Pricing_Form_Horizontal_Directional_Drilling_FINAL.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Horizontal Directional Drilling
- Solicitation number
- 2025-103
- Issued by
- Alachua County, Glencoe CDP, Florida
About this file
This is a Pricing Form for Horizontal Directional Drilling (HDD) services issued by Gainesville Regional Utilities (GRU) in Florida, detailing a comprehensive pricing schedule for infrastructure utility installation. The document covers multiple utility categories including water distribution, wastewater collection, gas mains, communication conduits, and electric conduits, with line-item pricing for various pipe sizes, materials (such as HDPE, DI, and PVC), and associated installation services. The pricing schedule includes detailed unit pricing for pipe lengths, casing, conduits, and additional services like premium work hours, emergency mobilization, pipe fusing, testing, rock removal, and traffic control.
The pricing form requires vendors to bid on the entire set of line items to be considered responsive, with unit prices specified in linear feet (LF) or per each (EA) for different pipe diameters and materials. The contract appears designed for infrastructure projects involving precise underground utility installations using horizontal directional drilling techniques, with a focus on minimizing surface disruption across various utility types. The document provides a comprehensive pricing framework that allows GRU to obtain standardized pricing for complex underground utility installation services, covering a wide range of potential project scenarios and utility infrastructure needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Horizontal_Directional_Drilling_(Addendum_#2_Revision).pdf | ||
| Horizontal_Directional_Drilling.pdf | ||
| Horizontal_Directional_Drilling_Tech..docx | DOCX document | |
| Contract_Sample_Document.pdf | ||
| 2025_HorizontalDirectionalDrill_TechSpec_final.docx | DOCX document | |
| 2025HDDPricingResponseForm.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule
| ATTACHMENT C |
| 2025-103 HORIZONTAL DIRECTIONAL DRILLING |
| PRICING SHCEDULE |
Vendor Name: _____________________________________________ Date: _____________________
Bid Item Bid Item Description Unit Unit Price
| A | Water Distribution | GRU Furnish | Contractor Furnish | |
| Carrier Pipes | ||||
| A.1 | 2" CTS Blue or Purple, DR 9 | LF | ||
| A.2 | 4" DI Pipe | LF | ||
| A.3 | 6" DI Pipe | LF | ||
| A.4 | 8" DI Pipe | LF | ||
| A.6 | 12" DI Pipe | LF | ||
| A.7 | 16'' DI Pipe | LF | ||
| A.8 | 4" HDPE, DR 11 | LF | ||
| A.9 | 6" HDPE, DR 11 | LF | ||
| A.10 | 8" HDPE, DR 11 | LF | ||
| A.11 | 12" HDPE, DR 11 | LF | ||
| A.12 | 16'' HDPE, DR 11 | LF | ||
| Casing Pipes | ||||
| A.13 | 2" PE Tubing Service Casing, DR 13.5 (50 LF or Less) incl Mob | EA | ||
| A.14 | 2" PE Tubing Service Casing, DR 13.5 (Additional Length) | LF | ||
| A.15 | 4" PE Tubing Casing, DR 13.5 | LF | ||
| A.16 | 6'' PE Tubing Casing, DR 13.5 | LF | ||
| B | Wastewater Collection - Force Mains | GRU Furnish | Contractor Furnish | |
| B.1 | 2" HDPE (IPS), DR 11 | LF | ||
| B.1 | 4" HDPE, DR 11 | LF | ||
| B.2 | 6" HDPE, DR 11 | LF | ||
| B.3 | 8" HDPE, DR 11 | LF | ||
| B.5 | 12" HDPE, DR 11 | LF | ||
| B.6 | 16'' HDPE, DR 11 | LF | ||
| D | Gas Mains | GRU Furnish | ||
| D.1 | 2" and Smaller HDPE Carrier/Casing | LF | ||
| D.2 | 3" HDPE SDR 17 Carrier/Casing | LF | ||
| D.3 | 4" HDPE SDR 17 Carrier/Casing | LF | ||
| D.4 | 6" HDPE SDR 17 Carrier/Casing | LF | ||
| D.5 | 8" HDPE SDR 17 Carrier/Casing | LF | ||
