Information & Instruction
| Instructions: |
| For evaluation purposes, the number of hours/building size in the estimate pricing sheets listed below shall be used to develop a total price for base year, plus the four option years. |
| Definition for the pricing sheets: |
| Standard Office Building – Stand-a-lone square or rectangular building with multiple, repetitious, stacking shells & cores, built on a five-foot grid, approximately 1960 or newer construction, contains 15% or less plaster and/or gyp-board ceilings, with less than 20% Courts occupancy, resides outside of Washington D.C. Does NOT contain Judges Chambers, Courtrooms, Holding Cells, SCIF-Sensitive Compartmented Information Facility. |
| Complex Building – Buildings older than 1960, with special architectural elements, with U.S Courts occupancy, or U.S. Border Stations, or Parking Garage, contains plaster and/or gyp-board ceilings. |
| Warehouse – Structure with large open areas with minimal finish out, easily accessible through loading docks and large doors, with less than 5% office space. |
| Simple Site – Square or rectangular site with less than 20 surface parking spaces and with minimal details to capture around the building (Does not include Parks on Site). The COR can provide 90% of the supporting documentation to create the site. |
| Moderate Site – Contains one or two buildings, has a greater amount of detail to capture around the building including park areas, and less than 50 parking spaces. The COR is only able to provide 75% of the supporting documentation and additional research is needed. |
| Complex Site – Is irregular in shape, or contains three or more buidlings on site, or has more then 50 surface parking spaces. Has a greater security level then a standard or moderate site (i.e. Border Stations, Warehouse Complex, or Court House facilities). |
| Items for submitting price proposal: |
| Sample Pricing Sheet |
| Estimate of Hours and Building Sizes for Evaluation Purposes |
| Pricing Sheet for Base Year |
| Pricing Sheet for each of the Option Years |
| Pricing Evaluation |
Sample
| Sample | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | Sum of 3.3.1 - 3.3.5 5,000 sf | Sum of 3.3.1 - 3.3.5 10,000 sf | Sum of 3.3.1 - 3.3.5 30,000 sf | Sum of 3.3.1 - 3.3.5 75,000 sf | Sum of 3.3.1 - 3.3.5 165,000 sf | Sum of 3.3.1 - 3.3.5 275,000 sf | Sum of 3.3.1 - 3.3.5 475,000 sf | Sum of 3.3.1 - 3.3.5 700,000 sf | Sum of 3.3.1 - 3.3.5 900,000 sf |
| Complex Building | Sum of 3.3.1 - 3.3.5 5,000 sf | Sum of 3.3.1 - 3.3.5 10,000 sf | Sum of 3.3.1 - 3.3.5 30,000 sf | Sum of 3.3.1 - 3.3.5 75,000 sf | Sum of 3.3.1 - 3.3.5 165,000 sf | Sum of 3.3.1 - 3.3.5 275,000 sf | Sum of 3.3.1 - 3.3.5 475,000 sf | Sum of 3.3.1 - 3.3.5 700,000 sf | Sum of 3.3.1 - 3.3.5 900,000 sf |
| Warehouse | Sum of 3.3.1 - 3.3.5 5,000 sf | Sum of 3.3.1 - 3.3.5 10,000 sf | Sum of 3.3.1 - 3.3.5 30,000 sf | Sum of 3.3.1 - 3.3.5 75,000 sf | Sum of 3.3.1 - 3.3.5 165,000 sf | Sum of 3.3.1 - 3.3.5 275,000 sf | Sum of 3.3.1 - 3.3.5 475,000 sf | Sum of 3.3.1 - 3.3.5 700,000 sf | Sum of 3.3.1 - 3.3.5 900,000 sf |
Total Sum of pricing for 5,000 sf Bldg. Sum of pricing for 10,000 sf Bldg. Sum of pricing for 30,000 sf Bldg. Sum of pricing for 75,000 sf Bldg. Sum of pricing for 165,000 sf Bldg. Sum of pricing for 275,000 sf Bldg. Sum of pricing for 475,000 sf Bldg. Sum of pricing for 700,000 sf Bldg. Sum of pricing for 900,000 sf Bldg. Sum of all the Buildings
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | |
| Standard Office Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Complex Building | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| Warehouse | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. | $ / Sq. Ft. |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | |
| Moderate Site | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | |
| Complex Site | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | |
| Moderate Site | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | |
| Complex Site | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | $ / AC. | |
| Total | Sum of Pricing for 0.75 ac Site | Sum of Pricing for 2.00 ac Site | Sum of Pricing for 5.00 ac Site | Sum of Pricing for 10.00 ac Site | Sum of Pricing for 17.00 ac Site | Sum of Pricing for 30.00 ac Site | Sum of Pricing for 50.00 ac Site | Sum of Pricing for 80.00 ac Site | Sum of all the Sites |
| Hourly Pricing | | |
| Program Manager | Hourly Rate | |
| Project Engineer | Hourly Rate | |
| CAD/CAFM Engineer | Hourly Rate | |
| CAD/CAFM Technician | Hourly Rate | |
| Trainer | Hourly Rate | |
| Scanning/Imaging Technician | Hourly Rate | |
| BIM Modeler | Hourly Rate | |
| GIS Engineer | Hourly Rate | |
| GIS Technician | Hourly Rate | |
| Total | Sum of Pricing for 450.00 hours in each category. | Grand Total = sum of Buildings, Sites (above) and sum of hourly pricing (to the left). |
Estimate
| Estimate | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | Sum of 3.3.1 - 3.3.5 5,000 sf | Sum of 3.3.1 - 3.3.5 10,000 sf | Sum of 3.3.1 - 3.3.5 30,000 sf | Sum of 3.3.1 - 3.3.5 75,000 sf | Sum of 3.3.1 - 3.3.5 165,000 sf | Sum of 3.3.1 - 3.3.5 275,000 sf | Sum of 3.3.1 - 3.3.5 475,000 sf | Sum of 3.3.1 - 3.3.5 700,000 sf | Sum of 3.3.1 - 3.3.5 900,000 sf |
| Complex Building | Sum of 3.3.1 - 3.3.5 5,000 sf | Sum of 3.3.1 - 3.3.5 10,000 sf | Sum of 3.3.1 - 3.3.5 30,000 sf | Sum of 3.3.1 - 3.3.5 75,000 sf | Sum of 3.3.1 - 3.3.5 165,000 sf | Sum of 3.3.1 - 3.3.5 275,000 sf | Sum of 3.3.1 - 3.3.5 475,000 sf | Sum of 3.3.1 - 3.3.5 700,000 sf | Sum of 3.3.1 - 3.3.5 900,000 sf |
| Warehouse | Sum of 3.3.1 - 3.3.5 5,000 sf | Sum of 3.3.1 - 3.3.5 10,000 sf | Sum of 3.3.1 - 3.3.5 30,000 sf | Sum of 3.3.1 - 3.3.5 75,000 sf | Sum of 3.3.1 - 3.3.5 165,000 sf | Sum of 3.3.1 - 3.3.5 275,000 sf | Sum of 3.3.1 - 3.3.5 475,000 sf | Sum of 3.3.1 - 3.3.5 700,000 sf | Sum of 3.3.1 - 3.3.5 900,000 sf |
Total Sum of pricing for 5,000 sf Bldg. Sum of pricing for 10,000 sf Bldg. Sum of pricing for 30,000 sf Bldg. Sum of pricing for 75,000 sf Bldg. Sum of pricing for 165,000 sf Bldg. Sum of pricing for 275,000 sf Bldg. Sum of pricing for 475,000 sf Bldg. Sum of pricing for 700,000 sf Bldg. Sum of pricing for 900,000 sf Bldg. Sum of all the Buildings
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | |
| Standard Office Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Complex Building | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| Warehouse | 5,000.00 sf | 10,000.00 sf | 30,000.00 sf | 75,000 sf | 165,000.00 sf | 275,000.00 sf | 475,000.00 sf | 700,000.00 sf | 900,000.00 sf |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | 0.75 ac | 2.00 ac | 5.00 ac | 10.00 ac | 17.00 ac | 30.00 ac | 50.00 ac | 80.00 ac | |
| Moderate Site | 0.75 ac | 2.00 ac | 5.00 ac | 10.00 ac | 17.00 ac | 30.00 ac | 50.00 ac | 80.00 ac | |
| Complex Site | 0.75 ac | 2.00 ac | 5.00 ac | 10.00 ac | 17.00 ac | 30.00 ac | 50.00 ac | 80.00 ac | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | 0.75 ac | 2.00 ac | 5.00 ac | 10.00 ac | 17.00 ac | 30.00 ac | 50.00 ac | 80.00 ac | |
| Moderate Site | 0.75 ac | 2.00 ac | 5.00 ac | 10.00 ac | 17.00 ac | 30.00 ac | 50.00 ac | 80.00 ac | |
| Complex Site | 0.75 ac | 2.00 ac | 5.00 ac | 10.00 ac | 17.00 ac | 30.00 ac | 50.00 ac | 80.00 ac | |
| Total | Sum of Pricing for 0.75 ac Site | Sum of Pricing for 2.00 ac Site | Sum of Pricing for 5.00 ac Site | Sum of Pricing for 10.00 ac Site | Sum of Pricing for 17.00 ac Site | Sum of Pricing for 30.00 ac Site | Sum of Pricing for 50.00 ac Site | Sum of Pricing for 80.00 ac Site | Sum of all the Sites |
| Hourly Pricing | | |
| Program Manager | 450.00 Hours | |
| Project Engineer | 450.00 Hours | |
| CAD/CAFM Engineer | 450.00 Hours | |
| CAD/CAFM Technician | 450.00 Hours | |
| Trainer | 450.00 Hours | |
| Scanning/Imaging Technician | 450.00 Hours | |
| BIM Modeler | 450.00 Hours | |
| GIS Engineer | 450.00 Hours | |
| GIS Technician | 450.00 Hours | |
| Total | Sum of pricing for 450.00 hours in each category. | Grand Total = sum of Buildings, Sites (above) and sum of hourly pricing (to the left). |
Base Year
| Base Year | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hourly Pricing | | | |
| Program Manager | $0.00 | | |
| Project Engineer | $0.00 | | |
| CAD/CAFM Engineer | $0.00 | | |
| CAD/CAFM Technician | $0.00 | | |
| Trainer | $0.00 | | |
| Scanning/Imaging Technician | $0.00 | | |
