Price_Sheet-0552FAC-RFP-MOC_Grease_Trap_Service_Repair_Maintain_Install_Clean.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Grease Trap Service Repair Maintain Install Clean
Solicitation number
0552FAC-RFP-MOC
Issued by
Hillsborough County, Florida

About this file

This is a Price Sheet for a Hillsborough County Public Schools (HCPS) contract opportunity for grease trap services across district sites in Florida. The solicitation (0552FAC-RFP-MOC) seeks qualified general or plumbing contractors to provide comprehensive grease trap maintenance, repair, replacement, cleaning, and inspection services. The contract covers a wide range of tasks including pipe work, electrical, mechanical, plumbing, and structural component installations, with all associated labor, materials, delivery, and equipment. Projects exceeding $200,000 will require payment and performance bonds as mandated by Florida Statute 255.05.

The price sheet details 28 line items with various unit pricing structures, including standard and overtime labor rates, materials replacement costs, mobilization fees, and specialty service charges. Pricing includes cost-plus markup not to exceed 15% for materials, specialty supplies, and engineered drawings. Key pricing components cover standard labor hours (Monday-Friday, 6:00am-6:00pm), overtime labor, equipment replacement, disposal services, documentation, and restoration work such as concrete and asphalt repair. The pricing model allows for flexible service delivery with specific charges for different project scopes, from minor repairs to comprehensive grease trap system replacements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

0552FAC-RFP-MOC Grease Trap Service Repair Maintain Install Clean
Vendor Name:
Please complete the blue sections. No Hand Written Responses
DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF
ItemDESCRIPTIONUnit of MeasureUnit Cost
1Standard Labor Hours - hours on site MF-6:00am to 6:00pm
To include but not limited to, Drop pipe assembly replacement, Pipe/Valve replacement, Concrete Grease Trap/Inceptor, Polymer Grease Trap/Inceptor replacement installation labor and equipmentHR
2Overtime Labor - hours on site MF-6:00pm to 6:00am
To include but not limited to, Drop pipe assembly replacement, Pipe/Valve replacement, Concrete Grease Trap/Inceptor, Polymer Grease Trap/Inceptor replacement installation labor and equipmentHR
3Drop pipe assembly replacement materials-Cost Plus % not to exceed 15%%
4Concrete grease trap/interceptor - includes trap/interceptor, manholes/risers, piping. Cost Plus % not to exceed 15%%
5Polymer grease trap/interceptor - includes trap/interceptor, manholes/risers, piping. Cost Plus % not to exceed 15%%
6Polymer grease trap/interceptor demo and disposalPer 100 GA of Capacity
7Miscellanoeous services not described above

Standard Labor - hours on site MF-6:00am to 6:00pm

Miscellanoeous services not described aboveHR
8Miscellanoeous services not described above

Overtime Labor - hours on site MF-6:00pm to 6:00am

Miscellanoeous services not described aboveHR
9Mobilization fee - applicable to projects with total itemized cost of less than $2000.00 - one per projectEA
10Confined space surcharge applicable to projects requiring enrty into trap/interceptor - one per projectEA
11Removal and Disposal of Grease Trap/Interceptor ContentsGA
12Documentation of trap/interceptor interior volume, pipe size/materials and relative invert elevationsEA
13Pipe penetration grouting -per product manufacturer's reccomendationsEA
1424" diameter traffic rated cast iron manhole ring and cover replacement in paved area - labor and materialsEA
1524" diameter traffic rated cast iron manhole ring and cover replacement in landscape area - labor and materialsEA
1624" diameter manhole riser replacement. New risers to be precast concrete - labor and materialsVT FT
17Concrete patching - per product maufauturer's reccomendationsSQ FT
18Concrete floor overlayCU FT
19Concrete lid replacement - including demo of existing lid and disposal of debrisCU FT
20Concrete grease trap/interceptor demo and disposalPer 100 GA of Capacity
21Concrete pavement demo and disposalCU FT
22Concrete RestorationCubic Yard
23Asphalt pavement demo and dsiposalSQ FT
24Asphalt Restoration - including 12" limerock baseSQ FT
25Sod restoration includes labor, prep, any required top soil or fill and sodSQ FT
26Markup on pre-approved specialty suppliesmaterials and services- Cost plus markup based on the vendor's cost, Cannot exceed 15%%
27Engineered Drawings - Cost plus %-Cannot exceed 15%%
28Pay for Performance Bond percent %%