| D.6 | 10" HDPE SDR 17 Carrier/Casing | LF | ||
| E | Communication Conduits | GRU Furnish | ||
| E.1 | 1.5" HDPE Single Conduit | LF | ||
| E.2 | 2" HDPE Single Conduit | LF | ||
| E.3 | 2.5" HDPE Single Conduit | LF | ||
| E.4 | 3" HDPE Single Conduit | LF | ||
| E.5 | 4" HDPE Single Conduit | LF | ||
| E.6 | 1" PVC Conduit | LF | ||
| E.7 | 1.5" PVC Conduit | LF | ||
| E.8 | 2" PVC Conduit | LF | ||
| E.9 | 2.5" PVC Conduit | LF | ||
| E.10 | 3" PVC Conduit | LF | ||
| E.11 | 4" PVC Conduit | LF | ||
| E.12 | 2" HDPE Parallel Conduits | LF | ||
| E.13 | 2.5" HDPE Parallel Conduits | LF | ||
| E.14 | 3" HDPE Parallel Conduits | LF | ||
| E.15 | 4" HDPE Parallel Conduits | LF | ||
| E.16 | Set 2' x 3' pedestal | EA | ||
| E.17 | Set 2' x 3' pedestal in concrete | EA | ||
| E.18 | Set underground junction box | EA | ||
| E.19 | Set underground junction box in concrete | EA | ||
| E.20 | Set 10" round pedestal | EA | ||
| E.21 | Set 10" round pedestal in concrete | EA | ||
| E.22 | Remove 2' x 3' pedestal | EA | ||
| E.23 | Remove 2' x 3' pedestal set in concrete | EA | ||
| E.24 | Remove underground junction box | EA | ||
| E.25 | Remove underground junction box set in concrete | EA | ||
| E.26 | Remove 10" round pedestal | EA | ||
| E.27 | Remove 10" round pedestal set in concrete | EA | ||
| E.28 | Change out 2' x 3' pedestal | EA | ||
| E.29 | Change out 2' x 3' pedestal set in concrete | EA | ||
| E.30 | Change out underground junction box | EA | ||
| E.31 | Change out underground junction box set in concrete | EA | ||
| E.32 | Change out 10" round pedestal | EA | ||
| E.33 | Change out 10" round pedestal set in concrete | EA | ||
| E.34 | Install Pull String | EA | ||
| E | Electric Conduits | GRU Furnish | ||
| F.1 | 1.5'' HDPE Conduit | LF | ||
| F.2 | 2'' HDPE Conduit | LF | ||
| F.3 | 2.5'' HDPE Conduit | LF | ||
| F.4 | 3'' HDPE Conduit | LF | ||
| F.5 | 4'' HDPE Conduit | LF | ||
| F.6 | 6'' HDPE Conduit | LF | ||
| F.7 | 2" HDPE Parallel Conduits | LF | ||
| F.8 | 2.5" HDPE Parallel Conduits | LF | ||
| F.9 | 3" HDPE Parallel Conduits | LF | ||
| F.10 | 4" HDPE Parallel Conduits | LF | ||
| F | Additional Pricing | Contractor Furnish | ||
| G.1 | Premium Work Hours | HR | ||
| G.2 | Emergency Mobilization | EA | ||
| HDPE Adapters | ||||
| G.3 | 4" HDPE MJ Adapter | EA | ||
| G.4 | 6" HDPE MJ Adapter | EA | ||
| G.5 | 8" HDPE MJ Adapter | EA | ||
| G.6 | 10" HDPE MJ Adapter | EA | ||
| G.7 | 12" HDPE MJ Adapter | EA | ||
| G.8 | 16'' HDPE MJ Adapter | EA | ||
| Fusing of Pipe for Customers per each | ||||
| G.9 | 4'' Pipe | EA | ||
| G.10 | 6'' Pipe | EA | ||
| G.11 | 8'' Pipe | EA | ||
| G.12 | 10'' Pipe | EA | ||
| G.13 | 12'' Pipe | EA | ||
| G.14 | 16'' Pipe | EA | ||
| Hydrostatic and Leakage Testing | ||||
| G.15 | Testing for 2"-4" Pipe | EA | ||
| G.16 | Testing for 6" - 8" Pipe | EA | ||
| G.17 | Testing for 10"-12" Pipe | EA | ||
| G.18 | Testing for 16'' Pipe | EA | ||
| Rock Removal | ||||
| G.19 | Rock Removal for 2"-4" Pipe | LF | ||
| G.20 | Rock Removal for 6" - 8" Pipe | LF | ||
| G.21 | Rock Removal for 10"-12" Pipe | LF | ||
| G.22 | Rock Removal for 16'' Pipe | LF | ||
| Traffic Control | ||||
| G.23 | Furnish Flagman (2 man crew minimum per hour) | HR | ||
| G.24 | Furnish Single Lane Closure per FDOT Index 603 | LS | ||
| G.25 | Furnish Multilane Closure per FDOT Index 613 | LS |
NOTE: Respondents must bid the entire bid form items in order to be considered a responsive and qualified bid.
File details come from the government source that posted it. Updated .