| BIM Modeler | $0.00 | | |
| GIS Engineer | $0.00 | | |
| GIS Technician | $0.00 | | |
| Total | $0.00 | Grand Total | $0.000 |
Option Year 1
| Option Year 1 | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | | | | | | | | | | |
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hourly Pricing | | | |
| Program Manager | $0.00 | | |
| Project Engineer | $0.00 | | |
| CAD/CAFM Engineer | $0.00 | | |
| CAD/CAFM Technician | $0.00 | | |
| Trainer | $0.00 | | |
| Scanning/Imaging Technician | $0.00 | | |
| BIM Modeler | $0.00 | | |
| GIS Engineer | $0.00 | | |
| GIS Technician | $0.00 | | |
| Total | $0.00 | Grand Total | $0.000 |
Option Year 2
| Option Year 2 | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hourly Pricing | | | |
| Program Manager | $0.00 | | |
| Project Engineer | $0.00 | | |
| CAD/CAFM Engineer | $0.00 | | |
| CAD/CAFM Technician | $0.00 | | |
| Trainer | $0.00 | | |
| Scanning/Imaging Technician | $0.00 | | |
| BIM Modeler | $0.00 | | |
| GIS Engineer | $0.00 | | |
| GIS Technician | $0.00 | | |
| Total | $0.00 | Grand Total | $0.000 |
Option Year 3
| Option Year 3 | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hourly Pricing | | | |
| Program Manager | $0.00 | | |
| Project Engineer | $0.00 | | |
| CAD/CAFM Engineer | $0.00 | | |
| CAD/CAFM Technician | $0.00 | | |
| Trainer | $0.00 | | |
| Scanning/Imaging Technician | $0.00 | | |
| BIM Modeler | $0.00 | | |
| GIS Engineer | $0.00 | | |
| GIS Technician | $0.00 | | |
| Total | $0.00 | Grand Total | $0.000 |
Option Year 4
| Option Year 4 | 1-8,000 sf | 8,001-20,000 sf | 20,001-50,000 sf | 50,001-100,000 sf | 100,001-200,000 sf | 200,001-350,000 sf | 350,001-600,000 sf | 600,001-800,000 sf | Over 800,001 sf | Total |
| 3.1 - SDM Assignment Models & Drawing Management | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.1 - Base Model-Architectural (Core & Shell) | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.2 - Base Model-Interior | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.2.3 - Base Model-Structural | Gross SF | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.5.1 - Phase 1 - Field Work: Spatial Audit and Measurement | Includes Space Class UFO and STP Assignments plus the Building Rentable | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3 - Model-Mechanical, Electrical and Plumbing (MEP) | Gross SF Note: the pricing for 3.3 is inclusive of 3.3.1 - 3.3.5 below. | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| 3.3.1 - Mechanical (MEP) Equipment Rooms | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.2 - Mechanical Equipment within risers, chases or furring (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.3 - Mechanical Equipment placed in Ceilings & Walls (exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.4 - Mechanical Equipment above Ceilings (non-exposed) | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.3.5 - Mechanical Equipment on Roof | | | | | | | | | |
| Standard Office Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Complex Building | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| Warehouse | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 |
| 3.2.4 - Base Model-SDM Site Model (Acrage) | 0 - 1 ac. | 1.1 - 3 ac. | 3.1 - 7 ac | 7.1 - 12 ac | 12.1 - 20 ac | 20.1 - 40 ac | 40.1 - 60 ac | Over 60.1 ac | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| 3.3.6 - MEP Equipment on Site (Acreage) | | | | | | | | | |
| Simple Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Moderate Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Complex Site | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | $0.000 | |
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hourly Pricing | | | |
| Program Manager | $0.00 | | |
| Project Engineer | $0.00 | | |
| CAD/CAFM Engineer | $0.00 | | |
| CAD/CAFM Technician | $0.00 | | |
| Trainer | $0.00 | | |
| Scanning/Imaging Technician | $0.00 | | |
| BIM Modeler | $0.00 | | |
| GIS Engineer | $0.00 | | |
| GIS Technician | $0.00 | | |
| Total | $0.00 | Grand Total | $0.000 |
Price Evaluation
| Price Evaluation | Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | Evaluation Total |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |