Production Surge Plan DID.pdf
PDF 173 KB Posted
- Solicitation number
- FA811825R0035
About this file
This is a Data Item Description (DID) for a Production Surge Plan, identified by number DI-MGMT-80969. The document outlines detailed requirements for contractors to demonstrate their capability to rapidly accelerate and sustain production using existing facilities and equipment during a peace-time acquisition environment, potentially in preparation for emergency or war-related scenarios.
The DID specifies comprehensive reporting requirements including: maximum sustainable production rates, critical components with potential surge impacts, labor and skill requirements, lists of subcontracted and non-subcontracted items/components, potential production constraints, and detailed documentation of production equipment and materials. Key sections require contractors to provide granular information such as production buildup timelines, critical item identification, potential surge impacts on government contracts, additional skilled labor needs, strategic material requirements, and potential production equipment modifications that could increase production capacity by up to 10 percent.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Rev 9.pdf | ||
| CAV AF.pdf | ||
| FA811825R0035.pdf | ||
| CDRL.pdf | ||
| Transportation Data.pdf | ||
| GP DID.pdf | ||
| CDM DID.pdf | ||
| Packaging Requirements.pdf | ||
| CAV DID.pdf | ||
| Shipping and Packaging Discrepancy DID.pdf | ||
| GFP.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .