Programmable_Logic_Controller_(PLC)_Replacement_and_Modifications_to_Supervisory_Control_and_Data_Acquisition_(SCADA)..pdf
PDF 485 KB Posted
- Solicitation number
- FY26-RFP-036
- Issued by
- Santa Fe County, New Mexico
About this file
This Request for Proposals (RFP #FY26-RFP-036) is issued by the City of Santa Fe Central Purchasing Division on behalf of Buckman Direct Diversion (BDD) for professional services to replace key Programmable Logic Controllers (PLCs) and support the Supervisory Control and Data Acquisition (SCADA) system at the BDD water treatment facility. The project scope includes furnishing labor, equipment, materials, and programming expertise for the installation, integration, testing, documentation, and training of four PLC replacements: Pall Membrane, Ozone, Advanced Treatment Facility, and Granulated Activated Carbon units. All PLCs must be programmed using Schneider Electric Unity Pro XL software and integrated into the existing SCADA system. The contractor must provide updated control system drawings, schematics, and programming files (.STU format), along with comprehensive documentation and on-call support services. Due to operational constraints, all replacement work must be scheduled during the low-demand period of October through March. The RFP was issued on November 19, 2025, with written questions due by December 4, 2025, and proposals due electronically via the OpenGov Procurement Portal by December 18, 2025, at 3:00 PM. The procurement schedule includes a pre-proposal meeting on December 2, 2025, blind evaluation on December 19, 2025, interviews on December 23, 2025, and anticipated contract award on January 28, 2026. This is a single-award procurement for exclusive use by BDD and the City of Santa Fe only.
Proposals will be evaluated using a best-value approach with scoring weighted as follows: Scope/Level of Expertise Plan (35 percent), Value Added Plan (10 percent), Cost Proposal (30 percent), and Interview (25 percent), with an additional 3 to 6 percent for local preference consideration. The pricing proposal must include line-item costs for control system drawings, hardware procurement, installation and wiring, programming and configuration, testing and commissioning, training and handover, and both emergency on-call and routine on-call services by hourly rate. Offerors must submit their proposals in PDF format through OpenGov, with separate uploads for public proposal, confidential proposal, and cost proposal components. All proposals must remain firm for 180 days after submission. The use of subcontractors is permitted with prior written City approval, and the prime contractor remains wholly responsible for contract performance. Local preference qualifications are available for resident businesses certified by the New Mexico Taxation and Revenue Department, with certification required for consideration. The RFP imposes mandatory requirements including Campaign Contribution Disclosure Forms, Conflict of Interest Statements, Non-Collusion Affidavits, and Responsibility Disclosures regarding debarment, criminal history, and financial delinquency. Contractor personnel must comply with the City of Santa Fe Living Wage Ordinance. The procurement manager is Gutema Ayana, Contract Administrator, reachable at gxayana@santafenm.gov or (925) 398-9507.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The City of Santa Fe (City), Central Purchasing Division (CPD)
AND
Buckman Direct Diversion
REQUEST FOR PROPOSALS (RFP)
RFP#: FY26-RFP-036 - Programmable Logic Controller (PLC)
Replacement and Modifications to Supervisory Control and Data
Acquisition (SCADA).
Table Of Contents
1. INTRODUCTION
2. CONDITIONS GOVERNING THE PROCUREMENT
3. RESPONSE FORMAT AND ORGANIZATION
4. SCOPE OF WORK
5. EVALUATION
6. EVALUATION PHASES
7. PRICING PROPOSAL
8. VENDOR QUESTIONNAIRE
9. ATTACHMENTS
Attachments:
A - Contract - Programmable Logic Controller (PLC) Replacement and Modifications to Supervisory Control
And Data Acquisition (SCADA)
B - FY26RFP036 PCL & SCADA Final 11.18.25
1. INTRODUCTION
1.1. PURPOSE OF THIS RFP
On behalf of the Buckman Direct Diversion (BDD), the City of Santa Fe is seeking qualified contractors to provide professional services for the replacement of key Programmable Logic Controllers (PLCs) and to support the SCADA system. The project includes furnishing labor, equipment, materials, and programming expertise necessary for installation, integration, testing, documentation, and training. The goal is to ensure continued reliable operations of BDD's water treatment processes by updating aging control systems with modern, efficient, and fully supported equipment. PLC and SCADA replacements must be scheduled during low-demand periods (October-March) to avoid disruption to operations. In addition, the project will require coordination with BDD staff to ensure seamless integration, updated documentation, and training for operators.
Successful completion will improve system performance, minimize downtime, and strengthen operational resilience for years to come.
1.2. BACKGROUND INFORMATION
BDD relies on PLCs and the SCADA system to monitor and control critical water treatment operations. Several of these components have reached the end of their useful life, creating risks to reliability and efficiency. The
BDD operates a public water supply system that delivers water to The City of Santa Fe, The County of Santa Fe and Las Campanas. This system is controlled and operated by complex SCADA systems.
1.3. SCOPE OF PROCUREMENT
The resulting contract will result in a Single Award - This procurement will result in a contractual agreement between two parties; the procurement may ONLY be used by those two parties exclusively.
1.4. PROCUREMENT MANAGER
Buckman Direct Diversion has assigned a Procurement Manager who is responsible for the conduct of this procurement whose name, address, telephone number, and email address are listed below:
Name Gutema Ayana, Contract Admin
Telephone Number (925) 398-9507
Email gxayana@santafenm.gov
1. Any inquiries or requests regarding this procurement should be submitted via the OpenGov
Procurement Portal at https://procurement.opengov.com/portal/santafenm/projects/204692.
1.5. DEFINITION OF TERMINOLOGY
This section contains definitions of terms used throughout this procurement document, including appropriate abbreviations:
A. "Addendum" means a written or electronic document issued by the City to modify, clarify, or supplement the information in the original RFP prior to the proposal due date. This may also be called
Amendment or RFP Amendment.
B. “Amended Proposal” means a revised and complete version of a proposal submitted by an Offeror prior to the proposal due date, clearly labeled as superseding the original submission.
C. “Authorized Purchaser” means an individual authorized by a Participating Entity to place orders against this contract.
D. “Award” means the point at which the contract document has been fully executed. See also “Contract” and “Final Award.
E. "BDD" means Buckman Direct Division
F. “Best and Final Offer” or “BAFO” means a final revised proposal submitted by an Offeror, upon request by the City, to provide updated pricing or other proposal elements
G. “Blind Evaluation” means an anonymized evaluation process in which identifying information is removed from proposals to ensure objective scoring by the Evaluation Committee.
H. “Business Hours” means the normal business hours of the Requesting department; 8:00 AM through
5:00 PM Mountain Standard or Daylight Time, whichever is in effect on the date given.
I. “Central Purchasing Division” or “CPD” means the City office responsible for overseeing and managing the procurement of tangible personal property, services, and construction, including ensuring compliance with applicable procurement laws, policies, and procedures.
J. “Chief Procurement Officer” or “CPO” means that person within the CPD who is responsible for the control of procurement of items of tangible personal property, services, or construction.
https://procurement.opengov.com/portal/santafenm/projects/204692
K. “City” means the City of Santa Fe, New Mexico which in the procurement context may act through the
Finance Director, City Manager, or Governing Body.
L. “Clarification Phase” means the structured period during which the potential best-value Offeror(s) and the City align expectations, mitigate risk, and finalize project understanding prior to contract execution.
M. “Close of Business” means the normal close of business of the Requesting Department; 5:00
PM Mountain Time.
N. “Confidential” means confidential financial information concerning Offeror’s organization and data that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act NMSA 1978, Sections
57-3-A-1 through 57-3A-7. The following items may not be labelled as confidential: Offeror’s submitted Cost response, Staff/Personnel Resumes/Bios (excluding personal information such as personal telephone numbers and/or home addresses), and other submitted data that is not confidential financial information or that qualifies under the Uniform Trade Secrets Act.
O. “Contract” means any agreement or Price Agreement for the procurement of items of tangible personal property, services, or construction.
P. “Contractor” means any business having a contract with the City of Santa Fe.
Q. “Department” means the Requesting Department sponsoring this Procurement.
R. “Desirable” the terms “may,” “can,” “should,” “preferably,” or “prefers,” identify a desirable or discretionary item or factor.
S. "Destination" refers to the final delivery location specified by the Buckman Direct Diversion Board
(BDDB) where goods, materials, or services are to be received, inspected, and accepted in accordance with the contract requirements.
T. “Determination” means the written documentation of a decision of a procurement officer including findings of fact required to support a decision. A determination becomes part of the procurement file to which it pertains.
U. “Electronic Submission” means a successful submittal of Offeror’s proposal consisting of text, images or both readable on computers or other electronic devices.
V. “Evaluation Committee” means a body appointed to perform the evaluation of Offerors’ proposals.
W. “Evaluation Committee Report” means a report prepared by the Procurement Manager and the
Evaluation Committee to support the Committee’s recommendation for contract award. It will contain scores and written evaluations of all responsive Offeror proposals.
X. “Final Award” means the point at which the contract(s) resulting from this RFP have been fully executed through the final required signature—either by the City Manager or City Mayor, depending on the contract amount—thereby making the contract(s) legally binding. See also “Contract.”
Y. “Finalist” means an Offeror who meets all the mandatory specifications of this RFP and whose score on evaluation factors is sufficiently high to merit further consideration by the Evaluation Committee.
Z. “Hourly Rate” means the proposed fully loaded maximum hourly rates that include travel, per diem, fringe benefits and any overhead costs for contractor personnel, as well as subcontractor personnel if appropriate.
AA. “IT” means Information Technology.
BB. “Key Personnel Lead” means the primary individual identified by the Offeror to lead project execution, participate in the interview, and act as the main point of contact throughout the contract term.
CC. “Living Wage” means the minimum hourly wage established by the City of Santa Fe’s Living
Wage Ordinance, which contractors must comply with, as posted at https://santafenm.gov/economic-development/business-resources/living-wage-information.
DD. “Mandatory” the terms “must,” “shall,” “will,” “is required,” or “are required,” identify a mandatory item or factor. Failure to meet a mandatory item or factor may result in the rejection of the
Offeror’s proposal.
EE. “Minor Irregularities” means anything in the proposal that does not affect the price, quality and/or quantity, or any other mandatory requirement.
FF. “Offeror” means any person, corporation, or partnership who chooses to submit a proposal.
GG. “OpenGov” means the City of Santa Fe’s official electronic procurement platform used to post solicitations, receive vendor proposals, facilitate communication with Offerors, and manage procurement activities in a transparent, streamlined, and auditable manner.
HH. “Procurement Manager” or “PM” means any person authorized by both the CPD and the
Requesting Department to facilitate the procurement process and/or administer the resulting contract(s).
