Pricing.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Modular Installation Services
- Solicitation number
- 2023-RFQ-0233
- Issued by
- Sacramento County, San Francisco City, California
About this file
The file is a pricing spreadsheet for Modular Installation Services in California, detailing hourly service rates and equipment costs for a moving and installation project. The document provides a comprehensive rate card for various installation services, including van and lead installer rates (both standard and overtime), additional installer rates, and specific pricing for equipment and IT-related disconnection and reconnection services. The pricing structure covers single and multiple van scenarios, with rates for different installer levels and equipment usage.
The pricing spreadsheet shows all listed rates at $0.00, which could indicate a placeholder document or a requirement for detailed pricing to be submitted separately. The document includes rates for packing materials like cartons, safe jacks, forklifts, plastic tubs, and rolling book carts, as well as specific pricing for IT equipment disconnection and reconnection. Additionally, the spreadsheet includes prevailing wage markup percentages for different installer categories (Master Installer, Installer, Installer I, and Installer II), all currently set at 0%, suggesting these will be negotiated or defined in subsequent contract documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Modular_Installation_Services_(Addendum_#1_Revision).pdf | ||
| Specifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix I
| Service Rates (Hourly) | |
| One Van and Lead Installer/Driver | 0.00 / Hr |
| One Van and Lead Installer/Driver Overtime | 0.00 / Hr |
| Each Additional Install I | 0.00 / Hr |
| Each Additional Installer I Overtime | 0.00 / Hr |
| Lead Installer Only (Van not Required) | 0.00 / Hr |
| Lead Installer Only (Van not Required) Overtime | 0.00 / Hr |
| Packing Materials | |
| 1.5 Cu Ft. Cartons (Non-Reusable) (Each) | 0.00 / ea |
| 3.0 Cu Ft. Cartons (Non-Reusable) (Each) | 0.00 / ea |
| Safe Jacks (Per day) | 0.00 / day |
| Forklifts (Per day) | 0.00 / day |
| 2.73 Cu Ft. Plastic Tubs (Each) | 0.00 / ea |
| Rolling Book Carts (Each) | 0.00 / ea |
| IT Equipment Disconnect, Move, Reconnect (Each) | 0.00 / ea |
| PCs or Laptops w/ Docking Stations | 0.00 / ea |
| Printers | 0.00 / ea |
| Telephones | 0.00 / ea |
| Surge Protectors | 0.00 / ea |
| Peripherals (Moniters, Faxes, Shredders, Etc.) | 0.00 / ea |
| Prevailing Wage Mark-up (Percentage) | |
| Master Installer | 0% |
| Installer | 0% |
| Installer I | 0% |
| Installer II | 0% |
File details come from the government source that posted it. Updated .