Pricing Evaluation Workbook - FA465426R0006.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- FA465426R0006
About this file
This is a Pricing Evaluation Workbook for solicitation FA465426R0006, a Request for Proposal for pavement repair, sustainment, and construction services at Grissom Air Reserve Base in Indiana. The solicitation is set-aside for small business concerns and intends to award a single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract. Offers are due by 10:00 AM local time on June 30, 2026, with a site visit scheduled for June 10 at 10:00 AM and questions due by June 17 at 10:00 AM.
The pricing workbook contains unit price line items across five fiscal year periods (2026-2027 through 2030-2031) for 24 line-item numbers covering various pavement and concrete repair services, including crack repair (PCC silicone and asphalt concrete), spall repair, full-depth patches, pothole repair, sidewalk replacement and removal, curb installation and removal, temporary and permanent markings, traffic signs, bollards, monuments, maintenance of traffic, mobilization, and bonding. Offerors must input proposed unit costs in designated yellow cells for each line item, with the Government evaluating pricing based on estimated quantities provided for each year. The estimated quantities vary significantly by year and service type, ranging from zero quantities for certain services in specific years to quantities exceeding 3,000 units for some items. Bonding costs are fixed-price estimates regardless of actual contractor pricing. The Point of Contact is Cedric Roberts at cedric.roberts@us.af.mil or 765-688-2818, and the F.O.B. point is destination at Grissom ARB, IN 46971-5000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA465426R0006 Site Visit Sign in Sheet.xlsx | XLSX spreadsheet | |
| Construction Site Visit Agenda - Sustain Pavement IDIQ.docx | DOCX document | |
| FA465426R0006 - Questions and Answers.docx | DOCX document | |
| Service Contract Act WD 2015-4809 Revision No 33.txt | TXT text file | |
| Grissom ARB Environmental Requirements.docx | DOCX document | |
| Financial Institution Reference Sheet.docx | DOCX document | |
| Grissom ARB Bio Identification and Notification.pdf | ||
| Grissom Air Reserve Base Standards.pdf | ||
| Davis-Bacon Act WD IN20260006 Modification 1.pdf | ||
| Grissom DBIDS - How to Request Base Access.pdf | ||
| Solicitation - FA465426R0006.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIC YEAR - 2026
Offerors shall input their proposed unit prices into the designated yellow cells. The Government will evaluate pricing for this solicitation based on the estimated quantities provided in Column D. Please note that these quantities are provided strictly for evaluation purposes. They do not constitute a guarantee of future work or order volumes, and actual ordered quantities may vary.
BASIC YEAR 2026 - 2027
CLN# COLOR UNITS EST QTY UNIT COST TOTAL COST
| 0001 | CRACK REPAIR - PCC SILICONE | LF | 0 | $0.00 |
| 0002 | CRACK REPAIR - AC | LF | 0 | $0.00 |
| 0003 | SPALL REPAIR - PCC 5" | SF | 0 | $0.00 |
| 0004 | FULL DEPTH PATCH - AC - 6" | SF | 0 | $0.00 |
| 0005 | FULL DEPTH PATCH - PCC- 9" | SF | 0 | $0.00 |
| 0006 | POTHOLE REPAIR - AC - 4" | SF | 0 | $0.00 |
