PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Attached to
- Countywide New and Replacement Glass Services
- Solicitation number
- 25-B-122JJ
- Issued by
- Volusia County, Florida
About this file
The document is a Prime/Subcontractor Form for a Countywide Glass Services contract (Contract No. C-2014) in Florida, designed to capture subcontractor details for a competitive bid. The solicitation seeks a contractor to supply, deliver, and install various glass products including window glass, door glass, display cabinet glass, and general-use glass, with additional services encompassing water intrusion inspections, installation/repair of storefront doors and windows, automatic door operators, and window tinting. The form requires bidders to comprehensively list all proposed subcontractors, their disciplines, dollar values, and percentage of work, with the prime contractor responsible for ensuring all subcontractors hold appropriate licenses.
The form includes provisions for local bid preference determination and mandates that any subcontractor changes during project completion must receive prior approval from the County Project Manager. The document emphasizes that the total bid price must be accurately reflected, with bidders required to complete green-shaded areas indicating dollar values for prime and subcontractors. The County reserves the right to seek subcontractor clarifications while prohibiting changes to the total submitted base bid pricing. The form serves as both a subcontractor disclosure mechanism and a tool for evaluating bid responsiveness, with clear instructions that failure to complete the form may result in a non-responsive bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Countywide_New_and_Replacement_Glass_Services.pdf | ||
| 25-B-122JJ_Insurance_Requirements.pdf | ||
| Scope_of_Work_for_Glass_Services.docx | DOCX document | |
| Price_Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .