Chesnut Park Managed Aquifer Recharge Well Drilling And Completion Of Subsurface Testing
Solicitation number
26-0046-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a pricing proposal form for Invitation to Bid - Construction (ITB-C) #26-0046-ITB-C issued by Pinellas County Utilities for the Chesnut Park Managed Aquifer Recharge Well Drilling and Completion of Subsurface Testing project. The project involves drilling and completing a Class V injection well (MAR-1) to 1,250 feet below land surface and a shallow monitor well (MW-1) to 430 feet below land surface in the southern portion of John Chesnut Sr. Park. The MAR-1 well includes mobilization and demobilization of equipment, pit casing setup, pilot hole drilling to 1,250 feet using reverse-air techniques, reaming operations at various diameters, geophysical logging at multiple depths, installation of 42-inch, 32-inch, and 24-inch diameter carbon steel casing, grouting operations, coring samples, packer testing, pumping tests, injection tests, well development, and water sampling across multiple analytical lists. The MW-1 well includes similar mobilization activities, pilot hole drilling to 430 feet, 24-inch diameter reaming to 160 feet, installation of carbon steel and PVC casing, grouting, development, and optional packer testing. The mandatory site visit was scheduled for November 5, 2025, at 10:00 am, with questions due by November 7, 2025, and proposal submissions due November 13, 2025, at 3:00 pm. The contract duration is 540 consecutive calendar days including a 12-month guarantee period, and the award will be made to the lowest responsive, responsible bidder.

The pricing proposal requires bidders to submit unit costs and total prices for all line items across both wells. The project is co-funded by the Southwest Florida Water Management District (SWFWMD) and Pinellas County Utilities. A Small Business Enterprise (SBE) participation goal of 5% of the contract value has been established to provide opportunities for smaller contractors. Bidders must comply with E-Verify requirements and provide proof of employment authorization for workers hired after January 1, 2021. Insurance requirements mandate minimum coverage limits ranging from $500,000 to $1,000,000 per occurrence from responsible companies authorized to do business in Florida. Additional requirements include submission of a bonding letter, reference projects, and detailed corporate information demonstrating technical capability and financial stability. The project must adhere to all Florida Department of Environmental Protection (FDEP) regulations and comprehensive technical specifications outlined in the Scope of Work.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid - Construction (ITB-C) #26-0046-ITB-C Title: Chesnut Park Managed Aquifer Recharge Well Drilling And Completion Of Subsurface Testing

9. Pricing Proposal

RECHARGE WELL MAR-1

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Mobilize and Demobilize All Equip. to the MAR-1 Well Site to Complete

Drilling and Testing Activities for

MAR-1, Complete, Including Drilling

Pad and Four Water Table Monitoring

Wells

1 LS

2 Set Pit Casing, Complete 1 LS

3 Drilling - Pilot Hole, Drill Nominal 8 to

12-¼ -Inch Dia. Pilot Hole Using Mud

Rotary or Reverse-Air Drilling

Techniques, Complete to Depth of:

0 N/A

3a a.170 feet (Mud Rotary) 170 FT

3b b. 1,250 feet (Reverse-air) 1,080 FT

4 Drilling - Reaming or Open Hole to

Depth of:

0 N/A

4a a. 48-inch Diameter to 160 feet (Mud

Rotary)

160 FT

4b b. 42-inch Diameter to 470 feet

(Reverse-air)

310 FT

4c c. 32-inch Diameter up to 600 feet

(Reverse-air)

130 FT

4d d. 24-inch Diameter up to 1,250 feet

(Reverse-air)

650 FT

5 Geophysical Logging - Furnish, Setup, Operate, and Remove all Equip. to

Conduct Geophysical Logs in

Accordance with Table 1 of Section

02679 on:

0 N/A

5a a. Pilot Hole to 170 feet 1 EA

Line Item Description Quantity Unit of

Measure Unit Cost Total

5b b. Reamed Hole to 160 feet 1 EA

5c c. Pilot Hole to 500 feet 1 EA

5d d. Reamed Hole to 470 feet 1 EA

5e e. Pilot Hole to 1,250 feet 1 EA

5f f. Reamed Hole to 600 feet 1 EA

5g g. Completed Well to 1,250 feet 1 EA

5h h. Temperature Log Following Each

Cement Stage

3 EA

5j j. Cement Bond log final casing 1 EA

6 Casing, Furnish and Install: 0 N/A

6a a. 42-inch Dia. Carbon Steel 160 FT

6b b. 32-inch Dia. Carbon Steel 470 FT

6c c. 24-inch Dia. Carbon Steel 600 FT

7 Grout - Carbon Steel Casing from

Bottom to Land Surface and Pilot

Holes Prior to Reaming Using ASTM

Type II Cement with up to 8%

Bentonite Gel:

