Price_Sheet_0548FAC-RFP-MOC_Lift_Station_Water_&_Wastewater_Treatment_Plants.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Lift Station Water & Wastewater Treatment Plants
Solicitation number
0548FAC-RFP-MOC
Issued by
Hillsborough County, Florida

About this file

The provided file is a Price Sheet (0548FAC-RFP-MOC) for Hillsborough County Public Schools (HCPS) in Tampa, Florida, soliciting comprehensive maintenance services for lift stations, water, and wastewater treatment plants. The Request for Proposals seeks to establish contracts with primary and secondary contractors across three geographical maintenance areas: West, Central, and East, covering services such as wet well coating, pump transportation, confined space entry, lift station testing, and bypass pump operations. The solicitation includes a pre-proposal meeting scheduled for April 9, 2025, at 9:00 AM, with technical questions due by April 16, 2025, at 12:00 PM, and proposals due on April 23, 2025, at 12:00 PM. The initial contract term will begin upon board approval, with potential automatic renewals for up to four additional one-year periods, contingent on budget appropriations and contractor performance.

The pricing structure includes detailed hourly rates for various labor categories during standard and non-standard work hours, with a maximum 15% markup on materials and engineered drawings. HCPS strongly encourages participation from Office of Supplier Development (OSD) certified small business enterprises, particularly those owned by minorities, women, and service-disabled veterans. Projects under $10,000 will be considered routine, while those exceeding $200,000 will require payment and performance bonds as mandated by Florida Statute 255.05. The solicitation suggests an average of 11.4 lift station-related maintenance requests per month over the past 12 months and reserves the right to make multiple awards and reject any proposal, indicating flexibility in contractor selection and potential engagement of multiple vendors based on geographical areas and service capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

0548FAC-RFP-MOC Lift Station, Water & Wastewater Treatment Plants
Vendor Name:
Please complete the blue sections. No Hand Written Responses
DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF
ItemDESCRIPTIONUnit of MeasureUnit Cost
1Wet well coating w/ (2) coats of coal tar epoxy for 16 mils dry film thickness - per product manufacture's recommendations - includes labor and materialsSquare Foot
2Pump transportation between job sites and Mader Electric Motors, Tampa - each wayEach
3Surcharge applicable to projects requiring entry into "confined spaces" - one per projectEach
4Lift Station Pumpdown Test w/ Written Documentation - includes labor and materialsEach
5Pumping and off-site disposal of lift station contents - includes labor and equipmentGallon
6Bypass pump installation and removal - includes labor, materials and equipmentEach
7Bypass pump operation - includes labor and materialsDay
8Labor for services not associated with items listed above - Mechanic - Standard Hours On Site MF-6:00am to 6:00pmHour
9Labor for services not associated with items listed above - Mechanic - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/HolidaysHour
10Labor for services not associated with items listed above - Laborer - Standard Hours On Site MF-6:00am to 6:00pmHour
11Labor for services not associated with items listed above - Laborer - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/HolidaysHour
12Labor for Lift Station/Plant controls diagnostics and repair - Controls - Standard Hours On Site MF-6:00am to 6:00pmHour
13Labor for Lift Station/Plant controls diagnostics and repair - Controls - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/HolidaysHour
14Mobilization Fee - applicable to projects with total itemized costs of less that $2,000.00 - one per projectEach
15Materials markup - Cannot exceed 15%%
16Engineered Drawings - Cost plus %-Cannot exceed 15%%
17Pay for Performance Bond- Percent %%

Sheet1

File details come from the government source that posted it. Updated .