Pricing Schedule.pdf

PDF 108 KB Posted

Attached to
Lock & Dam 5A Routine Gate Maintenance Quality Assurance Services
Solicitation number
W912ES25QA009
Issued by

About this file

This document is a Pricing Schedule for Lock & Dam 5A Routine Gate Maintenance Quality Assurance Services, detailing a comprehensive quality assurance services contract with the U.S. Army Corps of Engineers St. Paul District. The schedule is structured across a base period and three option periods, with multiple Contract Line Item Numbers (CLINs) specifying various inspection and travel-related services including submittal reviews, RFI reviews, roller gate inspections, end shield inspections, and weekly control meetings.

Key service categories include developing QA inspection plans, conducting non-destructive testing (NDT) inspections, performing general condition and fabrication inspections, coating and painting inspections, and final acceptance inspections for roller gates, end shields, and bulkhead components. The contract involves 52 weekly virtual control meetings in the base and each option period, with quantities ranging from 1-26 per CLIN for different inspection types, suggesting a detailed and structured quality assurance approach for maintenance activities at Lock and Dam 5A.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Services LD5A RGM QA

CLIN Description QTY UOM Unit Price Total Price 0001 Develop QA Inspection Plan 1 JOB 0002 Submittal Reviews 26 Each 0003 RFI Reviews 16 Each 0004 Roller Gate Bulkhead Repair Inspections & Travel 3 Each 0005 General Condition Inspection & Travel 1 Each 0006 NDT Inspection & Travel for Roller Gate 1 Each 0007 Roller Gate Repair Plan Inspection & Travel 1 Each 0008 Roller Gate Coating & Painting Inspections & Travel 2 Each 0009 Roller Gate Final Acceptance Inspection & Travel 1 Each 0010 Weekly and Three-Phase Control Meetings (Virtual) 52 Each 0011 Roller Gate Final Inspection Report 1 Each 0012 End Shield Fabrication Inspection & Travel 4 Each 0013 End Shield Coating Inspection & Travel 2 Each 0014 End Shield Connection Inspection & Travel 1 Each

CLIN Description QTY UOM Unit Price Total Price 1001 Submittal Reviews 6 Each 1002 RFI Reviews 8 Each 1003 General Condition Inspection & Travel 2 Each 1004 NDT Inspection & Travel for Roller Gate 2 Each 1005 Roller Gate Repair Plan Inspection & Travel 2 Each 1006 Roller Gate Coating & Painting Inspections & Travel 3 Each 1007 Roller Gate Final Acceptance Inspection & Travel 3 Each 1008 Weekly and Three-Phase Control Meetings (Virtual) 50 Each 1009 Roller Gate Final Inspection Report 1 Each 1010 End Shield Fabrication Inspection & Travel 2 Each 1011 End Shield Coating Inspection & Travel 1 Each 1012 End Shield Connection Inspection & Travel 2 Each

1013 Bulkhead Trucks Coating & Painting Inspections & Travel 2 Each Total Option Period 1

Option Period 1

SCHEDULE OF SERVICES

LOCK AND DAM 5A ROUTINE GATE MAINTENANCE QUALITY ASSURANCE SERVICES

Base Period

Total Base

LOCK AND DAM 5A ROUTINE GATE MAINTENANCE QUALITY ASSURANCE SERVICES

Schedule of Services LD5A RGM QA

CLIN Description QTY UOM Unit Price Total Price 2001 Submittal Reviews 6 Each 2002 RFI Reviews 8 Each 2003 General Condition Inspection & Travel 2 Each 2004 NDT Inspection & Travel for Roller Gate 2 Each 2005 Roller Gate Repair Plan Inspection & Travel 2 Each 2006 Roller Gate Coating & Painting Inspections & Travel 3 Each 2007 Roller Gate Final Acceptance Inspection & Travel 3 Each 2008 Weekly and Three-Phase Control Meetings (Virtual) 52 Each 2009 Roller Gate Final Inspection Report 2 Each 2010 End Shield Fabrication Inspection & Travel 2 Each 2011 End Shield Coating Inspection & Travel 1 Each 2012 End Shield Connection Inspection & Travel 1 Each 2013 Tainter Gate Bulkhead Repair Inspections & Travel 2 Each

CLIN Description QTY UOM Unit Price Total Price 3001 Submittal Reviews 6 Each 3002 RFI Reviews 8 Each 3003 General Condition Inspection & Travel 1 Each 3004 NDT Inspection & Travel for Roller Gate 1 Each 3005 Roller Gate Repair Plan Inspection & Travel 1 Each 3006 Roller Gate Coating & Painting Inspections & Travel 2 Each 3007 Roller Gate Final Acceptance Inspection & Travel 1 Each 3008 Weekly and Three-Phase Control Meetings (Virtual) 52 Each 3009 Roller Gate Final Inspection Report 1 Each 3010 End Shield Fabrication Inspection & Travel 2 Each 3011 End Shield Coating Inspection & Travel 1 Each 3012 End Shield Connection Inspection & Travel 1 Each

Final Roller Gate Bulkhead Painting and Coating Inspection & Travel 2 Each

Total Option Period 3

GRAND TOTAL FOR BASE PLUS OPTION PERIODS

LOCK AND DAM 5A ROUTINE GATE MAINTENANCE QUALITY ASSURANCE SERVICES

Option Period 2

Total Option Period 2

LOCK AND DAM 5A ROUTINE GATE MAINTENANCE QUALITY ASSURANCE SERVICES

Option Period 3