Bid_Form_Table_MAR_Well.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Chesnut Park Managed Aquifer Recharge Well Drilling And Completion Of Subsurface Testing
Solicitation number
26-0046-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a Bid Form for the Pinellas County Reclaimed Water Managed Aquifer Recharge (MAR) Well System project in Florida. The bid form covers two primary parts: Part I for a Recharge Well (MAR-1) and Part II for an Optional Shallow Monitor Well (MW-1). The project involves drilling and completing subsurface testing wells, with the MAR-1 well proposed to have 24-inch steel casing extending to approximately 600 feet below land surface and an open hole up to 1,250 feet into the Avon Park Formation. The optional MW-1 well will be a 6-inch diameter monitor well completed with PVC casing to about 400 feet below land surface. The total project duration is set at 365 calendar days.

The bid form provides a detailed unit price schedule with numerous line items covering activities such as mobilization, drilling, casing installation, geophysical logging, grouting, testing, water sampling, and development. While no specific pricing is filled in on the form, it includes estimated quantities for each task, allowing bidders to calculate total project costs. The project appears to be funded through Pinellas County and involves specialized hydrogeological testing and monitoring, with specific technical requirements for well construction in the Avon Park high-permeability zone. The optional nature of the MW-1 well suggests it will be constructed based on Florida Department of Environmental Protection (FDEP) requirements and hydrogeologic conditions encountered during the MAR-1 drilling.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 1 Bid Form

Pinellas County
Reclaimed Water MAR Well System
Unit Price Bid Form
PART I - RECHARGE WELL MAR-1
Pay ItemDescriptionUnitEst. QTYUnit
CostComputed Total Price for Item
I-1.Mobilize and Demobilize All Equip. to the MAR-1 Well Site to Complete Drilling and Testing Activities for MAR-1, Complete, Including Drilling Pad and Four Water Table Monitoring WellsLS1$ - 0
I-2.Set Pit Casing, CompleteLS1$ - 0
I-3.Drilling - Pilot Hole, Drill Nominal 8 to 12-¼ -Inch Dia. Pilot Hole Using Mud Rotary or Reverse-Air Drilling Techniques, Complete to Depth of:
a.170 feet (Mud Rotary)FT170$ - 0
b. 1,250 feet (Reverse-air)FT1080$ - 0
I-4.Drilling - Reaming or Open Hole to Depth of:
a. 48-inch Diameter to 160 feet (Mud Rotary)FT160$ - 0
b. 42-inch Diameter to 470 feet (Reverse-air)FT310$ - 0
c. 32-inch Diameter up to 600 feet (Reverse-air)FT130
d. 24-inch Diameter up to 1,250 feet (Reverse-air)FT650$ - 0
I-5.Geophysical Logging - Furnish, Setup, Operate, and Remove all Equip. to Conduct Geophysical Logs in Accordance with Table 1 of Section 02679 on:
a. Pilot Hole to 170 feetEA1$ - 0
b. Reamed Hole to 160 feetEA1$ - 0
c. Pilot Hole to 500 feetEA1$ - 0
d. Reamed Hole to 470 feetEA1$ - 0
e. Pilot Hole to 1,250 feetEA1$ - 0
f. Reamed Hole to 600 feetEA1$ - 0
g. Completed Well to 1,250 feetEA1$ - 0
h. Temperature Log Following Each Cement StageEA3$ - 0
j. Cement Bond log final casingEA1$ - 0
I-6.Casing, Furnish and Install:
a. 42-inch Dia. Carbon SteelFT160$ - 0
b. 32-inch Dia. Carbon SteelFT470$ - 0
c. 24-inch Dia. Carbon SteelFT600$ - 0
I-7.Grout - Carbon Steel Casing from Bottom to Land Surface and Pilot Holes Prior to Reaming Using ASTM Type II Cement with up to 8% Bentonite Gel:
Sacks4500$ - 0
I-8.Gravel - Furnish and Emplace Clean Gravel Used to Plug Cavities, CompleteFT3100$ - 0
I-9.Pressure Test 24-inch Dia. Casing - Successfully Complete Pressure Test on Casing Prior to Drilling Out Plug or with packer, Complete
LS1$ - 0
I-10.Coring - During Pilot Hole or Open Hole Drilling, Provide 10-Foot Length, 4-Inch Diameter Cores at Selected Intervals, Complete
Feet Recovered40$ - 0
I-11.Packer Test Setup - Furnish, Setup, Operate, and Remove all Equip. Necessary to Run Packer Pumping Test, Complete
EA8$ - 0
I-12.Packer Test Pumping Time, CompleteHR80$ - 0
I-13.Pumping Test Setup, CompleteLS1$ - 0
I-14.Pumping Test Pumping Time, CompleteHR8$ - 0
I-15.Injection Test Setup, CompleteLS1$ - 0
I-16.Injection Test Pumping Time, CompleteHR8$ - 0
I-17.Development, CompleteHR24$ - 0
I-18.Temporary Wellhead - Complete Wellhead in accordance with the Drawings, Complete
LS1$ - 0
I-19.Standby Time (Max. 12 hr/day)HR40$ - 0
I-20.Extra Work - Furnish Drilling Rig and Crew to Perform Extra Work Not Included in the Specifications When Directed by the GEOLOGIST, Complete
HR40$ - 0
I-21.Water Sampling - Collect, Analyze, and Report Water Samples in Accordance with Section 02311 for:$ - 0
a. Water Table Monitoring Wells Weekly Compliance SamplesLS1$ - 025.8
b. Exhibit 1, List AEA36$ - 036.3
c. Exhibit 1, List BEA16$ - 02 x 8 off bottom packers
d. Exhibit 1, List CEA1$ - 0
I-22.Bridge PlugEA2$ - 0
TOTAL PART I$ - 0

