Price_Sheet_0548FAC-RFP-MOC_Lift_Station_Water_&_Wastewater_Treatment_Plants_-Revised.xlsx

XLSX spreadsheet 111 KB Posted

Attached to
Lift Station Water & Wastewater Treatment Plants
Solicitation number
0548FAC-RFP-MOC
Issued by
Hillsborough County, Florida

About this file

This document is a Price Sheet for Hillsborough County Public Schools (HCPS) soliciting services for lift station, water, and wastewater treatment plant maintenance. The comprehensive price sheet covers 17 line items for various services including wet well coating, pump transportation, confined space entry, lift station testing, bypass pump installation and operation, and labor rates for mechanics, laborers, and control system technicians. The pricing structure accommodates standard and non-standard work hours (Monday-Friday 6:00am-6:00pm, weekends, and holidays), with specific rates for different labor categories and additional service charges such as mobilization fees and materials markup.

The pricing document establishes a framework for contractors to provide maintenance and repair services, with specific cost guidelines including a 15% maximum markup on materials and engineered drawings, and provisions for performance bonds on projects exceeding $200,000 as mandated by Florida Statute 255.05. The contract appears designed to create a flexible pricing mechanism for HCPS to engage qualified contractors for critical infrastructure maintenance across lift stations, water treatment, and wastewater treatment facilities, with pricing that accounts for various service scenarios, labor types, and project complexities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

0548FAC-RFP-MOC Lift Station, Water & Wastewater Treatment Plants
Vendor Name:
Please complete the blue sections. No Hand Written Responses
DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF
ItemDESCRIPTIONUnit of MeasureUnit Cost
1Wet well coating w/ (2) coats of coal tar epoxy for 16 mils dry film thickness - per product manufacture's recommendations - includes labor and materialsSquare Foot
2Pump transportation between job sites and Mader Electric Motors, Tampa - each wayEach
3Surcharge applicable to projects requiring entry into "confined spaces" - one per projectEach
4Lift Station Pumpdown Test w/ Written Documentation - includes labor and materialsEach
5Pumping and off-site disposal of lift station contents - includes labor and equipmentGallon
6Bypass pump installation and removal - includes labor and equipment capable of pumping 30 gpm at 30 psiEach
7Bypass pump operation - includes labor and materialsDay
8Labor for services not associated with items listed above - Mechanic - Standard Hours On Site MF-6:00am to 6:00pmHour
9Labor for services not associated with items listed above - Mechanic - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/HolidaysHour
10Labor for services not associated with items listed above - Laborer - Standard Hours On Site MF-6:00am to 6:00pmHour
11Labor for services not associated with items listed above - Laborer - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/HolidaysHour
12Labor for Lift Station/Plant controls diagnostics and repair - Controls - Standard Hours On Site MF-6:00am to 6:00pmHour
13Labor for Lift Station/Plant controls diagnostics and repair - Controls - Non-Standard Hours On Site MF-6:00pm to 6:00am or anytime on Saturday/Sunday/HolidaysHour
14Mobilization Fee - applicable to projects with total itemized costs of less that $2,000.00 - one per projectEach
15Materials markup - Cannot exceed 15%%
16Engineered Drawings - Cost plus %-Cannot exceed 15%%
17Pay for Performance Bond- Percent %%