Pricing Worksheet.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Demolition B9329 - SOW Addendum 01 Federal contract opportunity
- Solicitation number
- FA466125Q0002
About this file
This document is a Pricing Worksheet for a federal contract opportunity. It outlines a detailed price breakdown by division for the demolition of Building 9329 at Dyess AFB. The total construction cost is $2.00, with the majority of the costs allocated to Division 1 (General Conditions) and Division 3 (Concrete). No costs are assigned to the other divisions.
The related federal contract opportunity is for the demolition of Building 9329 at Dyess AFB, with Solicitation Number FA466125Q0002. This is a 100% small business set-aside reserved for 8(a) contractors only. Proposals are due by November 25th, 2024 at 10:00 AM (CST), and an optional site visit is scheduled for November 13th at 10:00 AM (CST). The contract is to be awarded by the Department of the Air Force Global Strike Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum One (26Nov24).pdf | ||
| Demolition B9329 - SOW Addendum 01.pdf | ||
| SOW Amended (26Nov24).pdf | ||
| Questions and Answers.pdf | ||
| Wage Determinations.pdf | ||
| SOW.pdf | ||
| Solicitation - FA466125Q0002.pdf | ||
| Progress Schedule Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT D | ||||||||
| PRICE BREAKDOWN BY DIVISION | Contractor: | |||||||
| Date: | ||||||||
| Dyess AFB, TX | Note: Due no later than 2 hours after official bid time. | |||||||
| FNWZ 23-0011 | Color Legend: | Pricing Areas | Formula Areas | |||||
| Division Line Items Include the Items Below: | ||||||||
| 0001-Base Pricing, Item 1 – FNWZ 23-0011 – Demo Building 9329 | ||||||||
| CONTRACTOR PRICE | Division 1: typically bonds, general liability, builders risk, O&P | |||||||
| (529 Funds) | LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | Notes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc. | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 50.00% | Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage, |
bulletin board, plan sets, temporary fencing, cleanup, etc.
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc. |
| Division 3 - Concrete | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 50.00% | Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor |
| Division 4 - Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 4: masonry, grout, labor |
| Division 5 - Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control |
| Division 6 - Woods & Plastic | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 6: rough & finish carpentry, casework |
| Division 7 - Thermal/Moisture | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers |
| Division 8 - Doors & Windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing |
| Division 9 - Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings |
| Division 10 - Miscellaneous Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage |
| Division 12 - Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 11: loading dock equipment, residential equipment |
| Division 15 - Plumbing & HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 12: manufactured casework |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control, |
| 100.00% | Division 14: elevator and associated equipment | ||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | Division 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing | ||
| 0001-Base Pricing, Item 1 – FNWZ 23-0011 – Demo Building 9329 Totals: | 2.00 | 0.00 | 0.00 | 0.00 | $ 2.00 | Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications |
Total Construction Cost: $ 2.00