1 26 26 26 HOA - 26 26 B&G e-90 2AAB
BRONZE
CP-2 DOM. WATER HX & TANK RECIRC INLINE 66 25 71 .602 1 120 1 26 26 26 HOA - 26 26 B&G e-90 2AAB
BRONZE
HWCP-7 SOURCE (HEATING) WATER RECIRC INLINE 80 35 60.8 1.21 1.5 480 3 26 26 26 HOA - 26 26 B&G e-90 1.5AAB
HWCP-8 SOURCE (HEATING) WATER RECIRC INLINE 80 35 60.8 1.21 1.5 480 3 26 26 26 HOA - 26 26 B&G e-90 1.5AAB
NO SCALE
INLINE PUMP PIPING DIAGRAM
NO SCALE
INDIRECT DOMESTIC WATER HEAT EXCHANGER CONTROL DIAGRAM
EXPANSION TANK SCHEDULE
UNIT ID SYSTEM SERVED TYPE
MIN
PSIG
MAX
PSIG
MIN
(°F)
MAX
(°F)
ACCEPTA
NCE
VOLUME
(GAL)
TANK
VOLUME
(GAL)
DIA
(IN)
HEIGHT
(IN)
MANUFACTURER /
MODEL NO. REMARKS
ET-3 DOMESTIC HOT
WATER
DIAPHRAM 50.00 175.00 40 140 80 80 24" 55" B&G PTA 448V
STORAGE TANK SCHEDULE
UNIT ID SYSTEM SERVED
TANK
VOLUME
DIA.
(IN)
HEIGHT
(IN)
INSULATION
TYPE
JACKET
TYPE
MANUFACTURER /
MODEL NO. REMARKS
DWST-1 DOMESTIC HOT
WATER
900 67" 95" FIBERGLASS STEEL AQUAPLEX L 900A-TR
250N
300N
225N
200N
175N
150N
125N
110N
350N
30N
35N
40N
45N
50N
60N
70N
80N
90N
100N
450N
400N
25N
20N
15N
800N
700N
600N
500N
1000N
1200N
1600N
2000N
2500N
3000N
4000N
5000 5000N
6000 6000N
30S
35S
40S
45S
50S
60S
70S
80S
90S
100S
25S
20S
15S
3 WIRE WITH GROUND 4 WIRE WITH GROUND
COND.
SIZE
FEEDER
(AMPS)
1/0
2/0
3/0
4/0
2-4/0
2-250
2-350
2-500
2-600
3-500
3-600
4-600
5-600
7-500
8-500
10-600
3#12, 1#12 GND IN 3/4"C
3#12, 1#12 GND IN 3/4"C
3#10, 1#10 GND IN 3/4"C
3#10, 1#10 GND IN 3/4"C
3#8, 1#10 GND IN 3/4"C
3#8, 1#10 GND IN 3/4"C
3#6, 1#10 GND IN 3/4"C
3#6, 1#10 GND IN 3/4"C
3#4, 1#10 GND IN 1"C
3#4, 1#8 GND IN 1"C
3#3, 1#8 GND IN 1"C
3#2, 1#8 GND IN 1 1/4"C
3#1, 1#8 GND IN 1 1/4"C
3#2, 1#6 GND IN 1 1/4"C
3#1, 1#6 GND IN 1 1/4"C
3#1/0, 1#6 GND IN 1 1/2"C
3#2/0, 1#6 GND IN 1 1/2"C
3#3/0, 1#6 GND IN 2"C
3#4/0, 1#4 GND IN 2"C
3-250 KCMIL, 1#4 GND IN 2"C
3-350 KCMIL, 1#4 GND IN 2 1/2"C
