Price Schedule.xlsx
XLSX spreadsheet 107 KB Posted
- Attached to
- Tank and Bilge Cleaning Services
- Solicitation number
- 70Z04026Q62101Y00
About this file
This document is a comprehensive Price Schedule for a Tank and Bilge Cleaning Services contract for the U.S. Coast Guard. The solicitation covers a base year and four option years for cleaning and liquid removal services at the U.S. Coast Guard Yard in Baltimore, Maryland. The price schedule details extensive pricing breakdowns for multiple service categories including tank cleaning for various liquid types (diesel oil, JP-5 oil, sewage, hydraulic oil, etc.), bilge area cleaning, contaminated liquid disposal, marine chemist certification, underwater hull cleaning, and standby/delay charges.
The contract is structured as a small business set-aside with fixed price delivery orders, covering tank and bilge cleaning across different condition codes (A, B, and C) with varying complexity levels. The estimated quantities are significant, ranging from 750 to 300,000 gallons/square feet depending on the specific service and liquid type. The pricing schedule includes detailed unit prices for removal, disposal, cleaning, and special services like hand scraping, with provisions for fuel credits and delivery to yard facilities. All pricing is currently set at $0, suggesting this is a template or preliminary pricing document awaiting final cost determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00004 Page 2.docx | DOCX document | |
| A00004 Page 1.pdf | ||
| A00003 Page 2.docx | DOCX document | |
| A00003 Page 1.pdf | ||
| A00002 Page 1.pdf | ||
| Copy of Price Schedule.xlsx | XLSX spreadsheet | |
| A00002 Page 2.docx | DOCX document | |
| A00001 PAGE 2.docx | DOCX document | |
| A00001 Page 1 Final.pdf | ||
| USCG_YARD_SWPPP_April2024_20SW.pdf | ||
| SFLC-Std-Spec-0000-(2022).pdf | ||
| SFLC-Std-Spec-8634-(2020).pdf_safe.pdf | ||
| SOW - Tank and Bilge.docx | DOCX document | |
| EMS MANUAL _ 2024 _ FINAL_8.16.24.docx | DOCX document | |
| Solicitation - Tank and Bilge.docx | DOCX document | |
| YARD SPCC Plan_Update_FINAL_2020_Final-Complete_pdf.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 year Summary
PRICE SCHEDULE TANK & BILGE CLEANING CONTRACT
| COST | |
| BASE YEAR | $0.00 |
| OPTION YEAR 1 | $0.00 |
| OPTION YEAR 2 | $0.00 |
| OPTION YEAR 3 | $0.00 |
| OPTION YEAR 4 | $0.00 |
TOTAL COST $0.00
Base Year
| Price Schedule |
| BASE YEAR |
| TANK/BILGE - CLEANING |
| STORAGE TANKS– LIQUID REMOVAL/DISPOSAL |
Addendum A – Base Year
Item No. Description
| 0001. | Tank Cleaning in accordance with Section 1.3, “Statement of Work" |
| Provide unit and total price for each item. |
0001A. REMOVE and DISPOSE of the following from vessels either at berth
| NOTE: REMOVALS WILL BE CONSIDERED INCOMPLETE WITHOUT |
| COPIES OF THE BILL OF LADING. (Reference Attachment 1. Statement of Work for |
| Tank Cleaning, Para. 1.3.1.1) |
Unit Unit Price Est. Qty/Gal Total Price
0001A1. Diesel Oil 1 gal 20,000 $0
0001A2. Void 1 gal 6,000 $0
0001A3. JP-5 Oil 1 gal 13,500 $0
0001A4. Lubricating Oil 1 gal 5,250 $0
0001A5. Sewage Effluent 1 gal 20,000 $0
0001A6. Hydraulic Oil 1 gal 4,500 $0
0001A7. Used Oil 1 gal 21,000 $0
| 0001A8. | Ballast Water | 1 gal | 150,000 | $0 |
| (NTE 2% of total tank capacity) |
| 0001A9. | Potable Water | 1 gal | 20,000 | $0 |
| (NTE 2% of total tank capacity) |
| 0001A10. | 50% Mixture Nalcool/Water | |||
| (Antifreeze) | 1 gal | 3,750 | $0 |
| 0001A11. | Oily Water | 1 gal | 50,000 | $0 |
| (Contents average 80% water) |
SUB TOTAL ITEM 1A $0
Addendum A – Base Year
Item No. Description
| 0001B. | CLEAN TANKS (Condition Code A) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
0001B1. Diesel Oil 1 gal 60,000 $0
0001B2. Voids 1 gal 750 $0
0001B3. JP-5 oil, 1 gal 5,000 $0
0001B4. Sewage 1 gal 7,500 $0
0001B5. Lubricating oil, 1 gal 750 $0
0001B6. Hydraulic oil, 1 gal 750 $0
0001B7. Used oil, 1 gal 750 $0
0001B8. Ballast water 1 gal 200,000 $0
0001B9. Potable water 1 gal 750 $0
0001B10. Oily Water 1 gal 51,000 $0
. SUB TOTAL ITEM 1B $0
Addendum A – Base Year
Item No. Description
| 0001C. | CLEAN TANKS (Condition Code B) in accordance with the Performance Work Statement (1.3.1.1) for tank cleaning |
| and removal of tank content below suction, including residual cleaning water. Wipe dry to | |
| finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
0001C1. Diesel Oil, 1 gal 200,000 $0
0001C2. Voids 1 gal 52,500 $0
0001C3. JP-5 oil, 1 gal 10,000 $0
0001C4. Sewage 1 gal 100,000 $0
0001C5. Lubricating oil, 1 gal 11,250 $0
0001C6. Hydraulic oil, 1 gal 3,750 $0
0001C7. Used oil, 1 gal 3,750 $0
0001C8. Ballast water 1 gal 125,000 $0
0001C9. Potable water 1 gal 40,000 $0
0001C10. Oily Water 1 gal 18,750 $0
0001C11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
0001C12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1C $0
Addendum A – Base Year
Item No. Description
| 0001D. | CLEAN TANKS (Condition Code C) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
0001D1. Diesel Oil, 1 gal 11,250 $0
0001D2. Voids 1 gal 3,750 $0
0001D3. JP-5 oil, 1 gal 750 $0
0001D4. Sewage 1 gal 10,000 $0
0001D5. Lubricating oil, 1 gal 3,750 $0
0001D6. Hydraulic oil, 1 gal 750 $0
0001D7. Used oil, 1 gal 3,750 $0
0001D8. Ballast water 1 gal 15,000 $0
0001D9. Potable water 1 gal 750 $0
0001D10. Oily Water 1 gal 750 $0
0001D11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
0001D12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1D $0
Addendum A – Base Year
Item No. Description
| 0001E. | REMOVE and DISPOSE OF FUEL and LUBE OIL SURPLUS when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
| 0001E1. | Credit for diesel oil | 1 gal | 75,000 | $0 |
| (98% pure) |
| 0001E2. | Credit for JP-5 | 1 gal | 7,500 | $0 |
| (98% pure) |
SUB TOTAL ITEM 1E $0
| 0001F. | REMOVE and DELIVER FUEL TO Yard facilities diesel storage tank when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
0001F.1 Deisel Oil 1 gal 101,250 $0
| NOTES: (1) For evaluation purposes, the total credits for item 1E will be deducted |
| from the invoice amount of the delivery order. (2) The minimum quantity for credit |
| application is 1500 gallons of diesel oil per call. |
| Addendum A – Base Year |
| Bilge Cleaning |
Item No. Description
| 0002. | Bilge areas CLEANED in accordance with Section 1.3.1.2, “Performance Work Statement for Bilge |
| Cleaning.” |
| 0002a. | REMOVE and DISPOSE of waste and/or contaminated sludge, oil, fuel, cleaning agent and |
| other contaminated liquid and all debris and rags from the designated bilge areas. | |
| Contaminated liquids in these bilge areas average 95 percent water. Wipe dry to finished | |
| surface removing all residue. |
Unit Unit Price Est. Qty/Gal Total Price
| 0002A1. | Contaminated | 1 gal | 60,000 | $0 |
| Liquids. |
| CLEAN (Condition Code A) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
0002A2. Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code B) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
0002A3 Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code C) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
0002A4 Bilge 1 sq. ft. 20,000 $0
| SUB TOTAL ITEM 2 | $0 | |
| Addendum A – Base Year | ||
| Contaminated Liquid Removal/Disposal | ||
| Yard Storage Tanks |
Item No. Description
| 0003. | Contaminated Liquid Disposal in accordance with the Performance Work Statement Section 1.3.2, |
| “Contaminated Liquid Discharge.” Provide unit and total price. |
| 0003a. | PUMP-OUT, COLLECT & REMOVE waste liquids and sludge from each storage tanks |
| located at the U.S. Coast Guard YARD. |
Unit Unit Price Est. Qty/Gal Total Price
| 0003A1. | Storage tanks | 1 gal | 200,000 | $0 | |
| Contents average | |||||
| 80% water. | |||||
| SUB TOTAL ITEM 3 | $0 |
| Addendum A – Base Year |
| MARINE CHEMIST CERTIFICATION |
Item No. Description
| 0004. | Provide written CERTIFICATION by a Marine Chemist that the specified areas worked are |
| gas free, safe for men and safe for hot work. Price to be per call, per vessel at the U.S. Coast | |
| Guard YARD. |
Unit Unit Price Est. Qty/Calls Total Price
0004A1. Call/Vessel 1 call 25 $0
SUB TOTAL ITEM 4 $0
| Addendum A – Base Year |
| Underwater Hull Cleaning |
| Yard Storage Tanks |
Item No. Description
| 0005. | Underwater Hull Cleaning in accordance with the Performance Work Statement Section 1.3.1.4, |
| “Underwater Hull Cleaning.” Provide unit and total price. |
0005a. Power washing services for cleaning underwater hull and appendages of vessels
Unit Unit Price Est. Qty/Gal Total Price
0005A1. Vessel/Vessels 1 SQFT 198,750 $0
SUB TOTAL ITEM 5 $0
| Item No. | Description | |
| 0006. | Standby/delay charge for equipment and personnel for when situations arise that keeps the contractor outside the scope of work due to unforeseen delays |
0006a Fuel removal hourly standby rate fuel removal 1 hour 30 $0.00
0006b Tank cleaning hourly standby rate 1 hour 30 $0.00
SUB TOTAL ITEM 6 $0.00
SUMMARY
| Item 1 | $0 | |
| Item 2 | $0 | |
| Item 3 | $0 | |
| Item 4 | $0 | |
| Item 5 | $0 | |
| Item 6 | $0 | |
| Total | $0 | |
| Item 1e Credit | $0 |
Grand Total $0
Option Year 1 Price Schedule
| ADDENDUM A – SCHEDULE OF SUPPLIES/SERVICES AND PRICES |
| Option Year one (1) |
| TANK/BILGE - CLEANING |
| STORAGE TANKS– LIQUID REMOVAL/DISPOSAL |
Addendum A – Option Year One (1)
Item No. Description
| 1001. | Tank Cleaning in accordance with Section 1.3, “Statement of Work for Tank |