| 0007 | SIDEWALK REPLACE - 4" | SF | 950 | $0.00 |
| 0008 | CONCRETE CURB | LF | 0 | $0.00 |
| 0009 | SIDEWALK RAMP - CORNER | EA | 0 | $0.00 |
| 0010 | SIDEWALK RAMP - STRAIGHT | EA | 2 | $0.00 |
| 0011 | INDOT #53 STONE, COMPACTED - 6" | SF | 1000 | $0.00 |
| 0012 | TOPSOIL - 2" | SF | 434 | $0.00 |
| 0013 | TEMPORARY MARKING, WHITE - 4" | LF | 300 | $0.00 |
| 0014 | TEMPORARY MARKING, YELLOW - 4" | LF | 0 | $0.00 |
| 0015 | TEMPORARY MARKING, BLUE - 4" | LF | 0 | $0.00 |
| 0016 | TRAFFIC SIGN, WITH POST | EA | 0 | $0.00 |
| 0017 | MONUMENT | EA | 0 | $0.00 |
| 0018 | BOLLARD | EA | 0 | $0.00 |
| 0019 | SIDEWALK, REMOVE | SF | 500 | $0.00 |
| 0020 | CURB, REMOVE | LF | 40 | $0.00 |
| 0021 | LINE, REMOVE | LF | 128 | $0.00 |
| 0022 | MAINTENANCE OF TRAFFIC | LS | 1 | $0.00 |
| 0023 | MOBILIZATION | EA | 1 | $0.00 |
| 0024 | BOND (Estimate. Price will be FFP [NOT AT COST] regardless of contractor's actual bond price) | EA | 1 | $0.00 |
Total Basic Year Proposal Price $0
&"Arial,Bold"&12Bid Schedule&"Arial,Regular" Sustain Base Pavements Project: CTGB 262003
Option Period 1
Offerors shall input their proposed unit prices into the designated yellow cells. The Government will evaluate pricing for this solicitation based on the estimated quantities provided in Column D. Please note that these quantities are provided strictly for evaluation purposes. They do not constitute a guarantee of future work or order volumes, and actual ordered quantities may vary.
BASIC YEAR 2027 - 2028
CLN# COLOR UNITS EST QTY UNIT COST TOTAL COST
| 0001 | CRACK REPAIR - PCC SILICONE | LF | 0 | $0 |
| 0002 | CRACK REPAIR - AC | LF | 0 | $0 |
| 0003 | SPALL REPAIR - PCC 5" | SF | 0 | $0 |
| 0004 | FULL DEPTH PATCH - AC - 6" | SF | 2814 | $0 |
| 0005 | FULL DEPTH PATCH - PCC- 9" | SF | 0 | $0 |
| 0006 | POTHOLE REPAIR - AC - 4" | SF | 0 | $0 |
| 0007 | SIDEWALK REPLACE - 4" | SF | 2168.25 | $0 |
| 0008 | CONCRETE CURB | LF | 45 | $0 |
| 0009 | SIDEWALK RAMP - CORNER | EA | 0 | $0 |
| 0010 | SIDEWALK RAMP - STRAIGHT | EA | 3 | $0 |
| 0011 | INDOT #53 STONE, COMPACTED - 6" | SF | 2814 | $0 |
| 0012 | TOPSOIL - 2" | SF | 1500 | $0 |
| 0013 | TEMPORARY MARKING, WHITE - 4" | LF | 181.5 | $0 |
| 0014 | TEMPORARY MARKING, YELLOW - 4" | LF | 0 | $0 |
| 0015 | TEMPORARY MARKING, BLUE - 4" | LF | 0 | $0 |
| 0016 | TRAFFIC SIGN, WITH POST | EA | 3 | $0 |
| 0017 | MONUMENT | EA | 0 | $0 |
| 0018 | BOLLARD | EA | 0 | $0 |
| 0019 | SIDEWALK, REMOVE | SF | 2717.25 | $0 |
| 0020 | CURB, REMOVE | LF | 108 | $0 |
| 0021 | LINE, REMOVE | LF | 726 | $0 |
| 0022 | MAINTENANCE OF TRAFFIC | LS | 1 | $0 |
| 0023 | MOBILIZATION | EA | 1 | $0 |
| 0024 | BOND (Estimate. Price will be FFP [NOT AT COST] regardless of contractor's actual bond price) | EA | 1 | $0 |
Total Option Period 1 Proposal Price $0
Project: CTGB 262003
Option Period 2
Offerors shall input their proposed unit prices into the designated yellow cells. The Government will evaluate pricing for this solicitation based on the estimated quantities provided in Column D. Please note that these quantities are provided strictly for evaluation purposes. They do not constitute a guarantee of future work or order volumes, and actual ordered quantities may vary.
BASIC YEAR 2028 - 2029
CLN# COLOR UNITS EST QTY UNIT COST TOTAL COST
| 0001 | CRACK REPAIR - PCC SILICONE | LF | 1250 | $0 | |
| 0002 | CRACK REPAIR - AC | LF | 0 | $0 | |
| 0003 | SPALL REPAIR - PCC 5" | SF | 1250 | $0 | |
| 0004 | FULL DEPTH PATCH - AC - 6" | SF | $0 | ||
| 0005 | FULL DEPTH PATCH - PCC- 9" | SF | 0 | $0 | |
| 0006 | POTHOLE REPAIR - AC - 4" | SF | 0 | $0 | |
| 0007 | SIDEWALK REPLACE - 4" | SF | 0 | $0 | |
| 0008 | CONCRETE CURB | LF | 0 | $0 | |
| 0009 | SIDEWALK RAMP - CORNER | EA | 0 | $0 | |
| 0010 | SIDEWALK RAMP - STRAIGHT | EA | 0 | $0 | |
| 0011 | INDOT #53 STONE, COMPACTED - 6" | SF | 0 | $0 | |
| 0012 | TOPSOIL - 2" | SF | 0 | $0 | |
| 0013 | TEMPORARY MARKING, WHITE - 4" | LF | 0 | $0 | |
| 0014 | TEMPORARY MARKING, YELLOW - 4" | LF | 0 | $0 | |
| 0015 | TEMPORARY MARKING, BLUE - 4" | LF | 0 | $0 | |
| 0016 | TRAFFIC SIGN, WITH POST | EA | 0 | $0 | |
| 0017 | MONUMENT | EA | 0 | $0 | |
| 0018 | BOLLARD | EA | 0 | $0 | |
| 0019 | SIDEWALK, REMOVE | SF | 0 | $0 | |
| 0020 | CURB, REMOVE | LF | 0 | $0 | |
| 0021 | LINE, REMOVE | LF | 0 | $0 | |
| 0022 | MAINTENANCE OF TRAFFIC | LS | 1 | $ - 0 | $0 |
| 0023 | MOBILIZATION | EA | 1 | $ - 0 | $0 |
| 0024 | BOND (Estimate. Price will be FFP [NOT AT COST] regardless of contractor's actual bond price) | EA | 1 | $ - 0 | $0 |
Total Option Period 2 Proposal Price $0
Project: CTGB 262003
Option Period 3
Offerors shall input their proposed unit prices into the designated yellow cells. The Government will evaluate pricing for this solicitation based on the estimated quantities provided in Column D. Please note that these quantities are provided strictly for evaluation purposes. They do not constitute a guarantee of future work or order volumes, and actual ordered quantities may vary.