3-500 KCMIL, 1#3 GND IN 3"C
3-600 KCMIL, 1#3 GND IN 3 1/2"C
(2) 3#4/0, 1#2 GND IN 2"C
(2) 3-250 KCMIL, 1#2 GND IN 2 1/2"C
(2) 3-350 KCMIL, 1#1 GND IN 2 1/2"C
(2) 3-500 KCMIL, 1#1/0 GND IN 3"C
(2) 3-600 KCMIL, 1#1/0 GND IN 3 1/2"C
(3) 3-500 KCMIL, 1#2/0 GND IN 3"C
(3) 3-600 KCMIL, 1#3/0 GND IN 4"C
(4) 3-600 KCMIL, 1#4/0 GND IN 4"C
(5) 3-600 KCMIL, 1-250 KCMIL GND IN 4"C
(7) 3-500 KCMIL, 1-350 KCMIL GND IN 3 1/2"C
(8) 3-500 KCMIL, 1-400 KCMIL GND IN 3 1/2"C
(10) 3-600 KCMIL, 1-500 KCMIL GND IN 4"C
1/0
2/0
3/0
4/0
2-4/0
2-250
2-350
2-500
2-600
3-500
3-600
4-600
5-600
7-500
8-500
10-600 (10) 4-600 KCMIL, 1-500 KCMIL GND IN 4"C
(8) 4-500 KCMIL, 1-400 KCMIL GND IN 3 1/2"C
(7) 4-500 KCMIL, 1-350 KCMIL GND IN 3 1/2"C
(5) 4-600 KCMIL, 1-250 KCMIL GND IN 4"C
(4) 4-600 KCMIL, 1#4/0 GND IN 4"C
(3) 4-600 KCMIL, 1#3/0 GND IN 4"C
(3) 4-500 KCMIL, 1#2/0 GND IN 3 1/2"C
(2) 4-600 KCMIL, 1#1/0 GND IN 4"C
(2) 4-500 KCMIL, 1#1/0 GND IN 3 1/2"C
(2) 4-350 KCMIL, 1#1 GND IN 3"C
(2) 4-250 KCMIL, 1#2 GND IN 2 1/2"C
(2) 4#4/0, 1#2 GND IN 2 1/2"C
4-600 KCMIL, 1#3 GND IN 4"C
4-500 KCMIL, 1#3 GND IN 3 1/2"C
4-350 KCMIL, 1#4 GND IN 3"C
4-250 KCMIL, 1#4 GND IN 2 1/2"C
4#4/0, 1#4 GND IN 2 1/2"C
4#3/0, 1#6 GND IN 2"C
4#2/0, 1#6 GND IN 2"C
4#1/0, 1#6 GND IN 2"C
4#1, 1#6 GND IN 1 1/2"C
4#2, 1#6 GND IN 1 1/4"C
4#1, 1#8 GND IN 1 1/2"C
4#2, 1#8 GND IN 1 1/2"C
4#3, 1#8 GND IN 1 1/4"C
4#4, 1#8 GND IN 1 1/4"C
4#4, 1#10 GND IN 1 1/4"C
4#6, 1#10 GND IN 1"C
4#6, 1#10 GND IN 1"C
4#8, 1#10 GND IN 3/4"C
4#8, 1#10 GND IN 3/4"C
4#10, 1#10 GND IN 3/4"C
4#10, 1#10 GND IN 3/4"C
4#12, 1#12 GND IN 3/4"C
4#12, 1#12 GND IN 3/4"C
COPPER FEEDER SCHEDULE
COND.
SIZE
FEEDER
(AMPS)
12-600 (12) 3-600 KCMIL, 1-700 KCMIL GND IN 4"C 12-600 (12) 4-600 KCMIL, 1-700 KCMIL GND IN 4"C
15-600 (15) 3-600 KCMIL, 1-500 KCMIL GND IN 4"C 15-600 (15) 4-600 KCMIL, 1-800 KCMIL GND IN 4"C
2 WIRE WITH GROUND
COND.
