Pricing_Schedule.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- 89503625RSW000047
About this file
The provided file is a Pricing Schedule Excel spreadsheet for the Springfield Operations Server Room Upgrade project. The document outlines a detailed pricing breakdown across multiple phases (1A and 1B), including various construction and infrastructure components such as demolition, general conditions, interior walls, suspended ceiling, concrete pad, plumbing, HVAC, electrical work, fire protection, and bonding. The related federal contract opportunity is a solicitation (Number 89503625RSW000047) issued by the Department of Energy Southeastern Power Administration for a server and SCADA room HVAC system and fire suppression system upgrade. The pricing schedule indicates a comprehensive project scope with line items for different construction and system enhancement stages, though the total project cost is not specified in the visible data.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 89503625RSW000047 - Released.pdf | ||
| A14_WD_ar24.txt | TXT text file | |
| Sol_89503625RSW000047.pdf | ||
| A-14_Attachment_3__1(b)_Drawings.pdf | ||
| Attachment_INVOICING_INSTRUCTIONS.docx | DOCX document | |
| A-14_Attachment_1__1(a)_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITEM NO. | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| Springfield Operations Server Room Upgrade | 1 | 1 | |||
| 1 | MATERIAL PHASE lA | 1 | 1 | ||
| 2 | DEMOLITIONS, CLEANUP, PROFIT, ETC - PHASE lA | 1 | 1 | ||
| 3 | GENERAL CONDITIONS - PHASE lB | 1 | 1 | ||
| 4 | DEMOLITION AND CLEANUP- PHASE lB | 1 | 1 | ||
| 5 | INTERIOR WALL - ROOM #113 - PHASE lB | 1 | 1 | ||
| 6 | SUSPENDED CEILING AND SOUND INSULATION - PHASE lB | 1 | 1 | ||
| 7 | CONCRETE PAD - PHASE lB | 1 | 1 | ||
| 8 | PLUMBING - PHASE lB | 1 | 1 | ||
| 9 | HVAC - PHASE 1B | 1 | 1 | ||
| 10 | ELECTRICAL PHASE – lB | 1 | 1 | ||
| 11 | FIRE PROTECTION - PHASE lB | 1 | 1 | ||
| 12 | BONDS (3%) - PHASE 1A/1B | 1 | 1 | ||
| TOTAL | 0 |