The Procurement Manager is responsible for managing all aspects of the procurement, including planning and coordinating all related events; ensuring that all required information is provided to potential offerors, the Evaluation Committee, and CPD; and preparing and processing the Evaluation
Committee Report. The Procurement Manager ensures compliance with all applicable requirements and serves as the primary point of contact throughout the procurement lifecycle. The Procurement Manager is the sole point of contact for all communication related to the procurement. Potential offerors, City staff, and CPD must direct all questions or information through the PM. Staff in the Requesting
Department must rely on the PM to serve as the liaison between their department and CPD to maintain consistency, transparency, and compliance. When questions, challenges, or issues arise during the procurement process, the Procurement Manager should consult with CPD for guidance. CPD is available to support and facilitate the RFP process and to assist the Procurement Manager in ensuring a smooth, fair, and compliant procurement.
II. “Project” means a temporary process undertaken to solve a well-defined goal or objective with clearly defined start and end times, a set of clearly defined tasks, and a budget. The project terminates once the project scope is achieved, and project acceptance is given by the project executive sponsor.
https://santafenm.gov/economic-development/business-resources/living-wage-information https://santafenm.gov/economic-development/business-resources/living-wage-information
JJ. “Protest” means a formal, written objection to a solicitation or contract award, submitted in accordance with NMSA 1978, Section 13-1-172 and Procurement Manual, to the Protest Manager identified in this
RFP.
KK. “Request for Proposals” or “RFP” means all documents, including those attached or incorporated by reference, used for soliciting proposals.
LL. “Requesting Department” means the City Department responsible for overseeing the work or delivery of tangible personal property by a contractor.
MM. “Responsible Offeror” means an Offeror who submits a responsive proposal and who, when required, provides information and documentation demonstrating that their financial resources, production or service facilities, personnel, reputation, and experience are sufficient to ensure satisfactory delivery of the services or tangible personal property described in the proposal.
NN. “Responsive Offer” means an Offeror whose proposal conforms in all material respects to the requirements set forth in the RFP. Material aspects of the RFP include, but are not limited to, price, quality, quantity, delivery requirements, and compliance with all mandatory specifications, terms, and conditions necessary for fair and complete evaluation.
OO. “Sealed” means, in terms of electronic submission, an Offeror’s proposal and all accompanying documents have been completely and successfully uploaded into the City’s designated procurement platform—such as Bid Central or OpenGov—prior to the submission deadline stated in this RFP.
PP. “Staff” refers to any individual employed by an Offeror, whether on a full-time, part-time, or independent contractor basis.
QQ. "Subcontractor” means any person or business entity, other than an employee of the Contractor, that performs part of the work or provides goods or services under the contract resulting from this RFP.
RR. “Written” means typewritten on standard 8 ½ x 11-inch paper. Larger paper is permissible for charts, spreadsheets, etc.
1.6. PROCUREMENT LIBRARY
A procurement library has been established. Offerors are encouraged to review the material contained in the
Procurement Library by viewing the attachment section of the solicitation. The library contains information listed below:
Electronic version of RFP, Questions & Answers, RFP Amendments, etc.
https://procurement.opengov.com/portal/santafenm/projects/204692
2. CONDITIONS GOVERNING THE PROCUREMENT
This section of the RFP contains the schedule of events, the descriptions of each event, and the conditions governing this procurement.
2.1. SEQUENCE OF EVENTS
The CPD and the Procurement Manager will make every effort to adhere to the following schedule:
Issue RFP: November 19, 2025
Pre-Proposal Meeting (Non-Mandatory): December 2, 2025, 1:15pm https://teams.microsoft.com/meet/24623308
330753?p=DaBejyXalMN6Wfk6zV
Deadline for Written Questions: December 4, 2025, 5:00pm
Response to Written Questions: December 8, 2025, 5:00pm
Proposals Due Date: December 18, 2025, 3:00pm
Blind Evaluation*: December 19, 2025, 8:30am
Interviews*: December 23, 2025
Identification of Potential Best-Valued
Offeror(s)*:
December 24, 2025
First Clarification Meeting*: December 30, 2025, 8:00am
Best and Final Offers*: January 8, 2026
Final Clarification Meeting*: January 9, 2026, 8:00am
Board Approval*: January 16, 2026
Contract Award*: January 28, 2026
*Dates indicated after "Proposals Due Date" are estimates only and may be subject to change without necessitating an amendment to the RFP.
2.2. EXPLANATION OF EVENTS
The following paragraphs describe the activities listed in the Timeline.
The City reserves the right to:
A. Change or extend the Proposals Due Date.
B. Revise the RFP document prior to the due date.
The City will process an addenda if it is determined that modifications, clarifications, or additions to the RFP are necessary. The addenda will be announced via email to registered Potential Offerors that have selected the corresponding commodity code used for this event.
A. Issue RFP
This RFP is being issued on behalf of BDD and the City on the date indicated in the Timeline.
https://teams.microsoft.com/meet/24623308330753?p=DaBejyXalMN6Wfk6zV https://teams.microsoft.com/meet/24623308330753?p=DaBejyXalMN6Wfk6zV
B. Pre-Proposal Meeting
A Pre-Proposal Meeting will be held as indicated in the Timeline, beginning at 1:15 pm MST/MDT via https://teams.microsoft.com/meet/24623308330753?p=DaBejyXalMN6Wfk6zV Potential Offeror(s) are encouraged to submit written questions in advance of the conference to the CPD and the
Procurement Manager via the OpenGov Procurement Portal. The identity of the organization submitting the questions will not be revealed. Additional written questions may be submitted at the
Meeting. All questions answered during the Pre-Proposal Meeting will be considered unofficial until they are posed in writing. All written questions will be addressed in writing on the date listed in the
Timeline. A public log will be kept of the names of potential Offeror(s) that attended the Pre-Proposal
Meeting.
Attendance at this meeting is highly recommended, but not a prerequisite for submission of a proposal.
C. Deadline for Written Questions
Potential Offerors may submit written questions to the Central Purchasing Division and the Procurement
Manager as to the intent or clarity of this RFP as indicated in the Timeline". All written questions must be submitted via the OpenGov Procurement Portal. Questions shall be clearly labeled and shall cite the
Section(s) in the RFP or other document which form the basis of the question.
D. Responses to Written Questions
Responses to the written questions will be provided on OpenGov, on or before the date indicated in the
Timeline.
E. Proposals Due Date
Only electronic proposal submission is allowed.
ALL PROPOSALS MUST BE SUBMITTED FOR REVIEW AND EVALUATION BY THE CPD
AND EVALUATION COMMITTEE VIA UPLOAD.
Pursuant to NMSA 1978, Section 13-1-116, the contents of proposals shall not be disclosed to competing Offerors during the negotiation process. The negotiation process is deemed to be in effect until the contract is awarded pursuant to this RFP. Awarded in this context means approved by the City
Manager or Mayor.
F. Blind Evaluation
The City will establish an Evaluation Committee (EC) to evaluate proposals in accordance with the timeline outlined in the Timeline or as soon as feasible. The EC will evaluate proposals based on the criteria specified in the Evaluation section of this RFP, using the metrics presented in each proposal and aligning them with the City’s needs, as detailed in the City Sample columns of the G Attachments.
To ensure impartiality, the CPD will anonymize proposals by assigning each proposal a letter before forwarding them to the Procurement Manager and EC. Each Evaluation Factor will be scored on a scale of 1, 5, or 10. The scores will then be averaged and converted according to the assigned values for each
Evaluation Factor.
G. Interviews
Offerors may be interviewed to evaluate expertise. A notification will be sent to Offerors with meeting details once the Evaluation Committee has conducted their initial review. The Evaluation Committee will interview the Key Personnel Lead. A second individual may be on standby to clarify Pricing
Proposal if requested.
H. Identification of Potential Best-Valued Offeror(s)
All proposals will be reviewed for compliance with the requirements and specifications stated within this RFP. Proposals deemed non-responsive will be eliminated from further consideration. The CPD and/or the Procurement Manager in conjunction with the Evaluation Committee may contact the Offeror for clarification of the response. Responsive proposals will be evaluated on the factors in this RFP, which have been assigned a point value. The responsible Offeror(s) with the highest scores will be selected as finalist Offerors, based upon the proposals submitted. In accordance with NMSA 1978, 13-1-
117, the responsible Offerors whose proposals are most advantageous to the City taking into consideration the Evaluation Factors in this RFP will be recommended for award. Please note, however, that a serious deficiency in the response to any one factor may be grounds for rejection regardless of overall score.
I. First Clarification Meeting
The City may ask the finalist Offerors to attend a First Clarification Meeting to present its proposal and to identify additional issues or concerns that the City may have. It is also an opportunity to meet all participants who may be a stakeholder in the project.
J. Best and Final Offers
This RFP process will allow for Best and Final Offers (BAFO) from finalist Offerors. Specifically, Offerors should provide their strongest possible pricing in initial proposals, as we expect competitive submissions upfront. However, we reserve the right to re-open negotiation by requesting BAFO under the schedule outlined in the Timeline or on an accelerated timeline from finalists. The purpose would be to elicit revised pricing or other updated proposal elements that facilitate selection of the optimal offer.
Finalist Offerors may also amend or clarify their proposal during the Clarification phase.
K. Final Clarification Meeting
The Final Clarification Meeting may be held at the end of the Clarification Phase and is used to present a summary of what was developed and agreed upon during the Clarification Phase. The final
Clarification meeting is not a question-and-answer session. The Offeror and City stakeholders must not wait for the meeting to ask questions. All coordination and planning with the City should be completed prior to the Clarification Phase Summary Presentation meeting on the RFP Procurement schedule.
L. Finalize Contracts
After approval of the Evaluation Committee Report, any contractual agreement(s) resulting from this
RFP will be finalized with the most advantageous Offeror(s), taking into consideration the evaluation factors set forth in this RFP, as per the Timeline or as soon as possible thereafter. The most advantageous proposal may or may not have received the most points. In the event mutually agreeable terms cannot be reached with the apparent most advantageous Offeror in the timeframe specified, the
City of Santa Fe reserves the right to finalize a contractual agreement with the next most advantageous
Offeror(s) without undertaking a new procurement process.
M. Board Approval
Depending on the amount of the total compensation, including any term extensions of the contract, the
Buckman Direct Diversion Board (BDDB) will review, approve, and execute the contract. All contracts related to this solicitation shall be submitted to the BDDB for consideration at a scheduled Board meeting. Upon approval, the authorized representative of the BDDB shall sign the contract on behalf of the Board.
N. Contract Awards
Upon receipt of the signed contract, the Department will award pursuant to the Timeline, or as soon as possible thereafter. The award is subject to appropriate Department and City Manager/Governing Body approval. Contractors must not commence work until the Department issues them a Purchase Order
(PO) and instructions to start.
O. Protest Deadline
Any protest by an Offeror pertaining to the solicitation or award must be submitted within 15 days from the notice of solicitation or award and in conformance with NMSA 1978, Section 13-1-172 and applicable procurement regulations. As a Protest Manager has been named in this RFP, pursuant to
NMSA 1978, Section 13-1-172 and Procurement Manual Section Y, ONLY protests delivered directly to the Protest Manager in writing and in a timely fashion will be considered to have been submitted properly and in accordance with statute, rule, and this RFP. The 15-calendar day protest period shall begin on the day following the notice of award of contract(s) and will end at 5:00 pm MST/MDT on the
15th day. Protests must be written and must include the name and address of the protestor and the RFP number. The protest must include a detailed statement of the grounds for the protest, along with any relevant supporting documentation. It should also clearly state the specific ruling being requested from the party listed below. The protest must be delivered to:
Travis Dutton-Leyda, CPO
City of Santa Fe purchasing@santafenm.gov
PROTESTS RECEIVED AFTER THE DEADLINE WILL NOT BE ACCEPTED.
2.3. General Requirements
A. Acceptance of Conditions Governing the Procurement
By submitting a proposal in response to this RFP, Offerors acknowledge and agree to all Conditions
Governing the Procurement, as outlined herein.
B. Incurring Cost
All costs incurred by an Offeror in the preparation, submission, transmittal, or presentation of a proposal—including any related materials—are the sole responsibility of the Offeror. Additionally, any costs associated with the setup, demonstration, or evaluation of proposed equipment, products, or systems shall be borne entirely by the Offeror.
mailto:purchasing@santafenm.gov
C. Prime Contractor Responsibility
By receiving a contract resulting from this RFP, each awarded Contractor is solely responsible for fulfilling all contractual requirements with the City. The City will make payments only to the
Contractor(s) named in the executed agreement(s) and will not be responsible for any payments to subcontractors, third parties, or for any ancillary costs such as taxes, permits, or fees.
D. Subcontractors/Consent
The use of subcontractors is allowed. The prime contractor shall be wholly responsible for the entire performance of the contract whether subcontractors are used. Additionally, the prime contractor must receive approval, in writing, from the City before any subcontractor is used during the term of the resultant contract.
E. Amended Proposals
Offerors may submit amended proposals at any time prior to the Proposal Due Date. Each amended submission must serve as a complete replacement of the original proposal. Amendments may be submitted in response to changes issued by the City or to reflect revisions made independently by the
Offeror. To ensure clarity during evaluation, all amended proposals must be clearly labeled as such and must explicitly state that they supersede any previously submitted versions. The City will evaluate only the most recent, complete version submitted prior to the deadline. City staff will not merge, collate, or otherwise combine materials from multiple submissions.
F. Proposal Withdrawal
Offerors may withdraw their proposals at any time prior to the Proposal Due Date. A written request to withdraw must be submitted via email, addressed to the CPD and the Procurement Manager, and signed by a duly authorized representative of the Offeror. Withdrawal requests received after the Proposal Due
Date will be subject to applicable procurement regulations and are not guaranteed to be accepted.
G. Proposal Offer Firm
Responses to this RFP, including proposal prices for services, will be considered firm for one-hundred eighty (180) days after the due date for receipt of proposals or one-hundred eighty (180) days after the due date for the receipt of a best and final offer, if the Offeror is invited or required to submit one.
H. Disclosure of Proposal Contents
The contents of all submitted proposals will be kept confidential until the final award has been completed by the City. At that time, all proposals and documents pertaining to the proposals will be available for public inspection, except for proprietary or confidential material as follows:
1. Proprietary and Confidential information is restricted to:
a. confidential financial information concerning the Offeror’s organization; and
b. information that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act, NMSA 1978, Sections 57-3A-1 through 57-3A-7.
2. An additional but separate redacted version of Offeror’s proposal shall be submitted containing the blacked-out proprietary or confidential information, to facilitate eventual public inspection of the non-confidential version of Offeror’s proposal.
IMPORTANT: The price of products offered, or the cost of services proposed SHALL NOT be designated as proprietary or confidential information.
If a request is received for disclosure of proprietary or confidential materials, the City Attorney and the CPO shall examine the request and make a written determination that specifies which portions of the proposal should be disclosed. Unless the Offeror takes legal action to prevent the disclosure, the proposal will be so disclosed. The proposal shall be open to public inspection subject to any continuing prohibition on the disclosure of proprietary or confidential information.
I. No Obligation
This RFP in no manner obligates the City to the use of any Offeror’s services until a valid written contract is awarded and approved by appropriate authorities.
J. Termination
This RFP may be canceled at any time and all proposals may be rejected in whole or in part when the
City determines such action to be in the best interest of the City of Santa Fe.
K. Sufficient Appropriation
Any contract awarded because of this RFP process may be terminated if sufficient appropriations or authorizations do not exist. Such terminations will be affected by sending written notice to the contractor. The City’s decision as to whether sufficient appropriations and authorizations are available will be accepted by the contractor as final.
L. Legal Review
The City requires that all Offerors agree to be bound by the General Requirements contained in this
RFP. Any Offeror’s concerns must be promptly submitted in writing to the attention of the CPD and the
Procurement Manager.
M. Governing Law
This RFP and any agreement with an Offeror which may result from this procurement shall be governed by the laws of the State of New Mexico.
N. Basis for Proposal
Only information supplied in writing by the CPD and the Procurement Manager or contained in this RFP shall be used as the basis for the preparation of Offeror proposals.