SIZE
FEEDER
(AMPS)
2#12, 1#12 GND IN 3/4"C
2#12, 1#12 GND IN 3/4"C
2#10, 1#10 GND IN 3/4"C
2#10, 1#10 GND IN 3/4"C
2#8, 1#10 GND IN 3/4"C
2#8, 1#10 GND IN 3/4"C
2#6, 1#10 GND IN 3/4"C
2#6, 1#10 GND IN 3/4"C
2#4, 1#10 GND IN 1"C
2#4, 1#8 GND IN 1"C
2#3, 1#8 GND IN 1"C
2#2, 1#8 GND IN 1"C
2#1, 1#8 GND IN 1 1/4"C
NOTES:
1. AMPACITIES FOR FEEDER SIZES ARE BASED ON N.E.C. CODE 110-14. (TERMINATION PROVISIONS FOR EQUIPMENT RATED 100A OR LESS ARE RATED FOR USE WITH CONDUCTORS RATED 60°C. TERMINATION PROVISIONS FOR EQUIPMENT RATED GREATER THAN
100A ARE RATED FOR USE WITH CONDUCTORS RATED 75°C.).
2. CONDUIT FILL IS BASED ON 40% FILL USING SINGLE CONDUCTOR BUILDING WIRE OF INSULATION TYPES THHN, THWN, THWN-2, XHH, XHHW, AND XHHW-2 IN RMC. FOR OTHER RACEWAY TYPES REFER TO APPROPRIATE N.E.C. APPENDIX C TABLES.
3. EQUIPMENT GROUND SIZING BASED ON N.E.C. TABLE 250.122.
DEMOLITION KEYNOTE NUMBER 1
CONSTRUCTION KEYNOTE NUMBER 1
SECTION NUMBER 4
DRAWING NOTATION
SHEET E300 ON WHICH
SECTION VIEW IS PLACED
E300
DRAWING INDEX
SHEET
NO
J
M
JUNCTION BOX
ELECTRICAL PANEL
T TRANSFORMER
RECEPTACLE - DUPLEX TYPE
RECEPTACLE - SIMPLEX TYPE
RECEPTACLE - QUADRUPLEX TYPE
RECEPTACLE - DUPLEX TYPE 6" ABOVE COUNTER
RECEPTACLE - SPECIALTY TYPE
METER
GROUNDING BAR
DISCONNECT SWITCH - NON-FUSED
DISCONNECT SWITCH - FUSED
DISCONNECT SWITCH - COMBINATION MOTOR STARTER
POWER SYMBOL LIST
GROUND
GROUNDING ROD
M MOTOR RATED SWITCH
RECEPTACLE - DUPLEX/USB COMBINATION TYPEUSB
NOTES:
1. ALL DEVICE RATINGS/SIZES SHALL BE COORDINATED WITH PLANS AND
SCHEDULES.
MOTOR - SINGLE PHASE
MOTOR - THREE PHASE
CONDUIT DOWN
CONDUIT UP
ELECTRICAL ABBREVIATIONS
DESCRIPTIONSYMBOL
(E)
FACP
FA
AIC
CB
EMT
EWC
AFF
A
AF
AWG
AT
ATS
C
CU
CT
DIA
DISC
EPO
EQUIPMENT
DESCRIPTIONSYMBOLDESCRIPTIONABBREV. DESCRIPTION
E100
SHEET E100 ON WHICH SECTION IS CUT
(ENLARGED PARTIAL PLAN SIMILAR)
SCALE: 1/4" = 1' - 0"
SECTION
SECTION NUMBER 4
S
FLA
F
G/GND
GFCI/GFI
HOA
HP
IG
KV
KVA
KW
KWH
LP
MCB
MDP
MLO
MAX
MIN
NEC
NEMA
N/NEU
NF
NC
NO
NIC
PH/Ø
P
PF
PVC
(R)
(RR)
RMC
RP
TBB
TYP
UC
UL
UPS
USB
V
VA
W
WG
WP
XFMR
COPPER FEEDER SIZE TAG
(REFER TO FEEDER SCHEDULE)
ALUMINUM FEEDER SIZE TAG
(REFER TO FEEDER SCHEDULE)
EQUIPMENT TAG
EXISTING DEVICES OR EQUIPMENT
NEW OR MODIFIED DEVICES OR EQUIPMENT
NEW OR MODIFIED UNDERGROUND WIRING
EXISTING SYSTEM COMPONENT TO BE REMOVED
POINT OF NEW CONNECTION.
