Price_Schedule_-_Replace_WH.pdf

PDF 138 KB Posted

Attached to
Replace Water Tanks @ BRCA Federal contract opportunity
Solicitation number
140P6426Q0066
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a Price Schedule for a firm fixed price contract with the National Park Service at Bryce Canyon National Park for a water heater replacement project. The contract covers two locations: Ponderosa Dorm and Bryce Canyon Lodge, with each location requiring removal and disposal of existing water heaters and installation of new water heaters along with all associated work items.

The pricing structure breaks down costs into materials, equipment, and labor categories for both the removal and installation phases at each facility. Each line item is priced on a lump sum (LS) basis with a quantity of one unit. The contractor bears full responsibility for verifying all quantities and measurements to ensure the price provided covers complete project completion. All pricing fields are blank in this template, requiring the bidder to populate unit prices and subtotals for each cost category, with separate subtotals calculated for each building location and a grand total for the entire project.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Tanks @ BRCA, newest first.
File Type Posted
Sol_140P6426Q0066_Amd_0001.pdf PDF
Revised_SOW_-_Replace_WH_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
SOW_-_Replace_WH.pdf PDF
Technical_Questionnaire.pdf PDF
Sol_140P6426Q0066.pdf PDF
Price_Schedule_-_Replace_WH.xlsx XLSX spreadsheet
Technical_Questionnaire.docx DOCX document
Wage_Determination_-_Garfiled_Co.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

SUBTOTAL -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

SUBTOTAL -$

- Materials

National Park Service U.S. Department of Interior Bryce Canyon National Park

PRICE SCHEDULE

PROJECT: Replace Water Heaters

** It is the responsibility of the contractor to verify all the quantities/measurements and to provide a price that will cover the completion of the entire project for this firm fixed price contract. **

- Materials

Grand Total

Removal and disposal of the existing water heater and all associated work/items

- Materials

- Equipment

- Labor

Installation of new water heater and all associated work/items

- Materials

- Equipment

- Labor

BRYCE CANYON LODGE

PONDEROSA DORM

- Equipment

- Labor

- Labor

Removal and disposal of the existing water heaters and all associated work/items

- Equipment

Installation of new water heaters and all associated work/items

Sheet1

File details come from the government source that posted it. Updated .