2025HDDPricingResponseForm.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Horizontal Directional Drilling
Solicitation number
2025-103
Issued by
Alachua County, Glencoe CDP, Florida

About this file

The document is a comprehensive pricing response form for Gainesville Regional Utilities (GRU) for a Horizontal Directional Drilling (HDD) project in Florida. The Excel spreadsheet provides a detailed pricing matrix for various utility infrastructure installation services, covering water distribution, wastewater collection, gas mains, communication conduits, and electric conduits. The pricing form includes line items for different pipe diameters and materials such as HDPE, ductile iron, and PVC, ranging from 1" to 16" in size, with pricing requested for both GRU-furnished and contractor-furnished components. The form also includes additional pricing categories for premium work hours and mobilization.

The pricing response form offers a granular breakdown of unit prices for linear foot (LF) installations across multiple utility infrastructure types, with specific line items for carrier pipes, casing pipes, and various conduit installations. Additional pricing elements include installation and removal of pedestals, junction boxes, and other infrastructure components, with prices requested on a per-unit or per-hour basis. The document appears to be part of a competitive bidding process for HDD services, with vendors expected to provide detailed pricing for precise utility infrastructure installation methods that minimize surface disruption and meet environmental and regulatory standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Bid Item Bid Item Description Unit Unit Price

AWater DistributionGRU FurnishContractor Furnish
Carrier Pipes
A.12" CTS Blue or Purple, DR 9LF
A.24" DI PipeLF
A.36" DI PipeLF
A.48" DI PipeLF
A.612" DI PipeLF
A.716'' DI PipeLF
A.84" HDPE, DR 11LF
A.96" HDPE, DR 11LF
A.108" HDPE, DR 11LF
A.1112" HDPE, DR 11LF
A.1216'' HDPE, DR 11LF
Casing Pipes
A.132" PE Tubing Casing, DR 13.5LF
A.144" PE Tubing Casing, DR 13.5LF
A.156'' PE Tubing Casing, DR 13.5LF
BWastewater Collection - Force MainsGRU FurnishContractor Furnish
B.12" HDPE (IPS), DR 11LF
B.14" HDPE, DR 11LF
B.26" HDPE, DR 11LF
B.38" HDPE, DR 11LF
B.512" HDPE, DR 11LF
B.616'' HDPE, DR 11LF
DGas MainsGRU Furnish
D.12" and Smaller HDPE Carrier/CasingLF
D.23" HDPE SDR 17 Carrier/CasingLF
D.34" HDPE SDR 17 Carrier/CasingLF
D.46" HDPE SDR 17 Carrier/CasingLF
D.58" HDPE SDR 17 Carrier/CasingLF
D.610" HDPE SDR 17 Carrier/CasingLF
ECommunication ConduitsGRU Furnish
E.11.5" HDPE Single ConduitLF
E.22" HDPE Single ConduitLF
E.32.5" HDPE Single ConduitLF
E.43" HDPE Single ConduitLF
E.54" HDPE Single ConduitLF
E.61" PVC ConduitLF
E.71.5" PVC ConduitLF
E.82" PVC ConduitLF
E.92.5" PVC ConduitLF
E.103" PVC ConduitLF
E.114" PVC ConduitLF
E.122" HDPE Parallel ConduitsLF
E.132.5" HDPE Parallel ConduitsLF
E.143" HDPE Parallel ConduitsLF
E.154" HDPE Parallel ConduitsLF
E.16Set 2' x 3' pedestalEA
E.17Set 2' x 3' pedestal in concreteEA
E.18Set underground junction boxEA
E.19Set underground junction box in concreteEA
E.20Set 10" round pedestalEA
E.21Set 10" round pedestal in concreteEA
E.22Remove 2' x 3' pedestalEA
E.23Remove 2' x 3' pedestal set in concreteEA
E.24Remove underground junction boxEA
E.25Remove underground junction box set in concreteEA
E.26Remove 10" round pedestalEA
E.27Remove 10" round pedestal set in concreteEA
E.28Change out 2' x 3' pedestalEA
E.29Change out 2' x 3' pedestal set in concreteEA
E.30Change out underground junction boxEA
E.31Change out underground junction box set in concreteEA
E.32Change out 10" round pedestalEA
E.33Change out 10" round pedestal set in concreteEA
E.34Install Pull StringEA
EElectric ConduitsGRU Furnish
F.11.5'' HDPE ConduitLF
F.22'' HDPE ConduitLF
F.32.5'' HDPE ConduitLF
F.43'' HDPE ConduitLF
F.54'' HDPE ConduitLF
F.66'' HDPE ConduitLF
F.72" HDPE Parallel ConduitsLF
F.82.5" HDPE Parallel ConduitsLF
F.93" HDPE Parallel ConduitsLF
F.104" HDPE Parallel ConduitsLF
FAdditional PricingContractor Furnish
G.1Premium Work HoursPer HR
G.2Mobilization – HDD (<$1,000 Work Order)LS
G.3Emergency MobilizationLS
HDPE Adapters
G.44" HDPE MJ AdapterEA
G.56" HDPE MJ AdapterEA
G.68" HDPE MJ AdapterEA
G.710" HDPE MJ AdapterEA
G.812" HDPE MJ AdapterEA
G.916'' HDPE MJ AdapterEA
Fusing of Pipe for Customers per each
G.104'' PipeEA
G.116'' PipeEA
G.128'' PipeEA
G.1310'' PipeEA
G.1412'' PipeEA
G.1516'' PipeEA
Hydrostatic and Leakage Testing
G.16Testing for 2"-4" PipeEA
G.17Testing for 6" - 8" PipeEA
G.18Testing for 10"-12" PipeEA
G.19Testing for 16'' PipeEA
Rock Removal
G.20Rock Removal for 2"-4" PipeLF
G.21Rock Removal for 6" - 8" PipeLF
G.22Rock Removal for 10"-12" PipeLF
G.23Rock Removal for 16'' PipeLF
Traffic Control
G.24Furnish FlagmanPer HR
G.25Furnish Single Lane Closure per FDOT Index 603LS
G.26Furnish Multilane Closure per FDOT Index 613LS