About this file

This is a Scope of Work document prepared by the Iowa Department of Natural Resources (DNR) Engineering Section for a roadway patching project at Springbrook State Park in Guthrie County. The project involves Hot Mix Asphalt (HMA) full depth road patches within the campground area, comprising five distinct patches with a combined total of 129.9 square yards. Patch #1 measures 91.1 square yards, Patch #2 measures 2.0 square yards, Patch #3 measures 5.3 square yards, Patch #4 measures 6.1 square yards, and Patch #5 measures 25.4 square yards. The work includes removal of existing HMA pavement (assumed 6 inches thick), placement of IDOT Special Backfill as necessary to level the subgrade, and installation of new HMA patches. The bid date is December 11, 2025, and proposals must be submitted electronically to constructionbids@dnr.iowa.gov by 3:00 PM CST. Contractors are required to visit the project site prior to bidding to verify actual locations, elevations, and job conditions. No work is permitted from Friday at noon until sunrise Monday. The contractor bears responsibility for site restoration, traffic control, waste disposal, utility verification, and erosion control measures including seeding, silt fence, and silt basins as needed.

The document specifies that bidders shall submit lump sum bids or clearly identified unit prices without alternates, qualifications, or reservations. The project manager is Zach Gunsolley (515.250.3713, zach.gunsolley@dnr.iowa.gov), and the procurement specialist is Darin Galbraith (515-344-0055, darin.galbraith@dnr.iowa.gov). The contractor must verify all dimensions and conditions at the site and notify the DNR Engineer of any discrepancies prior to proceeding with work. Contractor proposals remain valid for 45 days from the submission deadline. The DNR reserves the unconditional right not to award the contract and will notify both successful and unsuccessful bidders of results. The commodity codes associated with this project are 91395 (Paving and Resurfacing, Highway and Road) and 98800 (Roadside, Grounds, Recreational and Park Area Services), indicating the project is open to standard construction and road maintenance contractors. No specific budget amount, set-aside designations, or disadvantaged enterprise restrictions are detailed in the scope of work document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Zachary A. Gunsolley Date License Number: 18702 My license renewal date is December 31, 2025 Pages or sheets covered by this seal:

All

HMA full depth road patches in Springbrook campground.

Iowa Department of Natural Resources Construction Documents for

Springbrook State Park Guthrie County, Iowa

HMA Roadway Patches Project No. 25-04-39-03

Iowa DOT Project No. SP-00SP-0(13)—7C-00

Project Location Map

N

Sheet Index

Cover Sheet Project Overview Quantities & Est. Reference Information General Information & Patch Details Patch Details

Iowa DNR

Zach Gunsolley

515.250.3713 zach.gunsolley@dnr.iowa.gov

1517 185th Ave

Diagonal, IA 50845

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Directory Project Manager

Organization

Contact

Phone

Email

Address

City, State, Zip

District Engineer Organization

Contact

Phone

Email

Address

City, State, Zip

Project Description

Project Number:

25-04-39-03

Bid Date:

12/11/2025

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

HMA Roadway Patches Springbrook State Park, Guthrie County

Sheet No:Drawn by: ZG

C:

\U se rs

\Z ac h Gu ns ol le y\

De sk to p\

-0

4-

-0

Sp rin gb ro ok P at ch es in

R oa dw ay

\2 5-

-3

9-

P la ns .d w g

/2

3/

2:

P M

Pl ot

D at e:

Revision Date Cover Sheet

Project Area

Iowa DNR

Zach Gunsolley

515.250.3713 zach.gunsolley@dnr.iowa.gov

1517 185th Ave

Diagonal, IA 50845

AutoCAD SHX Text Zachary A. Gunsolley 18702

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text W

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO

N

Project Number:

25-04-39-03

Bid Date:

12/11/2025

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

HMA Roadway Patches Springbrook State Park, Guthrie County

Sheet No:Drawn by: ZG

C:

\U se rs

\Z ac h Gu ns ol le y\

De sk to p\

-0

4-

-0

Sp rin gb ro ok P at ch es in

R oa dw ay

\2 5-

-3

9-

P la ns .d w g

/2

3/

2:

P M

Pl ot

D at e:

Revision Date 2Project Overview

Park Map

0' 100' 200'

N

0' 20' 40'

Location Map

Location Map

Park Office

Patch #1

Patch #2

Patch #3

Campground

Patch #4

Patch #5

Estimated Quantities Estimate Reference Information 1.

2.

3.

4.

See referenced IDOT specification for work included in this item. Existing HMA thickness assumed 6."

See referenced IDOT specification for work included in this item. Existing HMA thickness assumed 6."

Place IDOT Special Backfill as necessary after pavement removal to bring subgrade to required depth.

Place temporary Special Backfill to backfill pavement removed if new HMA patch will not be constructed in the same day as pavement removal to maintain traffic (incidental to this item). Only Special Backfill to remain for subgrade leveling ahead of HMA patch will be measured for payment.

Incidental to this item: Site restoration and traffic control necessary to perform work.

Project Number:

25-04-39-03

Bid Date:

12/11/2025

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

HMA Roadway Patches Springbrook State Park, Guthrie County

Sheet No:Drawn by: ZG

C:

\U se rs

\Z ac h Gu ns ol le y\

De sk to p\

-0

4-

-0

Sp rin gb ro ok P at ch es in

R oa dw ay

\2 5-

-3

9-

P la ns .d w g

/2

3/

2:

P M

Pl ot

D at e:

Revision Date Quantities and Estimate Reference Information

Existing

HMA

Existing Road Section

Proposed Road Section

6" 6"

New HMA Patch

Special Backfill as necessary to level subgrade

General Information

1. Verify actual locations and elevations with DNR Engineer.

2. All work shall conform to and be performed in accordance with all applicable codes and ordinances.

3. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specification, special provisions and contract.

4. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.

5. It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.

6. The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.

7. Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only.

It is possible there may be others, the existence of which is presently not known or shown. It is the contractor’s responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work.

8. The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.

9. The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.

10. No work allowed from Friday at noon until sunrise Monday.

Project Number:

25-04-39-03

Bid Date:

12/11/2025

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

HMA Roadway Patches Springbrook State Park, Guthrie County

Sheet No:Drawn by: ZG

C:

\U se rs

\Z ac h Gu ns ol le y\

De sk to p\

-0

4-

-0

Sp rin gb ro ok P at ch es in

R oa dw ay

\2 5-

-3

9-

P la ns .d w g

/2

3/

2:

P M

Pl ot

D at e:

Revision Date General Information & Patch Details

Patch #1 91.1 SY

Project Number:

25-04-39-03 Bid Date:

12/11/2025 Iowa Department of Natural Resources

Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

HMA Roadway Patches Springbrook State Park, Guthrie County

Sheet No:Drawn by: ZG

C:

\U se rs

\Z ac h Gu ns ol le y\

De sk to p\

-0

4-

-0

Sp rin gb ro ok P at ch es in

R oa dw ay

\2 5-

-3

9-

P la ns .d w g

/2

3/

2:

P M

Pl ot

D at e:

Revision Date Patch Details

Patch #5 25.4 SY

Patch #2 2.0 SY Patch #3 5.3 SY Patch #4 6.1 SY

Sheets and Views
25-04-39-03 Plans-1
25-04-39-03 Plans-2
25-04-39-03 Plans-3
25-04-39-03 Plans-4
25-04-39-03 Plans-5
2025-11-23T12:05:01-0600
Zach Gunsolley

File details come from the government source that posted it. Updated .