ABOVE FINISHED FLOOR
AMPERE
AMPERE FUSE/AMPERE FRAME
AMERICAN WIRE GAUGE
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
AVAILABLE INTERRUPTING CURRENT (AMPS)
CONDUIT OR CEILING MOUNTED
CIRCUIT BREAKER
COPPER
CURRENT TRANSFORMER
DIAMETER
DISCONNECT
ELECTRICAL METALLIC TUBING
ELECTRIC WATER COOLER
EMERGENCY POWER OFF
EXISTING ELECTRICAL EQUIPMENT/WORK TO REMAIN
FIRE ALARM
FIRE ALARM CONTROL PANEL
FULL LOAD AMPS
FUSE
GROUND
GROUND FAULT CIRCUIT INTERRUPTER
HAND-OFF-AUTO
HORSEPOWER
ISOLATED GROUND
KILOVOLT
KILOVOLT AMPERE
KILOWATT
KILOWATT HOUR
LIGHTING PANEL
MAIN CIRCUIT BREAKER
MAIN DISTRIBUTION PANEL
MAIN LUG ONLY
MAXIMUM
MINIMUM
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS ASSOC.
NEUTRAL
NON-FUSIBLE
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
PHASE
POLE
POWER FACTOR
POLYVINYL CHLORIDE (PLASTIC)
RELOCATED EXISTING ELECTRICAL EQUIPMENT
REMOVE AND REINSTALL
RIGID METALLIC CONDUIT
RECEPTACLE PANEL
TELEPHONE BACKBOARD
TYPICAL
UNDERCOUNTER
UNDERWRITERS LABORATORIES
UNINTERRUPTIBLE POWER SUPPLY
UNIVERSAL SERIAL BUS
VOLT
VOLT AMPERE
WATT
WIRE GUARD
WEATHERPROOF
TRANSFORMER
PT POKE-THRU
VFD VARIABLE FREQUENCY DRIVE
FB FLOOR BOX
CORD REELC
UON UNLESS OTHERWISE NOTED
INV INVERTER
EC ELECTRICAL CONTRACTOR
1A
Z1 DAYLIGHTING CONTROL ZONE '1'
(MAY NOT APPEAR ON EVERY
TAG)
SCENE SCHEDULE ID 'A' (MAY
NOT APPEAR ON EVERY TAG) LIGHTING CONTROL
SPACE TYPE '1'
LIGHTING CONTROL TAG
NOTE: THE TAG DOES NOT REFLECT THE QUANTITY OF CONTROL DEVICES
REQUIRED IN AREA.
LIGHTING FIXTURE TAG
FIXTURE MOUNTING HEIGHT (MAY
NOT APPEAR ON EVERY TAG)
NORMAL CIRCUIT, EMERGENCY
LIGHTING INVERTER, OR
GENERATOR CIRCUIT (MAY NOT
APPEAR ON EVERY TAG)
LIGHTING FIXTURE TYPE
L1
INV1
13'-0"
APPLICABLE CODES
AND REGULATIONS
CODEYEAR
INTERNATIONAL BUILDING CODE (IBC)2024
NATIONAL ELECTRICAL CODE (NEC)
NFPA 101 LIFE SAFETY CODE2024
E-000 ELECTRICAL GENERAL INFORMATION
E-100 BASEMENT ELECTRICAL PLANS
E-101 FIRST FLOOR ELECTRICAL PLANS
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
ELECTRICAL GENERAL
INFORMATION
E-000
ELBSET
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
10.8
12.3
12.9
9.4
H.7G.4F.4
STAIR #2
1-EC0S2
STAIR #1
1-EC0S1
BOILER ROOM
1-B800
EMCC-E-BEC-C1
DP-N-BEC-A1
RP-N-BEC-A2
RP-E-BEC-C2
RP-E-BEC-C3
NSWBD-2
T
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
BASEMENT ELECTRICAL PLANS
E-100
ELBSET
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
POWER GENERAL NOTES
1. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
2. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
SCALE: 1/4" = 1'-0"
1 BASEMENT ELECTRICAL EXISTING PLAN
SHOWN FOR REFERENCE ONLY. NO NEW WORK.
