Pricing Sheet Erosion Inspection.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Erosion and sediment control support to DSCR
- Solicitation number
- SP470325Q0011
- Issued by
-
Defense Logistics Agency
About this file
This is a pricing sheet template for an erosion and sediment control inspection services contract (SP4703-25-Q-0011) at Defense Logistics Agency Richmond. The template requires contractors to submit pricing for two main tasks: reports (3 per year) and inspections (69 per year) across a base year (estimated 2/1/25-1/31/26) and two option years, plus a potential 6-month extension under FAR 52.217-8.
The pricing sheet requires contractors to acknowledge full understanding of requirements and confirm site visit attendance. Contractors must fill in unit prices in highlighted cells, with separate CLINs for reports and inspections in each performance period. The template includes spaces for company information, POC details, and CAGE code, with an exceptions tab for noting any deviations. Actual invoicing will be based on services provided rather than the not-to-exceed quantities listed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis Sol combo Erosion.docx | DOCX document | |
| SOW DSCR ESC 20241121 - DM-FRE comments KO edits.docx | DOCX document | |
| Pricing Sheet Erosion Inspection.xlsx | XLSX spreadsheet | |
| Synopsis Sol combo Erosion.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet Pricing Sheet Erosion and Sediment Control Inspections SP4703-25-Q-0011
NOTICE TO CONTRACTOR: Please fill in the green highlighted cells only.
| Company Name: | POC Name: |
| Company Address | Position Title |
| POC Phone: | |
| CAGE: | POC email: |
| Important Note: |
| Contractor must review the Statement of Work completely and if any, asked necessary questionstions prior to filling-in this Pricing Sheet. |
| The contractor can provide separate detailed price information (document) as necessary. |
| Please state any exceptions in "Exceptions Tab" of this spreadsheet, if applicable. |
| The contractor should quote based on quantities listed for each PoP but will invoice for actual services provided. |
| Contractor Acknowledgement: |
| 1. Contractor fully understands the requirement and priced accordingly on this pricing sheet. Type in “Yes” in the box next to this statement. |
| 2. Contractor has attended a site visit and fully understand the requirement. Please indicate Yes or No in the box next to this statement. |
| 3 Year total: | $ - 0 | |||||
| Base Year | Dates: TBD (estimate 2/1/25-1/31/26) | |||||
| CLIN | Service | SOW Ref | Not to Exceed Quantity | Unit of Issue | Unit Price | Total Price |
| 0001 | Task 1: Reports | 5.1 | 3 | Each | $ - 0 | |
| 0002 | Task 2: Inspections | 5.2 | 69 | each | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option I/A/W FAR 52.217-9 Option to Extend Term of the Contract | ||||||
| The Government may extend the term of this contract by written notice to the Contractor within 15 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension. |
| Option Year 1 | Dates: TBD | |||||
| CLIN | Service | SOW Ref | Not to Exceed Quantity | Unit of Issue | Unit Price | Total Price |
| 1001 | Task 1: Reports | 5.1 | 3 | Each | $ - 0 | |
| 1002 | Task 2: Inspections | 5.2 | 69 | each | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option Year 2 | Dates: TBD | |||||
| CLIN | Service | SOW Ref | Not to Exceed Quantity | Unit of Issue | Unit Price | Total Price |
| 2001 | Task 1: Reports | 5.1 | 3 | Each | $ - 0 | |
| 2002 | Task 2: Inspections | 5.2 | 69 | each | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option I/A/W FAR 52.217-8 Option to Extend Services | ||||||
| The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days. |
| Option Year 1 and 2 pricing listed above also applies to this clause if exercised during Year 1 or 2. Number of reports/inspections may vary during this option period but will not exceed total length of 6 months. |
| Please indicate 3rd year pricing below (green color box). |
| Option Year 3 | Dates: TBD (up to 6 months pricing only) | ||||
| CLIN | Service | SOW Ref | Quantity | Unit of Issue | Unit Price |
| 0001 | Task 1: Reports | 5.1 | 1 | Each | |
| 0002 | Task 2: Inspections | 5.2 | 1 | each |
Exceptions