This combined synopsis and solicitation requests quotations for drydock services for the T.S. State of Michigan. The Maritime Administration seeks a firm fixed price contract for general services, drydock work items, repair items, cost items, and an optional drydock guidance drawing. Prospective offerors must visit the work site by July 13th and submit all questions by July 15th. Quotes in the required price sheet format are due by July 27th and the contract will be awarded on a lowest price technically acceptable basis. The drydock facility must be located in the Great Lakes region as the T.S. State of Michigan is restricted to these waters.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

STATE OF MICHIGAN FY20 DRYDOCK
PRICE SHEET
CLINTITLE/DESCRIPTIONLABORMATERIALTOTAL
Man Hour or QTYRateExt. Amt
CLIN 0001: SECTION 100 – GENERAL SERVICES REQUIREMENT
101OFFICE AND ADMINISTRATIVE SERVICES
102SHORE POWER SERVICES
103WHARFAGE AND LINEHANDLERS
104POTABLE WATER
105BILGES AND DRAIN WELLS
106GARBAGE AND TRASH REMOVAL
107PROTECTIVE FLOOR COVERING
108SECURITY/WATCHMAN
109GAS FREE INSPECTIONS AND CERTIFICATES
110FIRE PROTECTION
111PORTABLE TOILETS/TEMPORARY FACILITIES
112COOLING WATER
113TEMPORARY LIGHTING
114CRANE SERVICE
115STAGING REQUIREMENT
116OFF LOAD OF LIQUIDS AND STORAGE
SUB TOTAL SECTION - 100$ -$ -$ -
CLIN 0002: SECTION 200 - DRYDOCK WORK ITEMS
201DRYDOCKING AND UNDOCKING OF THE VESSEL
202DOCK TRIALS
203HULL PREPARATION AND COATING
204RENEW ZINC ANODES
205RUDDER AND STERN FRAME EXAMINATION
206PROPELLER INSPECTION, MAINTENANCE AND REPAIRS (ABS)
207PROPELLER SHAFT WEAR DOWN READINGS
208SHAFT SEAL & LINER REPLACEMENT, TAILSHAFT INSPECTION & LUBE OIL EXCHANGE
209TANK CLEANING AND INSPECTIONS
210SEA VALVES: INSPECTION AND REPAIR, (ABS & USCG)
211ANCHOR CHAIN AND CHAIN LOCKER INSPECTION
212BOW THRUSTER EXAMINATION AND MAINTENANCE (ABS)
213ULTRASONIC/AUDIO HULL GAUGING
214WASTER PIECE: EXAMINATION
215PRESSURE VESSEL INSPECTIONS
216THRUST BEARING(S) INSPECTION/RENEWAL
217RESCUE BOAT: FALL REPLACEMENT
SUB TOTAL SECTION - 200$ -$ -$ -
CLIN 0003: SECTION 300 - REPAIR ITEMS
301TOP END OVERHAUL #1 MAIN GENERATOR
302TOP END OVERHAUL #2 MAIN GENERATOR
303TOP END OVERHAUL #3 MAIN GENERATOR
304INSTALL EMERGENCY BILGE SYSTEM
305BLAST AND COAT BALLAST TANKS
306REFIRBISH FIRE DAMPERS
SUB TOTAL SECTION - 300$ -$ -$ -
CLIN 0004: SECTION 400 - COST ITEMS
401SUPPLEMENTAL WORK: MANHOURS LABOR
402SUPPLEMENTAL WORK: MATERIAL
403DRY DOCK AND WET BERTH DAYS
SUB TOTAL SECTION - 400$ -$ -$ -
OPTION CLIN 0005: SECTION 500 - OPTIONAL ITEMS
501DRY DOCK GUIDANCE DRAWING
Contract Optional Items: SUB TOTAL SECTION - 500$ -$ -$ -
Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400$ -$ -$ -
Total Contract Base Items$ - 0
Grand Total$ - 0