O. Contract Terms and Conditions
The contract between the City and a contractor will follow the format specified by the City and contain the terms and conditions set forth in the Draft Contract. However, the City reserves the right to negotiate provisions in addition to those contained in this RFP Draft Contract with any Offeror. The contents of this RFP, as revised and/or supplemented, and the successful Offeror’s proposal will be incorporated into and become part of any resultant contract.
The City discourages exceptions from the contract terms and conditions as set forth in the Draft
Contract. Such exceptions may cause a proposal to be rejected as nonresponsive when, in the sole judgment of the City (and its evaluation team), the proposal appears to be conditioned on the exception, or correction of what is deemed to be a deficiency, or an unacceptable exception is proposed which would require a substantial proposal rewrite to correct.
Should an Offeror object to any of the terms and conditions as set forth in the RFP Draft Contract strongly enough to propose alternate terms and conditions despite the above, the Offeror must propose specific alternative language. The City may or may not accept the alternative language. General references to the Offeror’s terms and conditions or attempts at complete substitutions of the Draft
Contract are not acceptable to the City and will result in disqualification of the Offeror’s proposal.
Offerors must provide a brief discussion of the purpose and impact, if any, of each proposed change followed by the specific proposed alternate wording.
If an Offeror fails to propose any alternate terms and conditions during the procurement process (the
RFP process prior to selection as successful Offeror), no proposed alternate terms and conditions will be considered later during the negotiation process. Failure to propose alternate terms and conditions during the procurement process (the RFP process prior to selection as successful Offeror) is an explicit agreement by the Offeror that the contractual terms and conditions contained herein are accepted by the
Offeror.
P. Offeror’s Terms and Conditions
Offerors must include with their proposal and/or during clarification phase a complete list of any additional/modified terms and conditions they wish to have considered for inclusion in the final contract.
Offerors must clearly identify the specific section(s) of the City’s draft contract they propose to modify and provide the exact language they wish to substitute or add. Failure to submit proposed terms at the time of proposal submission may result in the City deeming those terms waived during contract negotiations.
Q. Contract Deviations
Any additional terms and conditions, which may be the subject of negotiation (such terms and conditions having been proposed during the procurement process, that is, the RFP process prior to selection as successful Offeror), will be discussed only between the City and the Offeror selected and shall not be deemed an opportunity to amend the Offeror’s proposal.
R. Offeror Qualifications
The Evaluation Committee may make such investigations as necessary to determine the ability of the potential Offeror to adhere to the requirements specified within this RFP. The Evaluation Committee will reject the proposal of any potential Offeror who is not a Responsible Offeror or fails to submit a
Responsive Offer as defined in NMSA 1978, Sections 13-1-83 and 13-1-85.
S. Right to Waive Minor Irregularities
The Evaluation Committee, upon approval from the CPO, reserves the right to waive minor irregularities. The Evaluation Committee also reserves the right to waive mandatory requirements, if all of the otherwise responsive proposals failed to meet the same mandatory requirements and the failure to do so does not otherwise materially affect the procurement. This right is at the sole discretion of the
Evaluation Committee and CPO.
T. Change in Contractor Representatives
The City reserves the right to require a change in the contractor’s assigned representative if, in the City’s judgment, the individual is not adequately meeting the City’s needs. If multiple representatives are assigned, the City may require changes to any or all of them as deemed necessary.
U. Notice of Penalties
NMSA 1978, Sections 13-1-28 through 13-1-199, imposes civil, and misdemeanor and felony criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for bribes, gratuities, and kickbacks.
V. City’s Rights
The City, in agreement with the Evaluation Committee reserves the right to accept all or a portion of a potential Offeror's proposal.
W. Right to Publish
Throughout the duration of this procurement process and contract term, Offerors and contractors must secure from the City written approval prior to the release of any information that pertains to the potential work or activities covered by this procurement and/or City contracts deriving from this procurement.
Failure to adhere to this requirement may result in disqualification of the Offeror’s proposal or removal from the contract.
X. Ownership of Proposals
All documents submitted in response to the RFP shall become property of the City. If the RFP is cancelled, the electronic record shall be closed, and all proposals shall remain confidential.
Y. Confidentiality
Any confidential information provided to, or developed by, the contractor in the performance of the contract resulting from this RFP shall be kept confidential and shall not be made available to any individual or organization by the contractor without the prior written approval of the City.
The Contractor(s) agrees to protect the confidentiality of all confidential information and not to publish or disclose such information to any third party without the City’s written permission.
Z. Electronic Mail Address Required
A large part of the communication regarding this procurement will be conducted by electronic mail
(email). Offeror must be registered and have a valid email address to receive correspondences.
AA. Use of Electronic Versions of This RFP
This RFP is being made available by electronic means. In the event of conflict between a version of the
RFP in the Offeror’s possession and the version maintained by the CPD, the Offeror acknowledges that the version maintained by the CPD shall govern. Please refer to:
https://procurement.opengov.com/portal/santafenm/projects/204692
BB. Campaign Contribution Disclosure Form
Offeror must complete, sign, and return the Campaign Contribution Disclosure Form, as a part of their proposal. This requirement applies regardless of whether a covered contribution was made or not made for the positions of Governor and Lieutenant Governor, City Officials or other identified official. Failure to complete and return the signed, unaltered form will result in Offeror’s disqualification.