| Cleaning.” Provide unit and total price for each item. |
| 1001A. | REMOVE and DISPOSE of the following from vessels either at berth |
| or dry docked. The estimated quantities shown are for a one-year period. | |
| Tanks will normally be pumped to lowest level by vessels’ installed systems. |
| NOTE: REMOVALS WILL BE CONSIDERED INCOMPLETE WITHOUT |
| COPIES OF THE BILL OF LADING. (Reference Attachment 1. Statement of Work for |
| Tank Cleaning, Para. 1.3.1.1) |
Unit Unit Price Est. Qty/Gal Total Price
1001A1. Diesel Oil 1 gal 30,000 $0
1001A2. Void 1 gal 6,000 $0
1001A3. JP-5 Oil 1 gal 13,500 $0
1001A4. Lubricating Oil 1 gal 5,250 $0
1001A5. Sewage Effluent 1 gal 20,000 $0
1001A6. Hydraulic Oil 1 gal 4,500 $0
1001A7. Used Oil 1 gal 21,000 $0
| 1001A8. | Ballast Water | 1 gal | 200,000 | $0 |
| (NTE 2% of total tank capacity) |
| 1001A9. | Potable Water | 1 gal | 20,000 | $0 |
| (NTE 2% of total tank capacity) |
| 1001A10. | 50% Mixture Nalcool/Water | |||
| (Antifreeze) | 1 gal | 3,750 | $0 |
| 1001A11. | Oily Water | 1 gal | 50,000 | $0 |
| (Contents average 80% water) |
SUB TOTAL ITEM 1A $0
Addendum A – Option Year one (1)
Item No. Description
| 1001B. | CLEAN TANKS (Condition Code A) in accordance with the Statement of Work (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
1001B1. Diesel Oil 1 gal 100,000 $0
1001B2. Voids 1 gal 750 $0
1001B3. JP-5 oil, 1 gal 15000 $0
1001B4. Sewage 1 gal 7,500 $0
1001B5. Lubricating oil, 1 gal 750 $0
1001B6. Hydraulic oil, 1 gal 750 $0
1001B7. Used oil, 1 gal 750 $0
1001B8. Ballast water 1 gal 150,000 $0
1001B9. Potable water 1 gal 750 $0
1001B10. Oily Water 1 gal 51000 $0
. SUB TOTAL ITEM 1B $0
Addendum A – Option Year One (1)
Item No. Description
| 0001C. | CLEAN TANKS (Condition Code B) in accordance with the Performance Work Statement (1.3.1.1) for tank cleaning |
| and removal of tank content below suction, including residual cleaning water. Wipe dry to | |
| finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
1001C1. Diesel Oil, 1 gal 200,000 $0
1001C2. Voids 1 gal 52,500 $0
1001C3. JP-5 oil, 1 gal 60,000 $0
1001C4. Sewage 1 gal 150,000 $0
1001C5. Lubricating oil, 1 gal 11,250 $0
1001C6. Hydraulic oil, 1 gal 3,750 $0
1001C7. Used oil, 1 gal 3,750 $0
1001C8. Ballast water 1 gal 200,000 $0
1001C9. Potable water 1 gal 60,000 $0
1001C10. Oily Water 1 gal 18,750 $0
1001C11. Hand scrapping Deisel Oil Tank 1 gal 150,000 $0
1001C12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1C $0
Addendum A – Option Year one (1)
Item No. Description
| 1001D. | CLEAN TANKS (Condition Code C) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
1001D1. Diesel Oil, 1 gal 11250 $0
1001D2. Voids 1 gal 3,750 $0
1001D3. JP-5 oil, 1 gal 750 $0
1001D4. Sewage 1 gal 15000 $0
1001D5. Lubricating oil, 1 gal 3,750 $0
1001D6. Hydraulic oil, 1 gal 750 $0
1001D7. Used oil, 1 gal 3,750 $0
1001D8. Ballast water 1 gal 15000 $0
1001D9. Potable water 1 gal 750 $0
1001D10. Oily Water 1 gal 750 $0
1001D11. Hand scrapping Deisel Oil Tank 1 gal 150,000 $0
1001D12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1D $0
Addendum A – Option Year One (1)
Item No. Description
| 1001E. | REMOVE and DISPOSE OF FUEL and LUBE OIL SURPLUS when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
| 1001E1. | Credit for diesel oil | 1 gal | 75,000 | $0 |
| (98% pure) |
| 1001E2. | Credit for JP-5 | 1 gal | 7,500 | $0 |
| (98% pure) |
SUB TOTAL ITEM 1E $0
| 1001F. | REMOVE and DELIVER FUEL TO Yard facilities diesel storage tank when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
1001F.1 Deisel Oil 1 gal 101,250 $0
| NOTES: (1) For evaluation purposes, the total credits for item 1E will be deducted |
| from the invoice amount of the delivery order. (2) The minimum quantity for credit |
| application is 1500 gallons of diesel oil per call. |
| Addendum A – Option Year One (1) |
| Bilge Cleaning |
Item No. Description
| 1002. | Bilge areas CLEANED in accordance with Section 1.3.1.2, “Performance Work Statement for Bilge |
| Cleaning.” |
| 1002a. | REMOVE and DISPOSE of waste and/or contaminated sludge, oil, fuel, cleaning agent and |
| other contaminated liquid and all debris and rags from the designated bilge areas. | |
| Contaminated liquids in these bilge areas average 95 percent water. Wipe dry to finished | |
| surface removing all residue. |
Unit Unit Price Est. Qty/Gal Total Price
| 1002A1. | Contaminated | 1 gal | 60,000 | $0 |
| Liquids. |
| CLEAN (Condition Code A) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
1002A2. Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code B) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
1002A3 Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code C) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
