Pricing_Form_Horizontal_Directional_Drilling_FINAL.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Horizontal Directional Drilling
- Solicitation number
- 2025-103
- Issued by
- Alachua County, Glencoe CDP, Florida
About this file
This is a Pricing Form for Horizontal Directional Drilling (HDD) services issued by Gainesville Regional Utilities (GRU) for contract 2025-103 in Alachua County, Florida. The solicitation seeks qualified vendors to perform underground utility line installations across water distribution, wastewater collection, gas mains, communication, and electric conduits using horizontal directional drilling techniques. The contract will run from October 1, 2025, to September 30, 2028, with potential renewals for two additional one-year periods. The bid response deadline is September 30, 2025, at 2:00 pm, with a deadline for questions on September 16, 2025.
The comprehensive pricing schedule includes detailed unit pricing for various pipe materials and sizes, ranging from 2" to 16" in diameters, covering HDPE, ductile iron, and PE tubing for different utility types. Additional pricing is included for specialized services such as premium work hours, emergency mobilization, pipe fusing, hydrostatic testing, rock removal, and traffic control. While no specific contract value is stated, the document requires vendors to bid on the entire form to be considered responsive. Insurance requirements include $2,000,000 in Commercial General Liability, $1,000,000 in Automobile Liability, and statutory Workers' Compensation coverage. Vendors must submit a 5% bid bond and extensive documentation including business registration, experience modification rate documentation, OSHA forms, contractor references, and comprehensive staffing and equipment plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Horizontal_Directional_Drilling_(Addendum_#2_Revision).pdf | ||
| Horizontal_Directional_Drilling.pdf | ||
| Pricing_Form_Horizontal_Directional_Drilling_FINAL.xlsx | XLSX spreadsheet | |
| Horizontal_Directional_Drilling_Tech..docx | DOCX document | |
| Contract_Sample_Document.pdf | ||
| 2025_HorizontalDirectionalDrill_TechSpec_final.docx | DOCX document | |
| 2025HDDPricingResponseForm.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule
| ATTACHMENT C |
| 2025-103 HORIZONTAL DIRECTIONAL DRILLING |
| PRICING SHCEDULE |
Vendor Name: _____________________________________________ Date: _____________________
Bid Item Bid Item Description Unit Unit Price
| A | Water Distribution | GRU Furnish | Contractor Furnish | |
| Carrier Pipes | ||||
| A.1 | 2" CTS Blue or Purple, DR 9 | LF | ||
| A.2 | 4" DI Pipe | LF | ||
| A.3 | 6" DI Pipe | LF | ||
| A.4 | 8" DI Pipe | LF | ||
| A.6 | 12" DI Pipe | LF | ||
| A.7 | 16'' DI Pipe | LF | ||
| A.8 | 4" HDPE, DR 11 | LF | ||
| A.9 | 6" HDPE, DR 11 | LF | ||
| A.10 | 8" HDPE, DR 11 | LF | ||
| A.11 | 12" HDPE, DR 11 | LF | ||
| A.12 | 16'' HDPE, DR 11 | LF | ||
| Casing Pipes | ||||
| A.13 | 2" PE Tubing Service Casing, DR 13.5 (50 LF or Less) incl Mob | EA | ||
| A.14 | 2" PE Tubing Service Casing, DR 13.5 (Additional Length) | LF | ||
| A.15 | 4" PE Tubing Casing, DR 13.5 | LF | ||
| A.16 | 6'' PE Tubing Casing, DR 13.5 | LF | ||
| B | Wastewater Collection - Force Mains | GRU Furnish | Contractor Furnish | |
| B.1 | 2" HDPE (IPS), DR 11 | LF | ||
| B.1 | 4" HDPE, DR 11 | LF | ||
| B.2 | 6" HDPE, DR 11 | LF | ||
| B.3 | 8" HDPE, DR 11 | LF | ||
| B.5 | 12" HDPE, DR 11 | LF | ||
| B.6 | 16'' HDPE, DR 11 | LF | ||
| D | Gas Mains | GRU Furnish | ||
| D.1 | 2" and Smaller HDPE Carrier/Casing | LF | ||
| D.2 | 3" HDPE SDR 17 Carrier/Casing | LF | ||