CC. Proposal Cover Page, Declaration, And Checklist
Offeror’s proposal must be accompanied by an unaltered Attachment A, which should be completed and signed by the individual authorized to contractually obligate the company, identified in #2 below. (N/A, None, Does not apply, etc. are acceptable responses).
DD. Disclosure Regarding Responsibility
1. Any prospective Contractor and any of its Principals who enter a contract greater than sixty thousand dollars ($60,000.00) with any state agency or local public body for professional services, tangible personal property, services or construction agrees to disclose whether the Contractor, or any principal of the Contractor’s company:
a. is presently debarred, suspended, proposed for debarment, or declared ineligible for award of contract by any federal entity, state agency or local public body;
b. has within a three-year period preceding this offer, been convicted in a criminal matter or had a civil judgment rendered against them for:
i. the commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state or local) contract or subcontract;
ii. violation of Federal or state antitrust statutes related to the submission of offers; or
iii. the commission in any federal or state jurisdiction of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violation of
Federal criminal tax law, or receiving stolen property;
c. is presently indicted for, or otherwise criminally or civilly charged by any (federal state or local) government entity with the commission of any of the offenses enumerated in paragraph A of this disclosure;
d. has, preceding this offer, been notified of any delinquent Federal or state taxes in an amount that exceeds $3,000.00 of which the liability remains unsatisfied. Taxes are considered delinquent if the following criteria apply.
i. The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge of the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
ii. The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
iii. Have within a three-year period preceding this offer, had one or more contracts terminated for default by any federal or state agency or local public body.
2. Principal, for the purpose of this disclosure, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity or related entities.
3. Following award, the Contractor shall promptly provide written notice to the individuals listed in the contract’s Notice section if, at any time during the term of the contract, the Contractor becomes aware that any part of its prior disclosure was inaccurate or has become inaccurate due to changed circumstances.
4. Disclosure of any relevant circumstances under this requirement will not automatically result in termination of the contract. However, such disclosures will be considered when evaluating the
Contractor’s responsibility and capacity to perform under the contract. Failure to provide a required disclosure, or to submit additional information upon request, may result in a determination that the
Offeror is nonresponsive
5. Nothing contained in the foregoing shall be construed to require establishment of a system of records to render, in good faith, the disclosure required by this document. The knowledge and information of a Contractor is not required to exceed that which is the normally possessed by a prudent person in the ordinary course of business dealings.
6. The disclosure requirement provided is a material representation of fact upon which reliance was placed when making an award and is a continuing material representation of the facts during the term of this Agreement. If during the performance of the contract, the Contractor is indicted for or otherwise criminally or civilly charged by any government entity (federal, state, or local) with commission of any offenses named in this document the Contractor must provide immediate written notice to the CPO or other party to this Agreement. If it is later determined that the Contractor knowingly rendered an erroneous disclosure, in addition to other remedies available to the
Government, the CPO may terminate the involved contract for cause. Still further the CPO may suspend or debar the Contractor from eligibility for future solicitations until such time as the matter is resolved to the satisfaction of the CPO
EE. Local Preferences
The City recognizes the value of revenue derived from local businesses and shall procure goods and/or services locally, when possible, pursuant to Ordinance and the City of Santa Fe Procurement Manual.
The city’s preferences will be applied except for purchases using state funds, federal funds, and grant funds. Applicable City, state, and federal law and regulations govern procurements using City, state, or federal funds. The state’s preference will be used on Public Works Projects.
3. RESPONSE FORMAT AND ORGANIZATION
3.1. NUMBER OF RESPONSES
Offerors shall submit only one proposal in response to this RFP.
3.2. NUMBER OF COPIES
ELECTRONIC SUBMISSION ONLY
Offerors must submit proposals in response to this RFP through the OpenGov Procurement Portal. Only one electronic copy of each part of the proposal (Main and Cost) should be submitted, as outlined below.
Offerors' proposals should be submitted as separate uploads, as outlined in this section. Each upload should be clearly labeled on the front page as “Public Proposal,” “Confidential Proposal,” or “Cost Proposal.” If an
Offeror proposes additions or modifications to the City’s draft contract, a third document titled “Contract
Edits” may be submitted. These proposed changes should align with the guidelines in the General
Requirements section and be summarized in the draft contract attachment reference.
ELECTRONIC proposal submissions must be fully uploaded via OpenGov before the submission deadline.
Files cannot be password-protected and should be submitted in PDF format, unless an Excel spreadsheet or another format is specifically requested. Offerors should allow ample time to upload large files to ensure a complete and on-time submission.
As soon as you see this notice, verify that you can log in to your OpenGov account and access the RFP. Do not wait until the last minute to check your login credentials or ensure you can interact with the system. If you encounter login issues, contact OpenGov at support@opengov.com.
Allow plenty of time to upload your proposal via OpenGov. If you experience issues, email OpenGov at support@opengov.com, at least two hours before the deadline. Issues reported within the final two hours may not be resolved in time. While the City will assist, timely resolution cannot be guaranteed if problems arise close to the deadline.
Submissions will be deemed late if not both:
1. Fully complete before the deadline.
2. Received via the submission link before the deadline.
Additionally, if submissions are not received on time due to being captured, blocked, filtered, quarantined, or otherwise prevented from reaching the City’s system by security or anti-virus software, it will still be considered late and will not be accepted.
If you are working on your submission close to the deadline and the clock strikes 3:00 pm, the system will not accept your submission and may even log you out. This is not a system error—it is the result of waiting too long to submit. Offerors are responsible for planning accordingly and ensuring timely submission.