M
J
M M
M
H.3
H.3
10.8 10.8
12.3 12.3
12.9 12.9
9.4 9.4
H.7
H.7
G.4
G.4
F.4
F.4
MECHANICAL
ENCLOSURE
1-1800A
AIR HANDLER
ROOM
1-1800
STAIR #09
1-S9-1
STAIR #08
1-S8-1
D2
D2
D2
D1
D1
D1
D1
D1
(E)CP-2
(E)CP-02
(E)CP-1
CP-3
CP-2
CP-1
HWCP-8HWCP-7
HWCP-7 HWCP-8
D1 D1
(E)CP-3
RP-E-BEC-C3-15
RP-E-BEC-C3-33
RP-E-BEC-C3-26,28,30
RP-E-BEC-C3-7
RP-E-BEC-C3-9
RP-E-BEC-C3-31
RP-E-BEC-C3-29
RP-E-BEC-C3-5
(E)CP-01
BLDG. 22
HWR PUMP
BLDG. 1
HWR PUMP
RP-E-BEC-C2-23,25,27RP-E-BEC-C2-17,19,21
BOILER
OPERATOR
OFFICE
H.3
H.3
10.8 10.8
12.3 12.3
12.9 12.9
9.4 9.4
H.7
H.7
G.4
G.4
F.4
F.4
MECHANICAL
ENCLOSURE
1-1800A
AIR HANDLER
ROOM
1-1800
STAIR #09
1-S9-1
STAIR #08
1-S8-1
E1
CP-2
CP-1
HWCP-8
HWCP-7
DWHX-2
DWHX-1
DWHX-3
E2
E2
E2
E2
HWCP-7
HWCP-8
CP-1
CP-2
NEMA1
NEMA1
NEMA1
NEMA1
E2
E2
E2
100S
RP-E-2EC-C4-11,13
RP-E-BEC-C2-17,19,21
RP-E-BEC-C2-23,25,27
RP-E-BEC-C3-7
RP-E-BEC-C3-9
RP-E-BEC-C3-33
RP-E-BEC-C3-31
RP-E-BEC-C3-29
E3
E3
RP-E-BEC-C3-5
BLDG. 22
HWR PUMP
BLDG. 1
HWR PUMP
(E)CP-3
(E)CP-01
CP-3
RP-E-BEC-C3-26,28,30
BOILER
OPERATOR
OFFICE
E1
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhaseSTAMCONSULTANT
321 4 5 6 7 8 9 1
Office of Construction and Facilities Management
Project Schedule Date
ARCHITECT/ENGINEER OF RECORD
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
Energy Center Water Heater Replacement
01.24.2025
FIRST FLOOR ELECTRICAL PLANS
E-101
ELBSET
655-23-201
Saginaw, Michigan (655)
EC
100% Bid Documents
POWER GENERAL NOTES
1. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
2. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
SCALE: 1/4" = 1'-0"
1 FIRST FLOOR ELECTRICAL DEMO PLAN
SCALE: 1/4" = 1'-0"
2 FIRST FLOOR ELECTRICAL NEW WORK PLAN
ELECTRICAL DEMOLITION KEYNOTES
D1 MECHANICAL EQUIPMENT FEEDERS TO BE REMOVED COMPLETE BACK TO
SOURCE.
D2 MAINTAIN EXISTING CIRCUIT. RELOCATE EXISTING UNISTRUT MOUNTED
DISCONNECT AS REQUIRED AND CONNECT TO NEW EQUIPMENT. REFER TO NEW
WORK PLAN.
