2025HDDPricingResponseForm.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Horizontal Directional Drilling
- Solicitation number
- 2025-103
- Issued by
- Alachua County, Glencoe CDP, Florida
About this file
The document is a comprehensive pricing response form for Gainesville Regional Utilities (GRU) for a Horizontal Directional Drilling (HDD) project in Florida. The Excel spreadsheet provides a detailed pricing matrix for various utility infrastructure installation services, covering water distribution, wastewater collection, gas mains, communication conduits, and electric conduits. The pricing form includes line items for different pipe diameters and materials such as HDPE, ductile iron, and PVC, ranging from 1" to 16" in size, with pricing requested for both GRU-furnished and contractor-furnished components. The form also includes additional pricing categories for premium work hours and mobilization.
The pricing response form offers a granular breakdown of unit prices for linear foot (LF) installations across multiple utility infrastructure types, with specific line items for carrier pipes, casing pipes, and various conduit installations. Additional pricing elements include installation and removal of pedestals, junction boxes, and other infrastructure components, with prices requested on a per-unit or per-hour basis. The document appears to be part of a competitive bidding process for HDD services, with vendors expected to provide detailed pricing for precise utility infrastructure installation methods that minimize surface disruption and meet environmental and regulatory standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Horizontal_Directional_Drilling_(Addendum_#2_Revision).pdf | ||
| Horizontal_Directional_Drilling.pdf | ||
| Pricing_Form_Horizontal_Directional_Drilling_FINAL.xlsx | XLSX spreadsheet | |
| Horizontal_Directional_Drilling_Tech..docx | DOCX document | |
| Contract_Sample_Document.pdf | ||
| 2025_HorizontalDirectionalDrill_TechSpec_final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Bid Item Bid Item Description Unit Unit Price
| A | Water Distribution | GRU Furnish | Contractor Furnish | |
| Carrier Pipes | ||||
| A.1 | 2" CTS Blue or Purple, DR 9 | LF | ||
| A.2 | 4" DI Pipe | LF | ||
| A.3 | 6" DI Pipe | LF | ||
| A.4 | 8" DI Pipe | LF | ||
| A.6 | 12" DI Pipe | LF | ||
| A.7 | 16'' DI Pipe | LF | ||
| A.8 | 4" HDPE, DR 11 | LF | ||
| A.9 | 6" HDPE, DR 11 | LF | ||
| A.10 | 8" HDPE, DR 11 | LF | ||
| A.11 | 12" HDPE, DR 11 | LF | ||
| A.12 | 16'' HDPE, DR 11 | LF | ||
| Casing Pipes | ||||
| A.13 | 2" PE Tubing Casing, DR 13.5 | LF | ||
| A.14 | 4" PE Tubing Casing, DR 13.5 | LF | ||
| A.15 | 6'' PE Tubing Casing, DR 13.5 | LF | ||
| B | Wastewater Collection - Force Mains | GRU Furnish | Contractor Furnish | |
| B.1 | 2" HDPE (IPS), DR 11 | LF | ||
| B.1 | 4" HDPE, DR 11 | LF | ||
| B.2 | 6" HDPE, DR 11 | LF | ||
| B.3 | 8" HDPE, DR 11 | LF | ||
| B.5 | 12" HDPE, DR 11 | LF | ||
| B.6 | 16'' HDPE, DR 11 | LF | ||
| D | Gas Mains | GRU Furnish | ||
| D.1 | 2" and Smaller HDPE Carrier/Casing | LF | ||
| D.2 | 3" HDPE SDR 17 Carrier/Casing | LF | ||
| D.3 | 4" HDPE SDR 17 Carrier/Casing | LF | ||
| D.4 | 6" HDPE SDR 17 Carrier/Casing | LF | ||
| D.5 | 8" HDPE SDR 17 Carrier/Casing | LF | ||
| D.6 | 10" HDPE SDR 17 Carrier/Casing | LF | ||
| E | Communication Conduits | GRU Furnish | ||
| E.1 | 1.5" HDPE Single Conduit | LF | ||
| E.2 | 2" HDPE Single Conduit | LF | ||
| E.3 | 2.5" HDPE Single Conduit | LF | ||
| E.4 | 3" HDPE Single Conduit | LF | ||
| E.5 | 4" HDPE Single Conduit | LF | ||
| E.6 | 1" PVC Conduit | LF | ||
| E.7 | 1.5" PVC Conduit | LF | ||
| E.8 | 2" PVC Conduit | LF | ||
| E.9 | 2.5" PVC Conduit | LF | ||
| E.10 | 3" PVC Conduit | LF | ||
| E.11 | 4" PVC Conduit | LF | ||
| E.12 | 2" HDPE Parallel Conduits | LF | ||
| E.13 | 2.5" HDPE Parallel Conduits | LF | ||
| E.14 | 3" HDPE Parallel Conduits | LF | ||
| E.15 | 4" HDPE Parallel Conduits | LF | ||
| E.16 | Set 2' x 3' pedestal | EA | ||
| E.17 | Set 2' x 3' pedestal in concrete | EA | ||
| E.18 | Set underground junction box | EA | ||
| E.19 | Set underground junction box in concrete | EA | ||
| E.20 | Set 10" round pedestal | EA | ||
| E.21 | Set 10" round pedestal in concrete | EA | ||
| E.22 | Remove 2' x 3' pedestal | EA | ||
| E.23 | Remove 2' x 3' pedestal set in concrete | EA | ||
| E.24 | Remove underground junction box | EA | ||
| E.25 | Remove underground junction box set in concrete | EA | ||
| E.26 | Remove 10" round pedestal | EA | ||
| E.27 | Remove 10" round pedestal set in concrete | EA | ||
| E.28 | Change out 2' x 3' pedestal | EA | ||
| E.29 | Change out 2' x 3' pedestal set in concrete | EA | ||
| E.30 | Change out underground junction box | EA | ||
| E.31 | Change out underground junction box set in concrete | EA | ||
| E.32 | Change out 10" round pedestal | EA | ||
| E.33 | Change out 10" round pedestal set in concrete | EA | ||
| E.34 | Install Pull String | EA | ||
| E | Electric Conduits | GRU Furnish | ||
| F.1 | 1.5'' HDPE Conduit | LF | ||
| F.2 | 2'' HDPE Conduit | LF | ||
| F.3 | 2.5'' HDPE Conduit | LF | ||
| F.4 | 3'' HDPE Conduit | LF | ||
| F.5 | 4'' HDPE Conduit | LF | ||
| F.6 | 6'' HDPE Conduit | LF | ||
| F.7 | 2" HDPE Parallel Conduits | LF | ||
| F.8 | 2.5" HDPE Parallel Conduits | LF | ||
| F.9 | 3" HDPE Parallel Conduits | LF | ||
| F.10 | 4" HDPE Parallel Conduits | LF | ||
| F | Additional Pricing | Contractor Furnish | ||
| G.1 | Premium Work Hours | Per HR | ||
| G.2 | Mobilization – HDD (<$1,000 Work Order) | LS | ||
| G.3 | Emergency Mobilization | LS | ||
| HDPE Adapters | ||||
| G.4 | 4" HDPE MJ Adapter | EA | ||
| G.5 | 6" HDPE MJ Adapter | EA | ||
| G.6 | 8" HDPE MJ Adapter | EA | ||
| G.7 | 10" HDPE MJ Adapter | EA | ||
| G.8 | 12" HDPE MJ Adapter | EA | ||
| G.9 | 16'' HDPE MJ Adapter | EA | ||
| Fusing of Pipe for Customers per each | ||||
| G.10 | 4'' Pipe | EA | ||
| G.11 | 6'' Pipe | EA | ||
| G.12 | 8'' Pipe | EA | ||
| G.13 | 10'' Pipe | EA | ||
| G.14 | 12'' Pipe | EA | ||
| G.15 | 16'' Pipe | EA | ||
| Hydrostatic and Leakage Testing | ||||
| G.16 | Testing for 2"-4" Pipe | EA | ||
| G.17 | Testing for 6" - 8" Pipe | EA | ||
| G.18 | Testing for 10"-12" Pipe | EA | ||
| G.19 | Testing for 16'' Pipe | EA | ||
| Rock Removal | ||||
| G.20 | Rock Removal for 2"-4" Pipe | LF | ||
| G.21 | Rock Removal for 6" - 8" Pipe | LF | ||
| G.22 | Rock Removal for 10"-12" Pipe | LF | ||
| G.23 | Rock Removal for 16'' Pipe | LF | ||
| Traffic Control | ||||
| G.24 | Furnish Flagman | Per HR | ||
| G.25 | Furnish Single Lane Closure per FDOT Index 603 | LS | ||
| G.26 | Furnish Multilane Closure per FDOT Index 613 | LS |
File details come from the government source that posted it. Updated .