4,500 Sacks

8 Gravel - Furnish and Emplace Clean

Gravel Used to Plug Cavities, Complete

100 FT3

9 Pressure Test 24-inch Dia. Casing -

Successfully Complete Pressure Test on Casing Prior to Drilling Out Plug or with packer, Complete

1 LS

Unit Cost Total

10 Coring - During Pilot Hole or Open

Hole Drilling, Provide 10-Foot Length, 4-Inch Diameter Cores at Selected

Intervals, Complete

40 Feet

Recovered

11 Packer Test Setup - Furnish, Setup, Operate, and Remove all Equip.

Necessary to Run Packer Pumping

Test, Complete

8 EA

12 Packer Test Pumping Time, Complete 80 HR

13 Pumping Test Setup, Complete 1 LS

14 Pumping Test Pumping Time, Complete

8 HR

15 Injection Test Setup, Complete 1 LS

16 Injection Test Pumping Time, Complete

8 HR

17 Development, Complete 24 HR

18 Temporary Wellhead - Complete

Wellhead in accordance with the

Drawings, Complete

1 LS

19 Standby Time (Max. 12 hr/day) 40 HR

20 Extra Work - Furnish Drilling Rig and

Crew to Perform Extra Work Not

Included in the Specifications When

Directed by the GEOLOGIST, Complete

40 HR

21 Water Sampling - Collect, Analyze, and Report Water Samples in

Accordance with Section 02311 for:

0 N/A

21a a. Water Table Monitoring Wells

Weekly Compliance Samples

1 LS

21b b. Exhibit 1, List A 36 EA

Unit Cost Total

21c c. Exhibit 1, List B 16 EA

21d d. Exhibit 1, List C 1 EA

22 Bridge Plug 2 EA

TOTAL

SHALLOW MONITOR WELL (MW-1)

Measure Unit Cost Total

1 Mobilize and Demobilize All Equip. to the Well Site to complete Drilling and testing Activities for MW-1, Complete, Including Drilling Pad and Four Water

Table Monitoring Wells

1 LS

2 Set Pit Casing, Complete 1 LS

3 Drilling - Pilot Hole, Drill Nominal 6 to

12-Inch Nominal Dia. Pilot

Hole/Borehole Using Mud Rotary or

Reverse-Air Drilling Techniques, Complete to Depth of:

0 N/A

3a a. 170 feet (Mud Rotary) 170 FT

2b b. 430 feet (Reverse-air) 260 FT

4 Drilling - Reaming or Open Hole to

Depth of:

0 N/A

4a a. 24-inch nominal Diameter to 160 feet (Mud Rotary)

160 FT

5 Geophysical Logging - Furnish, Setup, Operate, and Remove all Equip. to

Conduct Geophysical Logs in

Accordance with Table 1 of Section

02679 on:

Unit Cost Total

5a a. Pilot Hole to 170 feet 1 EA

5b b. Reamed Hole to 160 feet 1 EA

5c c. Borehole to 430 feet 1 EA

5d d. Completed Well to 430 feet 1 EA

6 Casing, Furnish and Install: 0 N/A

6a a. 16-inch Dia. Carbon Steel 160 FT

6b b. 8-inch Dia. PVC SDR-17 80 FT

6c c. 6-inch Dia. PVC SDR-17 320 FT

7 Grout - Carbon Steel Casing from

Bottom to Land Surface and Pilot

Holes Prior to Reaming Using ASTM

Type II Cement with up to 8%

Bentonite Gel:

700 Sacks

8 Gravel - Furnish and Emplace Clean

Gravel Used to Plug Cavities, Complete

100 FT3

9 Development, Complete 24 HR

10 Temporary Wellhead - Complete

Wellhead in accordance with the

Drawings, Complete

1 LS

11 Standby Time (Max. 12 hr/day) 12 HR

12 Extra Work - Furnish Drilling Rig and

Crew to Perform Extra Work Not

Included in the Specifications When

Directed by the ENGINEER, Complete

12 HR

13 Water Sampling - Collect, Analyze, and Report Water Samples in

Accordance with Section 02311 for:

Unit Cost Total

13a a. Water Table Monitoring Wells

Weekly Compliance Samples

1 LS

13b b. Exhibit 1, List C 1 EA

14 Packer Test Setup (if Required) -

Furnish, Setup, Operate, and Remove all Equip. Necessary to Run Packer

Pumping Test, Complete

2 EA

15 Packer Test Pumping Time, Complete 10 HR