ELECTRICAL NEW WORK KEYNOTES
E1 PROVIDE TEMPORARY POWER FOR PORTABLE BOILER SYSTEM. PROVIDE A NEW
100A, 2-POLE BREAKER IN PANEL RP-E-2EC-C4 IN THE ENERGY CENTER ON THE
SECOND FLOOR AND TEMPORARY CONDUCTORS TO FEED THE TEMPORARY
BOILER SYSTEM. COORDINATE FINAL REQUIREMENTS WITH EQUIPMENT PROVIDER
PRIOR TO PURCHASE AND INSTALLATION.
E2 RECONNECT NEW EQUIPMENT TO EXISTING CIRCUITS MAINTAINED DURING DEMO.
E3 DISCONNECTS TO BE MOUNTED ON UNISTRUT FRAME THAT IS BOLTED TO THE
FLOOR IN APPROXIMATION TO THE UNIT IT SERVES. CONTRACTOR TO VERIFY
LOCATION IN FIELD.
BOLD TEXT INDICATES NEW DEVICE TO BE INSTALLED IN EXISTING EQUIPMENT.
NOTES:
TOTAL DEMAND: 88 A
TOTAL CONNECTED: 88 A
DEMAND LOAD: 32 kVA
CONNECTED LOAD: 32 kVA
POWER 31721 VA 100.00% 31721 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED LOAD PANEL TOTALS
TOTAL AMP: 151 A 10 A 137 A
TOTAL LOAD: 16061 VA 1250 VA 14411 VA
41 SPACE -- -- 0 0 -- -- SPACE 42
39 SPACE -- -- 0 0 -- -- SPACE 40
37 SPACE -- -- 0 0 -- -- SPACE 38
35 SPACE -- -- 0 0 -- -- SPACE 36
33 SPACE -- -- 0 0 -- -- SPACE 34
31 SPACE -- -- 0 0 -- -- SPACE 32
29 SPACE -- -- 0 0 -- -- SPACE 30
27 250 0 -- -- SPACE 28
BLOCK HEATER 60 A 2
250 0 -- -- SPACE 26
23 SPARE 20 A 1 0 0 1 20 A SPARE 24
21 SPARE 20 A 1 0 0 1 20 A SPARE 22
19 SPARE 20 A 1 0 0 1 20 A SPARE 20
17 SPARE 20 A 1 0 0 1 20 A SPARE 18
15 SPARE 20 A 1 0 0 1 20 A SPARE 16
13 14411 0 1 20 A SPARE 14
11 TEMPORARY POWER FOR PORTABLE BOILER
SYSTEM
100 A 2
14411 0 1 20 A SPARE 12
9 BATTERY CHARGER 20 A 1 500 0 1 20 A SPARE 10
7 UH-5 + UH-6 20 A 1 1000 200 1 20 A LOUVER MOTORS 8
5 0 0 1 20 A SPARE 6
3 0 500 1 20 A DAYTANK LEVEL/PUMP ALARM 4
SPARE 40 A 3
0 200 1 20 A DDC CONTROL PANEL 2
CKT DESCRIPTION
BKR
SIZE P A B C P
BKR
SIZE DESCRIPTION CKT
NEUTRAL: 100.00% MIN A.I.C. RATING:
MOUNTING: SURFACE GROUND BUS: STANDARD WIRE: 4
ENCLOSURE: TYPE 1 BUSSING: 225 A PHASE: 3
PANEL LOCATION: BOILER ROOM 1-B800 MAIN: 150 A VOLTAGE: 120/208 Wye
PANEL NAME: RP-E-2EC-C4
| Sheets |
| G-001 - COVER SHEET |
| M-000 - MECHANICAL GENERAL INFORMATION |
| PD-101 - FIRST FLOOR PLUMBING DEMO PLANS |
| MD-101 - FIRST FLOOR MECHANICAL DEMO PLANS |
| P-101 - FIRST FLOOR PLUMBING PLANS |
| M-101 - FIRST FLOOR MECHANICAL PLANS |
| M-600 - MECHANICAL SCHEDULES AND DIAGRAMS |
| E-000 - ELECTRICAL GENERAL INFORMATION |
| E-100 - BASEMENT ELECTRICAL PLANS |
| E-101 - FIRST FLOOR ELECTRICAL PLANS |