Chesnut Park MAR Well System &D Bid Form Part I - Page &P of &N

Part 2 Bd Form

PART II (OPTIONAL) - SHALLOW MONITOR WELL (MW-1)
Pay ItemDescriptionUnitEst. QTYUnit
CostComputed Total Price for Item
II-1.Mobilize and Demobilize All Equip. to the Well Site to complete Drilling and testing Activities for MW-1, Complete, Including Drilling Pad and Four Water Table Monitoring WellsLS1$ - 0
II-2.Set Pit Casing, CompleteLS1$ - 0
II-3.Drilling - Pilot Hole, Drill Nominal 6 to 12-Inch Nominal Dia. Pilot Hole/Borehole Using Mud Rotary or Reverse-Air Drilling Techniques, Complete to Depth of:
a. 170 feet (Mud Rotary)FT170$ - 0
b. 430 feet (Reverse-air)FT260$ - 0
II-4.Drilling - Reaming or Open Hole to Depth of:
a. 24-inch nominal Diameter to 160 feet (Mud Rotary)FT160$ - 0
II-5.Geophysical Logging - Furnish, Setup, Operate, and Remove all Equip. to Conduct Geophysical Logs in Accordance with Table 1 of Section 02679 on:
a. Pilot Hole to 170 feetEA1$ - 0
b. Reamed Hole to 160 feetEA1$ - 0
c. Borehole to 430 feetEA1$ - 0
d. Completed Well to 430 feetEA1$ - 0
II-6.Casing, Furnish and Install:
a. 16-inch Dia. Carbon SteelFT160$ - 0
b. 8-inch Dia. PVC SDR-17FT80$ - 0
c. 6-inch Dia. PVC SDR-17FT320$ - 0
II-7.Grout - Carbon Steel Casing from Bottom to Land Surface and Pilot Holes Prior to Reaming Using ASTM Type II Cement with up to 8% Bentonite Gel:
Sacks700$ - 0
II-8.Gravel - Furnish and Emplace Clean Gravel Used to Plug Cavities, CompleteFT3100$ - 0
II-9.Development, CompleteHR24$ - 0
II-10.Temporary Wellhead - Complete Wellhead in accordance with the Drawings, Complete
LS1$ - 0
II-11.Standby Time (Max. 12 hr/day)HR12$ - 0
II-12.Extra Work - Furnish Drilling Rig and Crew to Perform Extra Work Not Included in the Specifications When Directed by the ENGINEER, Complete
HR12$ - 0
II-13.Water Sampling - Collect, Analyze, and Report Water Samples in Accordance with Section 02311 for:$ - 0
a. Water Table Monitoring Wells Weekly Compliance SamplesLS1$ - 012.9
b. Exhibit 1, List CEA1$ - 0
II-14.Packer Test Setup (if Required) - Furnish, Setup, Operate, and Remove all Equip. Necessary to Run Packer Pumping Test, Complete
EA2$ - 0
II-15.Packer Test Pumping Time, CompleteHR10$ - 0
TOTAL PART II$ - 0

&D Bid Form Part II - Page &P of &N

Summary of Bid Form

SUMMARY OF BID
Total Part I – Recharge Well (MAR-1) Completion$
Total Part II (OPTIONAL) – Monitor Well (MW-1)$
Total (Part I and Part II)$ - 0
Total Parts with Contingency$ - 0
TIME OF SUBSTANTIAL COMPLETION (Parts I, II): 365 CALENDAR DAYS

Internal notes

&D Bid Form Summary of Bid - Page &P of &N cement vol

Casing (inches)Cu ft/ftgal/ftannulus vol cf/ftlinear feet
47.2512.1791.0
429.6271.9
41.259.2869.4
325.5841.8
31.255.3239.8
243.1423.5
21.252.4618.4
161.4010.4
15.251.279.5
8.6250.413.0242.670484375
6.6250.241.8930.6446206597
12.250.826.11173.315105034723.4663021007
RW-1ft csg or pilot holecf fttotaladd 20%totalsacks (neat)
32'' to 160'1602.55409490
32'' to 470'4703.69417362604

james larkin: james larkin:

30% overage 24'' to 600 600 2.184 1310 1965 james larkin: james larkin:

30% overage pilot hole 8% Ocala 130 0.82 106 160 5219 4349

RZMW-1
12" to 160'1601.066171205
8" to 80'800.86269103
6" 80' to 600'3201.029329494

james larkin: james larkin:

30% overage 802 668

Sheet3

Sheet2

File details come from the government source that posted it. Updated .