REMEMBER TO CLICK THE SUBMIT BUTTON!
LATE PROPOSALS MAY NOT BE ACCEPTED
Any proposal that does not adhere to the requirements of the Response Format and Organization section may be deemed non-responsive and rejected on that basis.
4. SCOPE OF WORK
mailto:support@opengov.com
4.1. Programmable Logic Controller (PLC) Replacement and Modifications to Supervisory
Control And Data Acquisition (SCADA).
The Contractor shall provide all labor, equipment, materials, programming, and technical expertise necessary to complete the following work:
A. PLC Replacements o Pall Membrane Programmable Logic Controller o Ozone Programmable Logic Controller o Advanced Treatment Facility Programmable Logic Controller o Granulated Activated Carbon Programmable Logic Controller o Program all new PLCs using the latest Schneider Electric software (Unity Pro XL) o Integrate each PLC into the existing BDD SCADA system to ensure seamless communication and control.
o Perform testing and verification of functionality for each PLC after installation.
o Coordinate plant shutdowns for installation activities. Because these replacements require a full shutdown of operations, all work must be scheduled between October and March, when water consumption is at its lowest.
B. SCADA System Support o Provide on-call SCADA support services as requested by BDD staff.
o Services may include troubleshooting, reprogramming, adjustments, and enhancements to the
SCADA system to ensure continued system reliability.
o Respond to service requests in a timely manner to minimize system downtime.
C. Drawings and Programming Files o Provide updated drawings for each PLC installed.
o Provide updated pane layout drawings for each SCADA cabinet modified.
o Deliver copies of .STU files containing ladder logic and function block programming, (No Script
Programming will be accepted) created in Unity Pro XL for each PLC.
o Note: The Granulated Activated Carbon (GAC) PLC was originally programmed for ProWorx 32, and the City/BDD does not have existing program copies. The contractor shall ensure programming for the replacement GAC PLC is recreated, tested, and fully integrated into the BDD SCADA system.
o Note: The Pall PLC is programmed in Structured Text and will need to be converted to Ladder Logic and Function Block programming.
D. Documentation and Training o Provide complete documentation of programming, configurations, and modifications made to PLCs and SCADA.
o Deliver updated logic diagrams, configuration files, at least 2 licensed copies of the Programming
Software and user instructions to BDD staff.
o Provide training and knowledge transfer to BDD operators and technical staff on system changes and updates.
E. Project Management and Coordination o Coordinate all work with BDD project management staff to minimize disruption to plant operations.
o Participate in planning meetings, progress updates, and final acceptance testing.
o Ensure that all work is performed in compliance with applicable safety standards and City/County requirements.
5. EVALUATION
5.1. SCORING
The Evaluation Committee will evaluate and score proposals based on the information provided in this document and the Offerors’ demonstrated understanding of the RFP’s objectives. Attendance at the Pre-
Proposal Meeting is strongly recommended, as it will help Offerors understand the key information required in their proposals and provide a detailed explanation of the evaluation process.
Proposals will be evaluated according to the criteria listed below, which have been identified as critical to the success of the projects
No. Rating Criteria % Weighting
1 Scope/Level of Expertise Plan (SC/LE) 35
2 Value Added Plan (VA) 10
3 Cost Proposal 30
4 Interview 25
5 Local Preference 3% or 6% of the total available points*
*See local preference requirements below
5.2. DESCRIPTION OF EVALUATION
Proposals shall be submitted in OpenGov with all sections below addressed:
A. Vendor Questionnaire. Offerors shall address and complete all questions in the Vendor Questionnaire in OpenGov.
B. Key Offeror Project Lead. Complete the Key Personnel Lead Proposal question. The Offeror shall provide the name of the Primary Project Lead (the personnel must be the person who will be interviewed if shortlisted) that the offeror proposes to execute the project pursuant to a resultant contract.
C. Project Cost Proposal Form. The Offeror will prepare and submit a cost proposal and breakout. This must be uploaded separately as requested in the Vendor Questionnaire. The rest of the uploads shall not include any financial information in regard to the overall project. Any financial information associated with a Value Add can be included in that section and will be seen by the Evaluation Committee.
D. Project Capability (PC) Submittal. The Project Capability Submittal has two components:
Scope/Level of Expertise Plan (SC/LE), and Value-Added Plan (VA). (See Vendor Questionnaire).
1. Purpose of PC Submittal
a. Assist City in prioritizing Offerors’ submittals based on their scope, expertise, and ability to understand and deliver the intended project.
b. Provide high performing offerors the opportunity to differentiate themselves from their competitors due to their experience and expertise by using verifiable performance metrics and previous relative project performance results.
2. PC Submittal Format Requirements
a. PC submittal must NOT contain any names that can be used to identify who the offerors are
(such as firm names, personnel names, Project names, or product names).
b. A PC proposal template is included in this RFP. This document must be used by all offerors.
Offerors are NOT allowed to re-create, re-format, or modify the template in any manner.
Offerors must type their responses on the Word template provided.
c. Failure to comply with any of the PC format requirements may result in disqualification.
d. The PC submittal shall not contain any marketing information. The submittal should be used to prove to the City that the offeror has expertise for the specific project being proposed on.
e. References used in the PC submittal must be listed in the Reference List. The Reference List is not seen by the Evaluation Committee until after PC submittal evaluations are performed.
3. Overview of the Scope/Level of Expertise Plan - The Scope/Level of Expertise Plan is to allow offerors to differentiate themselves based on their technical capability and understanding of the