PRIME-SUB_FORM_for__New_Parks_Trade_Maintance_building_Contractors_rev._01.15.2025_(lock_before_publishing)_(4).xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 25-B-136LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime-Sub Contractor Form for Volusia County, Florida, related to site development work for the Parks Recreation & Culture Proposed Workshop & Storage Facility located at 1360 Indian Lake Road in Daytona Beach. The project requires a State of Florida Certified General Contractor to complete civil site work including site preparation, drainage installation, potable water distribution system construction, roadway system development, and landscaping across approximately 1.3 acres. The contractor must provide permitting, labor, materials, and construction services with a total contract duration of 180 days, consisting of 150 days for substantial completion and 30 days for final completion. A pre-bid meeting is scheduled for July 24, 2025, at 9:30 am, and electronic bid submissions are due by August 14, 2025, at 3:01 pm. The form itself serves as the standardized documentation for identifying and approving prime contractors and their designated subcontractors for this project.
The estimated construction cost is $429,695.00 with an owner's allowance of $25,000. The contract will be awarded to the lowest responsive and responsible bidder based on evaluation criteria including bidder experience, financial stability, subcontractor qualifications, and ability to perform the work. Volusia County offers local business preference provisions for contractors maintaining a permanent location in specified counties for at least six months. Contractors must comply with E-Verify requirements, provide performance and payment bonds, maintain comprehensive insurance coverage with minimum A.M. Best rating of A- and Financial category size of VIII or greater, and list all subcontractors for approval with verification of appropriate licensing. Liquidated damages of $500 per day will be assessed for delays beyond the completion date. The county retains the option for potential tax exemptions and direct material purchases, which may provide cost-saving opportunities for the project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Site prep | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Electrical | $ - 0 | 0.00% | |
| Underground Utltiys | $ - 0 | 0.00% | |
| Painting | $ - 0 | 0.00% | |
| Fence | $ - 0 | 0.00% | |
| Paving | $ - 0 | 0.00% | |
| Landscaping | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .