Price Sheet - Attachment 3.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- T. S. State of Michigan FY20 Dry Dock
- Solicitation number
- 69727620Q000024
About this file
This combined synopsis and solicitation requests quotations for drydock services for the T.S. State of Michigan. The Maritime Administration seeks a firm fixed price contract for general services, drydock work items, repair items, cost items, and an optional drydock guidance drawing. Prospective offerors must visit the work site by July 13th and submit all questions by July 15th. Quotes in the required price sheet format are due by July 27th and the contract will be awarded on a lowest price technically acceptable basis. The drydock facility must be located in the Great Lakes region as the T.S. State of Michigan is restricted to these waters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| STATE OF MICHIGAN FY20 DRYDOCK | ||||||
| PRICE SHEET | ||||||
| CLIN | TITLE/DESCRIPTION | LABOR | MATERIAL | TOTAL | ||
| Man Hour or QTY | Rate | Ext. Amt | ||||
| CLIN 0001: SECTION 100 – GENERAL SERVICES REQUIREMENT | ||||||
| 101 | OFFICE AND ADMINISTRATIVE SERVICES | |||||
| 102 | SHORE POWER SERVICES | |||||
| 103 | WHARFAGE AND LINEHANDLERS | |||||
| 104 | POTABLE WATER | |||||
| 105 | BILGES AND DRAIN WELLS | |||||
| 106 | GARBAGE AND TRASH REMOVAL | |||||
| 107 | PROTECTIVE FLOOR COVERING | |||||
| 108 | SECURITY/WATCHMAN | |||||
| 109 | GAS FREE INSPECTIONS AND CERTIFICATES | |||||
| 110 | FIRE PROTECTION | |||||
| 111 | PORTABLE TOILETS/TEMPORARY FACILITIES | |||||
| 112 | COOLING WATER | |||||
| 113 | TEMPORARY LIGHTING | |||||
| 114 | CRANE SERVICE | |||||
| 115 | STAGING REQUIREMENT | |||||
| 116 | OFF LOAD OF LIQUIDS AND STORAGE |
| SUB TOTAL SECTION - 100 | $ - | $ - | $ - | |
| CLIN 0002: SECTION 200 - DRYDOCK WORK ITEMS | ||||
| 201 | DRYDOCKING AND UNDOCKING OF THE VESSEL | |||
| 202 | DOCK TRIALS | |||
| 203 | HULL PREPARATION AND COATING | |||
| 204 | RENEW ZINC ANODES | |||
| 205 | RUDDER AND STERN FRAME EXAMINATION | |||
| 206 | PROPELLER INSPECTION, MAINTENANCE AND REPAIRS (ABS) | |||
| 207 | PROPELLER SHAFT WEAR DOWN READINGS | |||
| 208 | SHAFT SEAL & LINER REPLACEMENT, TAILSHAFT INSPECTION & LUBE OIL EXCHANGE | |||
| 209 | TANK CLEANING AND INSPECTIONS | |||
| 210 | SEA VALVES: INSPECTION AND REPAIR, (ABS & USCG) | |||
| 211 | ANCHOR CHAIN AND CHAIN LOCKER INSPECTION | |||
| 212 | BOW THRUSTER EXAMINATION AND MAINTENANCE (ABS) | |||
| 213 | ULTRASONIC/AUDIO HULL GAUGING | |||
| 214 | WASTER PIECE: EXAMINATION | |||
| 215 | PRESSURE VESSEL INSPECTIONS | |||
| 216 | THRUST BEARING(S) INSPECTION/RENEWAL | |||
| 217 | RESCUE BOAT: FALL REPLACEMENT |
| SUB TOTAL SECTION - 200 | $ - | $ - | $ - | |
| CLIN 0003: SECTION 300 - REPAIR ITEMS | ||||
| 301 | TOP END OVERHAUL #1 MAIN GENERATOR | |||
| 302 | TOP END OVERHAUL #2 MAIN GENERATOR | |||
| 303 | TOP END OVERHAUL #3 MAIN GENERATOR | |||
| 304 | INSTALL EMERGENCY BILGE SYSTEM | |||
| 305 | BLAST AND COAT BALLAST TANKS | |||
| 306 | REFIRBISH FIRE DAMPERS |
| SUB TOTAL SECTION - 300 | $ - | $ - | $ - | |
| CLIN 0004: SECTION 400 - COST ITEMS | ||||
| 401 | SUPPLEMENTAL WORK: MANHOURS LABOR | |||
| 402 | SUPPLEMENTAL WORK: MATERIAL | |||
| 403 | DRY DOCK AND WET BERTH DAYS |
| SUB TOTAL SECTION - 400 | $ - | $ - | $ - | |
| OPTION CLIN 0005: SECTION 500 - OPTIONAL ITEMS | ||||
| 501 | DRY DOCK GUIDANCE DRAWING |
| Contract Optional Items: SUB TOTAL SECTION - 500 | $ - | $ - | $ - |
| Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400 | $ - | $ - | $ - |
| Total Contract Base Items | $ - 0 | |
| Grand Total | $ - 0 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .