The document is a Price Sheet for Hillsborough County Public Schools (HCPS) related to a competitive solicitation for lift station, water, and wastewater treatment plant services. The procurement seeks to identify qualified general contractors to perform maintenance, cleaning, repairs, replacement, installation, inspection, and testing on critical infrastructure, with projects exceeding $200,000 requiring payment and performance bonds as mandated by Florida Statute 255.05. The price sheet provides a comprehensive itemized list of potential services, including wet well coating, pump transportation, confined space entry surcharges, lift station testing, bypass pump services, and various labor rates for mechanics, laborers, and control technicians during standard and non-standard hours.
The pricing structure includes specific unit costs for each service category, with a maximum 15% markup on materials and engineered drawings. The document allows vendors to complete blue-sectioned areas, prohibiting handwritten responses. Notable pricing components include mobilization fees for projects under $2,000, hourly rates differentiated by time of day and worker classification, and specialized services like lift station content disposal and pump testing. The solicitation appears designed to establish a flexible, comprehensive contract that allows HCPS to procure infrastructure maintenance services on an as-needed basis, with clear pricing expectations and potential cost controls through percentage-based markups and predefined service rates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| 0548FAC-RFP-MOC Lift Station, Water & Wastewater Treatment Plants | |||
| Vendor Name: | |||
| Please complete the blue sections. No Hand Written Responses | |||
| DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF | |||
| Item | DESCRIPTION | Unit of Measure | Unit Cost |
| 1 | Wet well coating w/ (2) coats of coal tar epoxy for 16 mils dry film thickness - per product manufacture's recommendations - includes labor and materials | Square Foot | |
| 2 | Pump transportation between job sites and Mader Electric Motors, Tampa - each way | Each | |
| 3 | Surcharge applicable to projects requiring entry into "confined spaces" - one per project | Each | |
| 4 | Lift Station Pumpdown Test w/ Written Documentation - includes labor and materials | Each | |
| 5 | Pumping and off-site disposal of lift station contents - includes labor and equipment | Gallon | |
| 6 | Bypass pump installation and removal - includes labor, materials and equipment | Each | |
| 7 | Bypass pump operation - includes labor and materials | Day | |
| 8 | Labor for services not associated with items listed above - Mechanic - Standard Hours On Site MF-6:00am to 6:00pm | Hour | |
| 9 | Labor for services not associated with items listed above - Mechanic - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/Holidays | Hour | |
| 10 | Labor for services not associated with items listed above - Laborer - Standard Hours On Site MF-6:00am to 6:00pm | Hour | |
| 11 | Labor for services not associated with items listed above - Laborer - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/Holidays | Hour | |
| 12 | Labor for Lift Station/Plant controls diagnostics and repair - Controls - Standard Hours On Site MF-6:00am to 6:00pm | Hour | |
| 13 | Labor for Lift Station/Plant controls diagnostics and repair - Controls - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/Holidays | Hour | |
| 14 | Mobilization Fee - applicable to projects with total itemized costs of less that $2,000.00 - one per project | Each | |
| 15 | Materials markup - Cannot exceed 15% | % | |
| 16 | Engineered Drawings - Cost plus %-Cannot exceed 15% | % | |
| 17 | Pay for Performance Bond- Percent % | % |