BASIC YEAR 2029 - 2030
CLN# COLOR UNITS EST QTY UNIT COST TOTAL COST
| 0001 | CRACK REPAIR - PCC SILICONE | LF | 0 | $0 |
| 0002 | CRACK REPAIR - AC | LF | 0 | $0 |
| 0003 | SPALL REPAIR - PCC 5" | SF | 0 | $0 |
| 0004 | FULL DEPTH PATCH - AC - 6" | SF | 0 | $0 |
| 0005 | FULL DEPTH PATCH - PCC- 9" | SF | 1500 | $0 |
| 0006 | POTHOLE REPAIR - AC - 4" | SF | 0 | $0 |
| 0007 | SIDEWALK REPLACE - 4" | SF | 0 | $0 |
| 0008 | CONCRETE CURB | LF | 400 | $0 |
| 0009 | SIDEWALK RAMP - CORNER | EA | 0 | $0 |
| 0010 | SIDEWALK RAMP - STRAIGHT | EA | 0 | $0 |
| 0011 | INDOT #53 STONE, COMPACTED - 6" | SF | 1500 | $0 |
| 0012 | TOPSOIL - 2" | SF | 0 | $0 |
| 0013 | TEMPORARY MARKING, WHITE - 4" | LF | 500 | $0 |
| 0014 | TEMPORARY MARKING, YELLOW - 4" | LF | 0 | $0 |
| 0015 | TEMPORARY MARKING, BLUE - 4" | LF | 0 | $0 |
| 0016 | TRAFFIC SIGN, WITH POST | EA | 4 | $0 |
| 0017 | MONUMENT | EA | 5 | $0 |
| 0018 | BOLLARD | EA | 0 | $0 |
| 0019 | SIDEWALK, REMOVE | SF | 0 | $0 |
| 0020 | CURB, REMOVE | LF | 0 | $0 |
| 0021 | LINE, REMOVE | LF | 0 | $0 |
| 0022 | MAINTENANCE OF TRAFFIC | LS | 1 | $0 |
| 0023 | MOBILIZATION | EA | 1 | $0 |
| 0024 | BOND (Estimate. Price will be FFP [NOT AT COST] regardless of contractor's actual bond price) | EA | 1 | $0 |
Total Option Period 3 Proposal Price $0
Project: CTGB 262003
Option Period 4
Offerors shall input their proposed unit prices into the designated yellow cells. The Government will evaluate pricing for this solicitation based on the estimated quantities provided in Column D. Please note that these quantities are provided strictly for evaluation purposes. They do not constitute a guarantee of future work or order volumes, and actual ordered quantities may vary.
| BASIC YEAR | FY 2030 |
| 2030 - 2031 |
CLN# COLOR UNITS EST QTY UNIT COST TOTAL COST
| 0001 | CRACK REPAIR - PCC SILICONE | LF | 0 | $0 |
| 0002 | CRACK REPAIR - AC | LF | 0 | $0 |
| 0003 | SPALL REPAIR - PCC 5" | SF | 0 | $0 |
| 0004 | FULL DEPTH PATCH - AC - 6" | SF | 2500 | $0 |
| 0005 | FULL DEPTH PATCH - PCC- 9" | SF | 0 | $0 |
| 0006 | POTHOLE REPAIR - AC - 4" | SF | 0 | $0 |
| 0007 | SIDEWALK REPLACE - 4" | SF | 500 | $0 |
| 0008 | CONCRETE CURB | LF | 600 | $0 |
| 0009 | SIDEWALK RAMP - CORNER | EA | 0 | $0 |
| 0010 | SIDEWALK RAMP - STRAIGHT | EA | 2 | $0 |
| 0011 | INDOT #53 STONE, COMPACTED - 6" | SF | 3000 | $0 |
| 0012 | TOPSOIL - 2" | SF | 500 | $0 |
| 0013 | TEMPORARY MARKING, WHITE - 4" | LF | 1000 | $0 |
| 0014 | TEMPORARY MARKING, YELLOW - 4" | LF | 0 | $0 |
| 0015 | TEMPORARY MARKING, BLUE - 4" | LF | 0 | $0 |
| 0016 | TRAFFIC SIGN, WITH POST | EA | 5 | $0 |
| 0017 | MONUMENT | EA | 10 | $0 |
| 0018 | BOLLARD | EA | 4 | $0 |
| 0019 | SIDEWALK, REMOVE | SF | 100 | $0 |
| 0020 | CURB, REMOVE | LF | 20 | $0 |
| 0021 | LINE, REMOVE | LF | 0 | $0 |
| 0022 | MAINTENANCE OF TRAFFIC | LS | 1 | $0 |
| 0023 | MOBILIZATION | EA | 1 | $0 |
| 0024 | BOND (Estimate. Price will be FFP [NOT AT COST] regardless of contractor's actual bond price) | EA | 1 | $0 |
Total Option Period 4 Proposal Price $0
Project: CTGB 262003
File details come from the government source that posted it. Updated .