This document is a Pricing Proposal from Invitation to Bid - Construction (ITB-C) #23-1161-ITB-C for Pinellas County's Waste-to-Energy (WTE) Facility Structural Steel Replacement project. The proposal outlines a comprehensive 3-phase construction approach for repairing and replacing structural steel across multiple facility areas, including the SDA (Specific Designated Area) and Baghouse sections. The project involves repairs and replacements for three units in each phase, targeting structural components that have degraded due to long-term weather exposure and operational conditions.

The pricing proposal is structured with 12 line items that break down the project's costs by percentage, covering project management stages and specific repair areas. The percentages range from 1% for initial project management (receipt of purchase order) to 13% for Baghouse Outlet Duct repairs. Project management activities include receiving the purchase order (1%), mobilizing to the site and delivering 30% of fabricated material (10%), and project closeout with acceptance documentation (5%). The remaining line items detail specific structural steel repair and replacement work for different units and areas of the facility, with the goal of improving working conditions and extending component longevity as part of Pinellas County's "Zero Waste to Landfill" master plan by 2050.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid - Construction (ITB-C) #23-1161-ITB-C Title: WTE Structural Steel Replacement

9. PRICING PROPOSAL

WTE STRUCTURAL STEEL REPLACEMENT

Bid line items for 3 phase approach for construction

Line Item Description Unit of Measure Unit Cost

1 Project Management - Receipt of Purchase Order 1%

2 Project Management - Mobilize to Site and Delivery of

30% of Fabricated Material 10%

3 Project Management - Project Closeout and Acceptance

Documentation 5%

4 Phase 1: SDA Area - Unit 1 SDA Structural Steel Repairs and Replacements 6%

5 Phase 1: SDA Area - Unit 2 SDA Structural Steel Repairs and Replacements 6%

6 Phase 1: SDA Area - Unit 3 SDA Structural Steel Repairs and Replacements 6%

7 Phase 2: Baghouse Area - Unit 1 Baghouse Structural

Steel Repairs and Replacements 9%

8 Phase 2: Baghouse Area - Unit 2 Baghouse Structural

Steel Repairs and Replacements 9%

9 Phase 2: Baghouse Area - Unit 3 Baghouse Structural

Steel Repairs and Replacements 9%

10 Phase 3: Baghouse Outlet Duct - Unit 1Baghouse Outlet

Duct Structural Steel Repairs and Replacements 13%

11 Phase 3: Baghouse Outlet Duct - Unit 1 Baghouse Outlet

Duct Structural Steel Repairs and Replacements 13%

12 Phase 3: Baghouse Outlet Duct - Unit 1 Baghouse Outlet

Duct Structural Steel Repairs and Replacements 13%