| D.3 | 4" HDPE SDR 17 Carrier/Casing | LF | ||
| D.4 | 6" HDPE SDR 17 Carrier/Casing | LF | ||
| D.5 | 8" HDPE SDR 17 Carrier/Casing | LF | ||
| D.6 | 10" HDPE SDR 17 Carrier/Casing | LF | ||
| E | Communication Conduits | GRU Furnish | ||
| E.1 | 1.5" HDPE Single Conduit | LF | ||
| E.2 | 2" HDPE Single Conduit | LF | ||
| E.3 | 2.5" HDPE Single Conduit | LF | ||
| E.4 | 3" HDPE Single Conduit | LF | ||
| E.5 | 4" HDPE Single Conduit | LF | ||
| E.6 | 1" PVC Conduit | LF | ||
| E.7 | 1.5" PVC Conduit | LF | ||
| E.8 | 2" PVC Conduit | LF | ||
| E.9 | 2.5" PVC Conduit | LF | ||
| E.10 | 3" PVC Conduit | LF | ||
| E.11 | 4" PVC Conduit | LF | ||
| E.12 | 2" HDPE Parallel Conduits | LF | ||
| E.13 | 2.5" HDPE Parallel Conduits | LF | ||
| E.14 | 3" HDPE Parallel Conduits | LF | ||
| E.15 | 4" HDPE Parallel Conduits | LF | ||
| E.16 | Set 2' x 3' pedestal | EA | ||
| E.17 | Set 2' x 3' pedestal in concrete | EA | ||
| E.18 | Set underground junction box | EA | ||
| E.19 | Set underground junction box in concrete | EA | ||
| E.20 | Set 10" round pedestal | EA | ||
| E.21 | Set 10" round pedestal in concrete | EA | ||
| E.22 | Remove 2' x 3' pedestal | EA | ||
| E.23 | Remove 2' x 3' pedestal set in concrete | EA | ||
| E.24 | Remove underground junction box | EA | ||
| E.25 | Remove underground junction box set in concrete | EA | ||
| E.26 | Remove 10" round pedestal | EA | ||
| E.27 | Remove 10" round pedestal set in concrete | EA | ||
| E.28 | Change out 2' x 3' pedestal | EA | ||
| E.29 | Change out 2' x 3' pedestal set in concrete | EA | ||
| E.30 | Change out underground junction box | EA | ||
| E.31 | Change out underground junction box set in concrete | EA | ||
| E.32 | Change out 10" round pedestal | EA | ||
| E.33 | Change out 10" round pedestal set in concrete | EA | ||
| E.34 | Install Pull String | EA | ||
| E | Electric Conduits | GRU Furnish | ||
| F.1 | 1.5'' HDPE Conduit | LF | ||
| F.2 | 2'' HDPE Conduit | LF | ||
| F.3 | 2.5'' HDPE Conduit | LF | ||
| F.4 | 3'' HDPE Conduit | LF | ||
| F.5 | 4'' HDPE Conduit | LF | ||
| F.6 | 6'' HDPE Conduit | LF | ||
| F.7 | 2" HDPE Parallel Conduits | LF | ||
| F.8 | 2.5" HDPE Parallel Conduits | LF | ||
| F.9 | 3" HDPE Parallel Conduits | LF | ||
| F.10 | 4" HDPE Parallel Conduits | LF | ||
| F | Additional Pricing | Contractor Furnish | ||
| G.1 | Premium Work Hours | HR | ||
| G.2 | Emergency Mobilization | EA | ||
| HDPE Adapters | ||||
| G.3 | 4" HDPE MJ Adapter | EA | ||
| G.4 | 6" HDPE MJ Adapter | EA | ||
| G.5 | 8" HDPE MJ Adapter | EA | ||
| G.6 | 10" HDPE MJ Adapter | EA | ||
| G.7 | 12" HDPE MJ Adapter | EA | ||
| G.8 | 16'' HDPE MJ Adapter | EA | ||
| Fusing of Pipe for Customers per each | ||||
| G.9 | 4'' Pipe | EA | ||
| G.10 | 6'' Pipe | EA | ||
| G.11 | 8'' Pipe | EA | ||
| G.12 | 10'' Pipe | EA | ||
| G.13 | 12'' Pipe | EA | ||
| G.14 | 16'' Pipe | EA | ||
| Hydrostatic and Leakage Testing | ||||
| G.15 | Testing for 2"-4" Pipe | EA | ||
| G.16 | Testing for 6" - 8" Pipe | EA | ||
| G.17 | Testing for 10"-12" Pipe | EA | ||
| G.18 | Testing for 16'' Pipe | EA | ||
| Rock Removal | ||||
| G.19 | Rock Removal for 2"-4" Pipe | LF | ||
| G.20 | Rock Removal for 6" - 8" Pipe | LF | ||
| G.21 | Rock Removal for 10"-12" Pipe | LF | ||
| G.22 | Rock Removal for 16'' Pipe | LF | ||
| Traffic Control | ||||
| G.23 | Furnish Flagman (2 man crew minimum per hour) | HR | ||
| G.24 | Furnish Single Lane Closure per FDOT Index 603 | LS | ||
| G.25 | Furnish Multilane Closure per FDOT Index 613 | LS |
NOTE: Respondents must bid the entire bid form items in order to be considered a responsive and qualified bid.