- Solicitation number
- 26-SQ-108SR
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for Contract No. C-2014 (ITB No. 25-B-##XX) issued by a Florida county for design services related to the Dirksen Drive capacity improvement project. The project aims to alleviate congestion on Dirksen Drive (CR 4162) between US 17/92 and Sunrise Boulevard through widening to a three-lane undivided typical section configuration. The design effort is structured in two phases: a Study Phase followed by a Design Phase, with coordination required between the prime contractor, the City of DeBary, and the Florida Department of Transportation. The County's Right-of-Way Office will handle all property acquisition and negotiations with existing private property owners.
Bidders are required to complete and submit this form identifying all proposed subcontractors by discipline (such as electrical, HVAC, plumbing, landscaping, or other relevant trades) along with the dollar value and percentage of work each entity will perform. The total bid amount must equal 100 percent when accounting for both the prime contractor's self-performed work and all subcontractor allocations. The form explicitly warns that failure to complete and return this document may result in a non-responsive bid designation. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any subcontractor changes during project execution require prior approval from the County Project Manager. The County reserves the right to request clarification on subcontractors but will not permit changes to the total submitted base bid pricing. The form is also used to determine local bid preference scoring in accordance with the solicitation requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |