Price_Sheet-0552FAC-RFP-MOC_Grease_Trap_Service_Repair_Maintain_Install_Clean.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 0552FAC-RFP-MOC
- Issued by
- Hillsborough County, Florida
About this file
The document is a Price Sheet for RFP 0552FAC-MOC issued by Hillsborough County Public Schools (HCPS) in Florida, soliciting proposals for comprehensive grease trap services from general or plumbing contractors. The RFP covers maintenance, repairs, replacement, cleaning, and inspection of grease traps, including pipe, concrete, electrical, mechanical, plumbing, and structural work. HCPS plans to award the contract to three primary vendors, with the highest-ranked proposer in each of three geographic areas (West, Central, and East) potentially receiving the most work. The pre-proposal meeting is scheduled for May 8, 2025, at 9:00 AM, with technical questions due by May 15, 2025, and final proposals due on May 29, 2025, at 12:00 PM. The initial contract term will begin upon board approval and automatically renew for up to four additional one-year periods, contingent on budget appropriations and mutual agreement.
The pricing sheet includes 28 line items covering standard and overtime labor rates, materials replacement costs, mobilization fees, and specialty service charges, with a cost-plus markup not exceeding 15% for materials, specialty supplies, and engineered drawings. The solicitation encourages small business participation through the Small Business Encouragement Program (SBEP), offering additional points to proposers using certified small business subcontractors. Projects under $10,000 will be handled directly under the agreement, while those exceeding $200,000 will require payment and performance bonds as mandated by Florida Statute 255.05. Proposers must submit electronic proposals through VendorLink, with pricing inclusive of all delivery, trip, fuel surcharges, and service call charges. Vendors are required to complete a W-9 Substitute Vendor Payment Profile Form and may voluntarily self-identify as a minority, service-disabled veteran, or other certified business enterprise.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| 0552FAC-RFP-MOC Grease Trap Service Repair Maintain Install Clean | ||||
| Vendor Name: | ||||
| Please complete the blue sections. No Hand Written Responses | ||||
| DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF | ||||
| Item | DESCRIPTION | Unit of Measure | Unit Cost | |
| 1 | Standard Labor Hours - hours on site MF-6:00am to 6:00pm | |||
| To include but not limited to, Drop pipe assembly replacement, Pipe/Valve replacement, Concrete Grease Trap/Inceptor, Polymer Grease Trap/Inceptor replacement installation labor and equipment | HR | |||
| 2 | Overtime Labor - hours on site MF-6:00pm to 6:00am | |||
| To include but not limited to, Drop pipe assembly replacement, Pipe/Valve replacement, Concrete Grease Trap/Inceptor, Polymer Grease Trap/Inceptor replacement installation labor and equipment | HR | |||
| 3 | Drop pipe assembly replacement materials-Cost Plus % not to exceed 15% | % | ||
| 4 | Concrete grease trap/interceptor - includes trap/interceptor, manholes/risers, piping. Cost Plus % not to exceed 15% | % | ||
| 5 | Polymer grease trap/interceptor - includes trap/interceptor, manholes/risers, piping. Cost Plus % not to exceed 15% | % | ||
| 6 | Polymer grease trap/interceptor demo and disposal | Per 100 GA of Capacity | ||
| 7 | Miscellanoeous services not described above |
Standard Labor - hours on site MF-6:00am to 6:00pm
| Miscellanoeous services not described above | HR | |
| 8 | Miscellanoeous services not described above |
Overtime Labor - hours on site MF-6:00pm to 6:00am
| Miscellanoeous services not described above | HR | ||
| 9 | Mobilization fee - applicable to projects with total itemized cost of less than $2000.00 - one per project | EA | |
| 10 | Confined space surcharge applicable to projects requiring enrty into trap/interceptor - one per project | EA | |
| 11 | Removal and Disposal of Grease Trap/Interceptor Contents | GA | |
| 12 | Documentation of trap/interceptor interior volume, pipe size/materials and relative invert elevations | EA | |
| 13 | Pipe penetration grouting -per product manufacturer's reccomendations | EA | |
| 14 | 24" diameter traffic rated cast iron manhole ring and cover replacement in paved area - labor and materials | EA | |
| 15 | 24" diameter traffic rated cast iron manhole ring and cover replacement in landscape area - labor and materials | EA | |
| 16 | 24" diameter manhole riser replacement. New risers to be precast concrete - labor and materials | VT FT | |
| 17 | Concrete patching - per product maufauturer's reccomendations | SQ FT | |
| 18 | Concrete floor overlay | CU FT | |
| 19 | Concrete lid replacement - including demo of existing lid and disposal of debris | CU FT | |
| 20 | Concrete grease trap/interceptor demo and disposal | Per 100 GA of Capacity | |
| 21 | Concrete pavement demo and disposal | CU FT | |
| 22 | Concrete Restoration | Cubic Yard | |
| 23 | Asphalt pavement demo and dsiposal | SQ FT | |
| 24 | Asphalt Restoration - including 12" limerock base | SQ FT | |
| 25 | Sod restoration includes labor, prep, any required top soil or fill and sod | SQ FT | |
| 26 | Markup on pre-approved specialty suppliesmaterials and services- Cost plus markup based on the vendor's cost, Cannot exceed 15% | % | |
| 27 | Engineered Drawings - Cost plus %-Cannot exceed 15% | % | |
| 28 | Pay for Performance Bond percent % | % |
File details come from the government source that posted it. Updated .