1002A4 Bilge 1 sq. ft. 20,000 $0
| SUB TOTAL ITEM 2 | $0 | |
| Addendum A – Option Year One (1) | ||
| Contaminated Liquid Removal/Disposal | ||
| Yard Storage Tanks |
Item No. Description
| 1003. | Contaminated Liquid Disposal in accordance with the Performance Work Statement Section 1.3.2, |
| “Contaminated Liquid Discharge.” Provide unit and total price. |
| 1003A. | PUMP-OUT, COLLECT & REMOVE waste liquids and sludge from each storage tanks |
| located at the U.S. Coast Guard YARD. |
Unit Unit Price Est. Qty/Gal Total Price
| 1003A1. | Storage tanks | 1 gal | 200,000 | $0 | |
| Contents average | |||||
| 80% water. | |||||
| SUB TOTAL ITEM 3 | $0 |
| Addendum A – Option Year One (1) |
| MARINE CHEMIST CERTIFICATION |
Item No. Description
| 1004. | Provide written CERTIFICATION by a Marine Chemist that the specified areas worked are |
| gas free, safe for men and safe for hot work. Price to be per call, per vessel at the U.S. Coast | |
| Guard YARD. |
Unit Unit Price Est. Qty/Calls Total Price
1004A1. Call/Vessel 1 call 25 $0
SUB TOTAL ITEM 4 $0
| Addendum A – Option Year One (1) |
| Underwater Hull Cleaning |
| Yard Storage Tanks |
Item No. Description
| 1005. | Underwater Hull Cleaning in accordance with the Performance Work Statement Section 1.3.1.4, |
| “Underwater Hull Cleaning.” Provide unit and total price. |
1005a. Power washing services for cleaning underwater hull and appendages of vessels
Unit Unit Price Est. Qty/Gal Total Price
1005A1. Vessel/Vessels 1 SQFT 213,750 $0
SUB TOTAL ITEM 5 $0
| Item No. | Description | |
| 1006. | Standby/delay charge for equipment and personnel for when situations arise that keeps the contractor outside the scope of work due to unforeseen delays |
1006a Fuel removal hourly standby rate fuel removal 1 hour 30 $0.00
1006b Tank cleaning hourly standby rate 1 hour 30 $0.00
SUB TOTAL ITEM 6 $0.00
SUMMARY
| Item 1 | $0 | |
| Item 2 | $0 | |
| Item 3 | $0 | |
| Item 4 | $0 | |
| Item 5 | $0 | |
| Item 6 | $0 | |
| Total | $0 | |
| Item 1e Credit | $0 |
Grand Total $0
Option Year 2 Price Schedule
| ADDENDUM A – SCHEDULE OF SUPPLIES/SERVICES AND PRICES |
| Option Year Two (2) |
| TANK/BILGE - CLEANING |
| STORAGE TANKS– LIQUID REMOVAL/DISPOSAL |
Addendum A – Option Year Two (2)
Item No. Description
| 2001. | Tank Cleaning in accordance with Section 1.3, “Statement of Work for Tank |
| Cleaning.” Provide unit and total price for each item. |
| 2001A. | REMOVE and DISPOSE of the following from vessels either at berth |
| or dry docked. The estimated quantities shown are for a one-year period. | |
| Tanks will normally be pumped to lowest level by vessels’ installed systems. |
| NOTE: REMOVALS WILL BE CONSIDERED INCOMPLETE WITHOUT |
| COPIES OF THE BILL OF LADING. (Reference Attachment 1. Statement of Work for |
| Tank Cleaning, Para. 1.3.1.1) |
Unit Unit Price Est. Qty/Gal Total Price
2001A1. Diesel Oil 1 gal 20,000 $0
2001A2. Void 1 gal 6,000 $0
2001A3. JP-5 Oil 1 gal 13,500 $0
2001A4. Lubricating Oil 1 gal 5,250 $0
2001A5. Sewage Effluent 1 gal 20,000 $0
2001A6. Hydraulic Oil 1 gal 4,500 $0
2001A7. Used Oil 1 gal 21,000 $0
| 2001A8. | Ballast Water | 1 gal | 150,000 | $0 |
| (NTE 2% of total tank capacity) |
| 2001A9. | Potable Water | 1 gal | 20,000 | $0 |
| (NTE 2% of total tank capacity) |
| 2001A10. | 50% Mixture Nalcool/Water | |||
| (Antifreeze) | 1 gal | 3,750 | $0 |
| 2001A11. | Oily Water | 1 gal | 50,000 | $0 |
| (Contents average 80% water) |
SUB TOTAL ITEM 1A $0
Addendum A – Option Year Two (2)
Item No. Description
| 2001B. | CLEAN TANKS (Condition Code A) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
2001B1. Diesel Oil 1 gal 67,500 $0
2001B2. Voids 1 gal 750 $0
2001B3. JP-5 oil, 1 gal 15000 $0
2001B4. Sewage 1 gal 7500 $0
2001B5. Lubricating oil, 1 gal 750 $0
2001B6. Hydraulic oil, 1 gal 750 $0
2001B7. Used oil, 1 gal 750 $0
2001B8. Ballast water 1 gal 200000 $0
2001B9. Potable water 1 gal 750 $0
2001B10. Oily Water 1 gal 51000 $0
. SUB TOTAL ITEM 1B $0
Addendum A – Option Year Two (2)
Item No. Description
| 2001C. | CLEAN TANKS (Condition Code B) in accordance with the Performance Work Statement (1.3.1.1) for tank cleaning |
| and removal of tank content below suction, including residual cleaning water. Wipe dry to | |
| finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
2001C1. Diesel Oil, 1 gal 220,000 $0
2001C2. Voids 1 gal 52,500 $0
2001C3. JP-5 oil, 1 gal 60,000 $0
2001C4. Sewage 1 gal 100,000 $0
2001C5. Lubricating oil, 1 gal 11,250 $0
2001C6. Hydraulic oil, 1 gal 3,750 $0
2001C7. Used oil, 1 gal 3,750 $0
2001C8. Ballast water 1 gal 150,000 $0
2001C9. Potable water 1 gal 60,000 $0
2001C10. Oily Water 1 gal 18,750 $0
2001C11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
2001C12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1C $0
Addendum A – Option Year Two (2)
Item No. Description
| 2001D. | CLEAN TANKS (Condition Code C) in accordance with the Performance Work Statement (1.31.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
2001D1. Diesel Oil, 1 gal 15000 $0
2001D2. Voids 1 gal 3,750 $0
2001D3. JP-5 oil, 1 gal 750 $0
2001D4. Sewage 1 gal 15000 $0
2001D5. Lubricating oil, 1 gal 3,750 $0
2001D6. Hydraulic oil, 1 gal 750 $0
2001D7. Used oil, 1 gal 3,750 $0
2001D8. Ballast water 1 gal 150000 $0
2001D9. Potable water 1 gal 750 $0
2001D10. Oily Water 1 gal 750 $0
2001D11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
2001D12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1D $0
Addendum A – Option Year Two (2)
Item No. Description
| 2001E. | REMOVE and DISPOSE OF FUEL and LUBE OIL SURPLUS when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
| 2001E1. | Credit for diesel oil | 1 gal | 75,000 | $0 |
| (98% pure) |
| 2001E2. | Credit for JP-5 | 1 gal | 7,500 | $0 |
| (98% pure) |
SUB TOTAL ITEM 1E $0
| 2001F. | REMOVE and DELIVER FUEL TO Yard facilities diesel storage tank when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
2001F.1 Deisel Oil 1 gal 101,250 $0
| NOTES: (1) For evaluation purposes, the total credits for item 1E will be deducted |
| from the invoice amount of the delivery order. (2) The minimum quantity for credit |
| application is 1500 gallons of diesel oil per call. |
| Addendum A – Option Year Two (2) |
| Bilge Cleaning |
Item No. Description
| 2002. | Bilge areas CLEANED in accordance with Section 1.3.1.2, “Performance Work Statement for Bilge |
| Cleaning.” |
| 2002A. | REMOVE and DISPOSE of waste and/or contaminated sludge, oil, fuel, cleaning agent and |
| other contaminated liquid and all debris and rags from the designated bilge areas. | |
| Contaminated liquids in these bilge areas average 95 percent water. Wipe dry to finished | |
| surface removing all residue. |
Unit Unit Price Est. Qty/Gal Total Price
| 2002A1. | Contaminated | 1 gal | 60,000 | $0 |
| Liquids. |
| CLEAN (Condition Code A) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
2002A2. Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code B) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
2002A3 Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code C) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
2002A4 Bilge 1 sq. ft. 20,000 $0
| SUB TOTAL ITEM 2 | $0 | |
| Addendum A – Option Year Two (2) | ||
| Contaminated Liquid Removal/Disposal | ||
| Yard Storage Tanks |
Item No. Description
| 2003. | Contaminated Liquid Disposal in accordance with the Performance Work Statement Section 1.3.2, |
| “Contaminated Liquid Discharge.” Provide unit and total price. |
| 2003A. | PUMP-OUT, COLLECT & REMOVE waste liquids and sludge from each storage tanks |
| located at the U.S. Coast Guard YARD. |
Unit Est. Qty/Gal Total Price
| 2003A1. | Storage tanks | 1 gal | 200,000 | $0 | |
| Contents average | |||||
| 80% water. | |||||
| SUB TOTAL ITEM 3 | $0 |
| Addendum A – Option Year Two (2) |
| MARINE CHEMIST CERTIFICATION |
Item No. Description
| 2004. | Provide written CERTIFICATION by a Marine Chemist that the specified areas worked are |
| gas free, safe for men and safe for hot work. Price to be per call, per vessel at the U.S. Coast | |
| Guard YARD. |
Unit Unit Price Est. Qty/Calls Total Price
2004A1. Call/Vessel 1 call 25 $0
SUB TOTAL ITEM 4 $0
| Addendum A – Option Year Two (2) |
| Underwater Hull Cleaning |
| Yard Storage Tanks |
Item No. Description
| 2005. | Underwater Hull Cleaning in accordance with the Performance Work Statement Section 1.3.1.4, |
| “Underwater Hull Cleaning.” Provide unit and total price. |
2005A. Power washing services for cleaning underwater hull and appendages of vessels
Unit Unit Price Est. Qty/Gal Total Price
2005A1. Vessel/Vessels 1 SQFT 234,000 $0
SUB TOTAL ITEM 5 $0
| Item No. | Description | |
| 2006. | Standby/delay charge for equipment and personnel for when situations arise that keeps the contractor outside the scope of work due to unforeseen delays |
2006A Fuel removal hourly standby rate fuel removal 1 hour 30 $0.00
2006B Tank cleaning hourly standby rate 1 hour 30 $0.00
SUB TOTAL ITEM 6 $0.00
SUMMARY
| Item 1 | $0 | |
| Item 2 | $0 | |
| Item 3 | $0 | |
| Item 4 | $0 | |
| Item 5 | $0 | |
| Item 6 | $0 | |
| Total | $0 | |
| Item 1e Credit | $0 |
Grand Total $0
Option Year 3 Price Schedule
| ADDENDUM A – SCHEDULE OF SUPPLIES/SERVICES AND PRICES |
| Option Year Three (3) |
| TANK/BILGE - CLEANING |
| STORAGE TANKS– LIQUID REMOVAL/DISPOSAL |
Addendum A – Option Year Three (3)
Item No. Description
| 3001. | Tank Cleaning in accordance with Section 1.3, “Statement of Work for Tank |
| Cleaning.” Provide unit and total price for each item. |
| 3001A. | REMOVE and DISPOSE of the following from vessels either at berth |
| or dry docked. The estimated quantities shown are for a one-year period. | |
| Tanks will normally be pumped to lowest level by vessels’ installed systems. |
| NOTE: REMOVALS WILL BE CONSIDERED INCOMPLETE WITHOUT |
| COPIES OF THE BILL OF LADING. (Reference Attachment 1. Statement of Work for |
| Tank Cleaning, Para. 1.3.1.1) |
Unit Unit Price Est. Qty/Gal Total Price
3001A1. Diesel Oil 1 gal 20,000 $0
3001A2. Void 1 gal 6,000 $0
3001A3. JP-5 Oil 1 gal 13,500 $0
3001A4. Lubricating Oil 1 gal 5,250 $0
3001A5. Sewage Effluent 1 gal 20,000 $0
3001A6. Hydraulic Oil 1 gal 4,500 $0
3001A7. Used Oil 1 gal 21,000 $0
| 3001A8. | Ballast Water | 1 gal | 150,000 | $0 |
| (NTE 2% of total tank capacity) |
| 3001A9. | Potable Water | 1 gal | 20,000 | $0 |
| (NTE 2% of total tank capacity) |
| 3001A10. | 50% Mixture Nalcool/Water | |||
| (Antifreeze) | 1 gal | 3,750 | $0 |
| 3001A11. | Oily Water | 1 gal | 50,000 | $0 |
| (Contents average 80% water) |
SUB TOTAL ITEM 1A $0
Addendum A – Option Year Three (3)
Item No. Description
| 3001B. | CLEAN TANKS (Condition Code A) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
3001B1. Diesel Oil 1 gal 67,500 $0
3001B2. Voids 1 gal 750 $0
3001B3. JP-5 oil, 1 gal 15000 $0
3001B4. Sewage 1 gal 7500 $0
3001B5. Lubricating oil, 1 gal 750 $0
3001B6. Hydraulic oil, 1 gal 750 $0
3001B7. Used oil, 1 gal 750 $0
3001B8. Ballast water 1 gal 300000 $0
3001B9. Potable water 1 gal 750 $0
3001B10. Oily Water 1 gal 51000 $0
. SUB TOTAL ITEM 1B $0
Addendum A – Option Year Three (3)
Item No. Description
| 3001C. | CLEAN TANKS (Condition Code B) in accordance with the Performance Work Statement (1.3.1.1) for tank cleaning |
| and removal of tank content below suction, including residual cleaning water. Wipe dry to | |
| finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
3001C1. Diesel Oil, 1 gal 300,000 $0
3001C2. Voids 1 gal 52,500 $0
3001C3. JP-5 oil, 1 gal 60,000 $0
3001C4. Sewage 1 gal 150,000 $0
3001C5. Lubricating oil, 1 gal 11,250 $0
3001C6. Hydraulic oil, 1 gal 3750 $0
3001C7. Used oil, 1 gal 3,750 $0
3001C8. Ballast water 1 gal 225,000 $0
3001C9. Potable water 1 gal 60,000 $0
3001C10. Oily Water 1 gal 18,750 $0
3001C11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
3001C12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1C $0
Addendum A – Option Year Three (3)
Item No. Description
| 3001D. | CLEAN TANKS (Condition Code C) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Unit Price Est. Qty/Gal Total Price
3001D1. Diesel Oil, 1 gal 11250 $0
3001D2. Voids 1 gal 3750 $0
3001D3. JP-5 oil, 1 gal 750 $0
3001D4. Sewage 1 gal 15000 $0
3001D5. Lubricating oil, 1 gal 3750 $0
3001D6. Hydraulic oil, 1 gal 750 $0
3001D7. Used oil, 1 gal 3750 $0
3001D8. Ballast water 1 gal 15000 $0
3001D9. Potable water 1 gal 750 $0
3001D10. Oily Water 1 gal 750 $0
3001D11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
3001D12. Hand scrapping Sewage 1 gal 75,000 $0
| SUB TOTAL ITEM 1D | $0 |
| Addendum A – Option Year Three (3) |
Item No. Description
| 3001E. | REMOVE and DISPOSE OF FUEL and LUBE OIL SURPLUS when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
| 3001E1. | Credit for diesel oil | 1 gal | 75,000 | $0 |
| (98% pure) |
| 3001E2. | Credit for JP-5 | 1 gal | 7,500 | $0 |
| (98% pure) |
SUB TOTAL ITEM 1E $0
| 3001F. | REMOVE and DELIVER FUEL TO Yard facilities diesel storage tank when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
3001F.1 Deisel Oil 1 gal 101,250 $0
| NOTES: (1) For evaluation purposes, the total credits for item 1E will be deducted |
| from the invoice amount of the delivery order. (2) The minimum quantity for credit |
| application is 1500 gallons of diesel oil per call. |
| Addendum A – Option Year Three (3) |
| Bilge Cleaning |
Item No. Description
| 3002. | Bilge areas CLEANED in accordance with the Performance Work Statement (1.3.1.1) for Bilge |
| Cleaning.” |
| 3002A. | REMOVE and DISPOSE of waste and/or contaminated sludge, oil, fuel, cleaning agent and |
| other contaminated liquid and all debris and rags from the designated bilge areas. | |
| Contaminated liquids in these bilge areas average 95 percent water. Wipe dry to finished | |
| surface removing all residue. |
Unit Unit Price Est. Qty/Gal Total Price
| 3002A1. | Contaminated | 1 gal | 60,000 | $0 |
| Liquids. |
| CLEAN (Condition Code A) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
3002A2. Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code B) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
3002A3 Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code C) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
3002A4 Bilge 1 sq. ft. 20,000 $0
| SUB TOTAL ITEM 2 | $0 | |
| Addendum A – Option Year Three (3) | ||
| Contaminated Liquid Removal/Disposal | ||
| Yard Storage Tanks |
Item No. Description
| 3003. | Contaminated Liquid Disposal in accordance with the Performance Work Statement Section 1.3.2, |
| “Contaminated Liquid Discharge.” Provide unit and total price. |
| 3003A. | PUMP-OUT, COLLECT & REMOVE waste liquids and sludge from each storage tanks |
| located at the U.S. Coast Guard YARD. |
Unit Unit Price Est. Qty/Gal Total Price
| 3003A1. | Storage tanks | 1 gal | 200,000 | $0 | |
| Contents average | |||||
| 80% water. | |||||
| SUB TOTAL ITEM 3 | $0 |
| Addendum A – Option Year Three (3) |
| MARINE CHEMIST CERTIFICATION |
Item No. Description
| 3004. | Provide written CERTIFICATION by a Marine Chemist that the specified areas worked are |
| gas free, safe for men and safe for hot work. Price to be per call, per vessel at the U.S. Coast | |
| Guard YARD. |
Unit Unit Price Est. Qty/Calls Total Price
3004A1. Call/Vessel 1 call 25 $0
SUB TOTAL ITEM 4 $0
| Addendum A – Option Year Three (3) |
| Underwater Hull Cleaning |
| Yard Storage Tanks |
Item No. Description
| 3005. | Underwater Hull Cleaning in accordance with the Performance Work Statement Section 1.3.1.4, |
| “Underwater Hull Cleaning.” Provide unit and total price. |
3005A. Power washing services for cleaning underwater hull and appendages of vessels
Unit Unit Price Est. Qty/Gal Total Price
3005A1. Vessel/Vessels 1 SQFT 234,000 $0
SUB TOTAL ITEM 5 $0
| Item No. | Description | |
| 3006. | Standby/delay charge for equipment and personnel for when situations arise that keeps the contractor outside the scope of work due to unforeseen delays |
3006A Fuel removal hourly standby rate fuel removal 1 hour 30 $0.00
3006B Tank cleaning hourly standby rate 1 hour 30 $0.00
SUB TOTAL ITEM 6 $0.00
SUMMARY
| Item 1 | $0 | |
| Item 2 | $0 | |
| Item 3 | $0 | |
| Item 4 | $0 | |
| Item 5 | $0 | |
| Item 6 | $0 | |
| Total | $0 | |
| Item 1e Credit | $0 |
Grand Total $0
Option Year 4 Price Schedule
| ADDENDUM A – SCHEDULE OF SUPPLIES/SERVICES AND PRICES |
| Option Year Four (4) |
| TANK/BILGE - CLEANING |
| STORAGE TANKS– LIQUID REMOVAL/DISPOSAL |
Addendum A – Option Year Four (4)
Item No. Description
| 4001. | Tank Cleaning in accordance with Section 1.3, “Statement of Work for Tank |
| Cleaning.” Provide unit and total price for each item. |
| 4001A. | REMOVE and DISPOSE of the following from vessels either at berth |
| or dry docked. The estimated quantities shown are for a one-year period. | |
| Tanks will normally be pumped to lowest level by vessels’ installed systems. |
| NOTE: REMOVALS WILL BE CONSIDERED INCOMPLETE WITHOUT |
| COPIES OF THE BILL OF LADING. (Reference Attachment 1. Statement of Work for |
| Tank Cleaning, Para. 1.3.1.1) |
Unit Unit Price Est. Qty/Gal Total Price
4001A1. Diesel Oil 1 gal 20,000 $0
4001A2. Void 1 gal 6,000 $0
4001A3. JP-5 Oil 1 gal 13,500 $0
4001A4. Lubricating Oil 1 gal 5,250 $0
4001A5. Sewage Effluent 1 gal 20,000 $0
4001A6. Hydraulic Oil 1 gal 4,500 $0
4001A7. Used Oil 1 gal 21,000 $0
| 4001A8. | Ballast Water | 1 gal | 150,000 | $0 |
| (NTE 2% of total tank capacity) |
| 4001A9. | Potable Water | 1 gal | 20,000 | $0 |
| (NTE 2% of total tank capacity) |
| 4001A10. | 50% Mixture Nalcool/Water | |||
| (Antifreeze) | 1 gal | 3,750 | $0 |
| 4001A11. | Oily Water | 1 gal | 50,000 | $0 |
| (Contents average 80% water) |
$0
Addendum A – Option Year Four (4)
Item No. Description
| 4001b. | CLEAN TANKS (Condition Code A) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Est. Qty/Gal Total Price
4001B1. Diesel Oil 1 gal 67,500 $0
4001B2. Voids 1 gal 750 $0
4001B3. JP-5 oil, 1 gal 15000 $0
4001B4. Sewage 1 gal 7500 $0
4001B5. Lubricating oil, 1 gal 750 $0
4001B6. Hydraulic oil, 1 gal 750 $0
4001B7. Used oil, 1 gal 750 $0
4001B8. Ballast water 1 gal 300000 $0
4001B9. Potable water 1 gal 750 $0
4001B10. Oily Water 1 gal 51000 $0
. SUB TOTAL ITEM 1B $0
Addendum A – Option Year Four (4)
Item No. Description
| 4001C. | CLEAN TANKS (Condition Code B) in accordance with the Performance Work Statement (1.3.1.1) for tank cleaning |
| and removal of tank content below suction, including residual cleaning water. Wipe dry to | |
| finished surface removing all residues. |
Unit Est. Qty/Gal Total Price
4001C1. Diesel Oil, 1 gal 300,000 $0
4001C2. Voids 1 gal 52,500 $0
4001C3. JP-5 oil, 1 gal 60,000 $0
4001C4. Sewage 1 gal 150,000 $0
4001C5. Lubricating oil, 1 gal 11,250 $0
4001C6. Hydraulic oil, 1 gal 3,750 $0
4001C7. Used oil, 1 gal 3,750 $0
4001C8. Ballast water 1 gal 225,000 $0
4001C9. Potable water 1 gal 60,000 $0
4001C10. Oily Water 1 gal 18,750 $0
4001C11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
4001C12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1C $0
Addendum A – Option Year Four (4)
Item No. Description
| 4001D. | CLEAN TANKS (Condition Code C) in accordance with the Performance Work Statement (1.3.1.1) for tank |
| cleaning and removal of tank content below suction, including residual cleaning water. | |
| Wipe dry to finished surface removing all residues. |
Unit Est. Qty/Gal Total Price
4001D1. Diesel Oil, 1 gal 11250 $0
4001D2. Voids 1 gal 3,750 $0
4001D3. JP-5 oil, 1 gal 750 $0
4001D4. Sewage 1 gal 15000 $0
4001D5. Lubricating oil, 1 gal 3,750 $0
4001D6. Hydraulic oil, 1 gal 750 $0
4001D7. Used oil, 1 gal 3,750 $0
4001D8. Ballast water 1 gal 15000 $0
4001D9. Potable water 1 gal 750 $0
4001D10. Oily Water 1 gal 750 $0
4001D11. Hand scrapping Deisel Oil Tank 1 gal 187,500 $0
4001D12. Hand scrapping Sewage 1 gal 75,000 $0
SUB TOTAL ITEM 1D $0
Addendum A – Option Year Four (4)
Item No. Description
| 4001E. | REMOVE and DISPOSE OF FUEL and LUBE OIL SURPLUS when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
| 4001E1. | Credit for diesel oil | 1 gal | 75,000 | $0 |
| (98% pure) |
| 4001E2. | Credit for JP-5 | 1 gal | 7,500 | $0 |
| (98% pure) |
SUB TOTAL ITEM 1E $0
| 4001F. | REMOVE and DELIVER FUEL TO Yard facilities diesel storage tank when |
| directed by the Contracting Officer. |
Unit Unit Price Est. Qty/Gal Total Price
4001F.1 Deisel Oil 1 gal 101,250 $0
| NOTES: (1) For evaluation purposes, the total credits for item 1E will be deducted |
| from the invoice amount of the delivery order. (2) The minimum quantity for credit |
| application is 1500 gallons of diesel oil per call. |
| Addendum A – Option Year Four (4) |
| Bilge Cleaning |
Item No. Description
| 4002. | Bilge areas CLEANED in accordance with the Performance Work Statement (1.3.1.2) for Bilge |
| Cleaning.” |
| 4002A. | REMOVE and DISPOSE of waste and/or contaminated sludge, oil, fuel, cleaning agent and |
| other contaminated liquid and all debris and rags from the designated bilge areas. | |
| Contaminated liquids in these bilge areas average 95 percent water. Wipe dry to finished | |
| surface removing all residue. |
Unit Unit Price Est. Qty/Gal Total Price
| 4002A1. | Contaminated | 1 gal | 60,000 | $0 |
| Liquids. |
| CLEAN (Condition Code A) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
4002A2. Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code B) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
4002A3 Bilge 1 sq. ft. 50,000 $0
| CLEAN (Condition Code C) |
| Bilge areas could be contaminated with heavy sludge as listed below: |
4002A4 Bilge 1 sq. ft. 20,000 $0
SUB TOTAL ITEM 2 $0
| Addendum A – Option Year Four (4) |
| Contaminated Liquid Removal/Disposal |
| Yard Storage Tanks |
Item No. Description
| 4003. | Contaminated Liquid Disposal in accordance with Performance Work Statement Section 1.3.2, |
| “Contaminated Liquid Discharge.” Provide unit and total price. |
| 4003A. | PUMP-OUT, COLLECT & REMOVE waste liquids and sludge from each storage tanks |
| located at the U.S. Coast Guard YARD. |
Unit Unit Price Est. Qty/Gal Total Price
| 4003A1. | Storage tanks | 1 gal | 200,000 | $0 | |
| Contents average | |||||
| 80% water. | |||||
| SUB TOTAL ITEM 3 | $0 |
| Addendum A – Option Year Four (4) |
| MARINE CHEMIST CERTIFICATION |
Item No. Description
| 4004. | Provide written CERTIFICATION by a Marine Chemist that the specified areas worked are |
| gas free, safe for men and safe for hot work. Price to be per call, per vessel at the U.S. Coast | |
| Guard YARD. |
Unit Unit Price Est. Qty/Calls Total Price
4004A1. Call/Vessel 1 call 25 $0
SUB TOTAL ITEM 4 $0
| Addendum A – Option Year Four (4) |
| Underwater Hull Cleaning |
| Yard Storage Tanks |
Item No. Description
| 4005. | Underwater Hull Cleaning in accordance with the Performance Work Statement Section 1.3.1.4, |
| “Underwater Hull Cleaning.” Provide unit and total price. |
4005A. Power washing services for cleaning underwater hull and appendages of vessels
Unit Unit Price Est. Qty/Gal Total Price
4005A1. Vessel/Vessels 1 SQFT 234,000 $0
SUB TOTAL ITEM 5 $0
| Item No. | Description | |
| 4006. | Standby/delay charge for equipment and personnel for when situations arise that keeps the contractor outside the scope of work due to unforeseen delays |
4006A Fuel removal hourly standby rate fuel removal 1 hour 30 $0.00
4006B Tank cleaning hourly standby rate 1 hour 30 $0.00
SUB TOTAL ITEM 6 $0.00
SUMMARY
| Item 1 | $0 | |
| Item 2 | $0 | |
| Item 3 | $0 | |
| Item 4 | $0 | |
| Item 5 | $0 | |
| Item 6 | $0 | |
| Total | $0 | |
| Item 1e Credit | $0 |
Grand Total $0
File details come from the government source that posted it. Updated .